A list of all pages that have property "Title" with value "Forwards Interim Operating Procedures". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20087N325  + (Forwards Interim Findings of Adequacy of Radiological Emergency Response Planning by State & Local Govts at Callaway Nuclear Power Plant, & State of Mo . State of Mo Will Complete Corrective Actions by 840519)
  • ML20140A892  + (Forwards Interim Findings on Adequacy of Radiological Emergency Response Preparation of State & Local Govts..., Based on State of Nj Emergency Response Plan & Exercises Conducted at Salem from 810408-841023.Plans Adequate)
  • ML20063L246  + (Forwards Interim Findings on Offsite Emergency Preparedness at Facility.All Deficiencies Noted in Plan Review & Exercise Evaluation Have Been Corrected,Completed or Scheduled for Completion by Early Jan 1983)
  • ML20084Q523  + (Forwards Interim Findings on Offsite Radiological Emergency Response Preparedness. State & Local Emergency Plans Capable of Being Implemented & Offsite Preparedness Adequate to Provide Reasonable Assurance of Public Health & Safety)
  • ML20033C600  + (Forwards Interim Findings on Plans & Preparedness for Mini 44-CFR350)
  • ML20086A598  + (Forwards Interim Findings,Joint State & Local Radiological Emergency Response Capabilities & Exercise Rept,Joint State & Local Radiological Emergency Response Exercise for Pilgrim Nuclear Power Station,820303)
  • ML20137T043  + (Forwards Interim Guidance Re Guard Vs NRC Decision Dealing W/Arrangements for Medical Svcs for Contaminated/Injured Individuals.Util Must Conform Emergency Plans to Decision & Comply W/Nrc Response to Decision Prior to License Issuance)
  • ML19256F373  + (Forwards Interim Guidance for Upgrade of Emergency Plans Per Reg Guide 1.101.Comments Requested)
  • ML20072C066  + (Forwards Interim Guidance on Definition of Public Meeting)
  • ML20097D045  + (Forwards Interim Guidelines for Containment Purge Operation Clinton Power Station - Unit 1. Info in Encl & Licensing Review Group-II Generic Position Papers 4-CSB & 5-CSB Constitute Response to SER Confirmatory Issue 69)
  • ML20049J276  + (Forwards Interim Guidelines for Preparing Environ Info for Nuclear Facilities to Be Used in Remedying Environ Data Supporting Renewal of License SNM-1097)
  • ML20205H598  + (Forwards Interim Guidelines for Preparing Environ Info for Nuclear Facilities Already in Operation,Per Sh Smiley)
  • ML19259A727  + (Forwards Interim Info Re Recently Completed Generic Efforts Sponsored by Mark I Owners Group in Support of Design for Utils Safety Relief Valve Discharge Device (Quencher))
  • ML19262A486  + (Forwards Interim Inservice Insp Program Re Reactor Vessel Head Corrosion Due to Borated Reactor Coolant Leakage.Asme Insp Code Revision Pending.W/O Encl)
  • ML19340A983  + (Forwards Interim Insp Rept SO-II-7 on 680916-20.No Noncompliance Noted)
  • ML20084M866  + (Forwards Interim Justification Position for Seismic & Environ Qualification of Differential Pressure Indicating Switch Barton 581A,Limitorque Valve Operators for Valve 9416 & Inadequate Core Cooling Instrumentation)
  • NRC-84-0009, Forwards Interim Justification Positions for Seismic & Environ Qualification of Differential Pressure Indicating Barton Switch 288A & in-core Thermocouples,Connectors & Ref Junction Box,Per NUREG-0588.Graph Withheld  + (Forwards Interim Justification Positions for Seismic & Environ Qualification of Differential Pressure Indicating Barton Switch 288A & in-core Thermocouples,Connectors & Ref Junction Box,Per NUREG-0588.Graph Withheld)
  • ML17335A465  + (Forwards Interim LER 98-049-00 Re Emergency Boron Injection Flow Path Being Inoperable.Due to Technical Complexity of Issue,Addl Time Is Required to Submit LER)
  • ML17335A471  + (Forwards Interim LER 98-055-00,re Calibration Error Coupled with Single Failure Resulting in Condition Outside Design Bases for Rod Control Sys.Completion of Condition Rept Is Ongoing.Supplemental LER Will Be Submitted by 990301)
  • ML20091H877  + (Forwards Interim Licensing Contacts for All Licensing Activities,Per NRC 840109 Recommendation in SALP Rept to Improve Performance in Licensing Area by Centralizing Coordination of Licensing Issues)
  • ML20150F284  + (Forwards Interim Monitoring Study for Jul 1978-June 1979. Rept Indicates No Distinct Changes in Water Quality of Lake Wylie)
