ML20077E233

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Updated Fsar.Replacement Pages for Typographical & Grammatical Errors Identified in 830722 Updated FSAR Also Encl
ML20077E233
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/22/1983
From: Crouse R
TOLEDO EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20077E237 List:
References
974, NUDOCS 8307280201
Download: ML20077E233 (1)


Text

Docket No. 50-346 gg License No. NPF-3 Serial No. 974 RCHARO P. CROUSE N"

July 22, 1983 wima3S322, Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Denton:

Accompanying this letter, Toledo Edison is sending one (1) original and twelve (12) copies of Revision 1 of the Davis-Besse Nuclear Power Station, Unit No. 1. Updated Safety Analysis Report (USAR).

As a result of a review of the July 22, 1982 submittal of the USAR, typographical and grammatical errors have been identified. To correct these errors, the July 22, 1983 submittal consists of two separate packages:

1.

Revision 1 to the USAR.

2.

Replacement pages for typographical errors.

Information contained in Revision 1 of the USAR is accurate to January 22, 1983. Revision 1 to the USAR is being submitted pursuant to 10 CFR 50.71.

Very truly yours, f

w..-

RPC:SGW:nif encl.

cc: DB-1 NRC Resident Inspector r.O p 8307280201 830722 PDR ADOCK 05000346 K

PDR THE TOLEOO EDISON COMt'ANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

_