ML20099D422
| ML20099D422 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/02/1992 |
| From: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20099D426 | List: |
| References | |
| C311-92-2099, NUDOCS 9208060011 | |
| Download: ML20099D422 (1) | |
Text
e e
j j
GPU Nuclear Corporation M Nuclear
- .orar8o d.
Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 We'ter's Direct Dial Number:
(717) 948-8005 August 2, 1992 C311-92-2099 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Cycle 9 Core Operating Limits Report, Revision 1 Pursuant to TMI-l Technical Specification Section 6.9.5.4, enclosed is a copy of the Cycle 9 Core Operating Limits Report, Revision 1.
This revision incorporates adjustments to the Cycle 9 Rod index Limits using a plant-specific 2% uncertainty in rod position indication in lieu of the generic 1.5% uncertainty previously assumed.
For Cycle 9, this revision affects the 10515 EFPD to E0C Rod Index Limits only. For future cycles, the revised uncertainty will be applied to rod position limits over the entire cycle.
This change is being made to reflect observed instrument accuracies and to support lnnger operating cycles.
The cycle-specific core operating limits contained in this report have beer, determined in accordance with Technical Specification 6.9.5.
If additional.information is required, please contact us, Sincerely, o
<$ b d d A T. G. Br ghton Vice President and Director, TMI-l TGB/DJD/amk Enclosure cc: -Region I, Administrator TMI-l Senior Resident inspector
\\
A @N
-TMI-l Senior Project Manager 9208060011 920eo2 y
PDR ADOCK 05000289 i
00005a P
PbR l
l GPU Nuc! car Corporabon t. a subsidia y of General Pubhc Ubhbes Corpora %n J