ML20076K326

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Updated Fsar,Vol 21,for Jm Farley Nuclear Plant,Units 1 & 2.Rev Reflects Plant & Procedure Mods Through 830101 & Changes Per 10CFR50.59(b)
ML20076K326
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/01/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20076K328 List:
References
NUDOCS 8307080402
Download: ML20076K326 (3)


Text

.

Mailing Addrese o 18 h S reet Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

%2' '80;f4"'

AlabamaPower s

the southem ekvirc system July 1, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Updated Final Safety Analysis Report (FSAR)

Gentlemen:

In accordance with the requirements of 10CFR50.71(e), Alabama Power Company hereby submits 13 copies of Revision 1 of the Joseph M. Farley Nuclear Plant - Units 1 and 2 FSAR Update. This submittal contains information and analyses which accurately reflect changes made to the facility or procedures through January 1,1983.

In addition, the information submitted includes changes identified in the annual report under the provisions of 10CFR50.59(b). As required, it is provided on a replacement-page basis and accompanied by an effective page list that identifies the current pages of the FSAR.

If you have any questions, please advise.

Yours very truly, Y

F. L. Clayton r.

FLCJr/JLC:ddr-D28 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge

[d[s Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford 8307080402 830701 PDR ADOCK 05000348 1

i l/

K PDR li

6 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Unit No.1 - Docket No. 50-348 Unit No. 2 - Docket No. 50-364 REVISION NO. 1 TO THE UPDATED FINAL SAFETY ANALYSIS REPORT FOR J. M. FARLEY NUCLEAR PLANT UNITS NO. 1 AND 2 UNDER THE ATOMIC ENERGY ACT OF 1954 Alabama Power Company hereby files Revision No. I to its Final Safety Analysis Report for Farley Units 1 and 2.

This revision consists of updated pages for the Final Safety Analysis Report.

ALABAMA POWER COMPANY By:

-2 d ( p,,,, M [

F.' L.' Elayton/ M. 7 Senior Vice President Sworn to and subscribed before me this /8day of A v,_/ fat YAl2f*,$% /

Notary TuS11c'Alabbfa ' State 'st Large

~

My Commission Expires A[ -,,s l

l l

CERTIFICATE OF SERVICE I certify that a copy of Revision No. I to the Alabama Power Company's Final Safety Analysis Report Update for its Joseph M. Farley Nuclear Plant - Units No.1 and 2 under the Atomic Energy Act of 1954 has been forwarded to the designated individual properly addressed on this _,[j[f" day of July,1983 Honorable Charles Whiddon Houston County Commission Post Office Box 1672 Dothan, Alabama 36301 ALABAMA POWER COMPANY Y NGU M

F. L. Clayton, Jf.

Senior Vice President

.