  • ML20030D244  + (Forwards Interim Monitoring Study for June 1980-Jul 1981)
  • ML18054B103  + (Forwards Interim Operating Criteria for IE Bulletin 79-14 Verification to Resolve NRC Concerns Noted in Insp Rept 50-255/89-24.Criteria Will Be Used to Make Operability Determinations Re Piping & Pipe Supports)
  • ML18054B104  + (Forwards Interim Operating Criteria for IE Bulletin 79-14 Verification to Resolve NRC Concerns Noted in Insp Rept 50-255/89-24.Criteria Will Be Used to Make Operability Determinations Re Piping & Pipe Supports)
  • ML19322C304  + (Forwards Interim Operating Instructions for Control of Steam Generator Level Following RCS Actuation at Any Power Level. Adjustments to Setpoint Level & Design Interface Between RCS & Safety Features Actuation Sys Under Evaluation)
  • ML20203L887  + (Forwards Interim Operation Plan for Auxiliary Bldg Ventilation Sys,Justification for Use of Plan,Results of Offsite & Control Room Dose Analyses Assuming Ventilation Sys Inoperable & Info Re FSAR & SER Dose Calculations)
  • ML20214N528  + (Forwards Interim Operation Plan for Control Room Ventilation Sys at Facility,For Use During Startup.Plan Will Allow Startup Activities to Proceed as Scheduled)
  • ML20090M323  + (Forwards Interim Part 21 Re Defect in Check Valve P/N 72543 (Swing Arm) on Borg-Warner Model 75510 Swing Check Valve)
  • ML20093E259  + (Forwards Interim Part 21 Rept Re Calculational Errors for Missile Doors.Initially Reported on 840629.Further Redesign Required to Determine Extent of Exceeding Specified Design Allowables.Next Rept Will Be Submitted by 840801)
  • ML20127P082  + (Forwards Interim Plugging Criteria Analysis in Response to SE Contained in Amend 95 to License NPF-2,transmitted Via)
  • ML20141G612  + (Forwards Interim Plugging Criteria Return to Power Rept, Per Sixth Refuel Outage SG ISI Rept)
  • ML20141G617  + (Forwards Interim Plugging Criteria Return to Power Rept, Per Sixth Refuel Outage SG ISI Rept)
  • ML17318A636  + (Forwards Interim Position Re Facility Containment Purging & Venting During Normal Operation.During Ongoing Review of Valve Performance Under DBA-LOCA Condition,Facility Meets Interim Position Except on Unit 1,Position 1)
  • ML19257A367  + (Forwards Interim Position on Containment Purging & Venting During Normal Operation Pending Resolution of Isolation Valve Operability.Commitment to Comply W/Encl Position Should Be Submitted within 45 Days)
  • ML19270H773  + (Forwards Interim Position on Containment Purging & Venting During Normal Operation,Pending Resolution of Isolation Valve Operability.Commitment to Comply W/Encl Position Should Be Submitted within 45 Days)
  • ML19273C186  + (Forwards Interim Position on Containment Purging During Normal Operation & Proposed Purge Valve Interim Position Comments.Recommends That 20-day Ltr to Licensees Request That Licensee Comply W/Encl Position in Interim)
  • ML19347C329  + (Forwards Interim Preliminary Draft Rept Review of Recent Malfunctions of BWR Scram Sys)
  • ML18139B262  + (Forwards Interim Progress Rept in Response to IE Bulletin 80-11, Masonry Wall Design. Ltr Updates Response Provided in & Informs of Status of Masonry Wall Analysis Program)
  • ML20092P614  + (Forwards Interim Progress Rept on Development of Emergency Radiological Response Plan for Oj Roberts School District. Aid in Notifying Govt Agencies of Unmet Needs & Deficiencies Requested)
  • ML18057A386  + (Forwards Interim Provisional License DPR-20,authorizing Fuel Loading & Operation of Plant at Steady State Power Levels Not in Excess of 1 Mwt.Fr Notice & Amend 1 to Indemnity Agreement B-40 Also Encl)
  • ML19254F720  + (Forwards Interim Qualitative Response to Item 2B of Attachment a to ,& Final Responses to Items 3A,B, C & D Re Noncondensible Gases)
  • ML19224C884  + (Forwards Interim Radiological Sequence of Events as of 790614.Sequence Does Not Include All Environ Sampling Data, Only That Illustrating Conditions at Time Reported)
  • ML19344A578  + (Forwards Interim Reliability Evaluation Program,Phase II, Procedure & Schedule Guide, Draft Revision 1 & Related Matl,In Response to Concerns Expressed at 800612 Meeting. Submits Response to Re Evaluation Program)
  • RBG-40773, Forwards Interim Relief Request 03,requesting Temporary Relief to Extend Test Frequency & Postpone Testing Required by ASME Section XI,IWV-3521 & IWV-3522 for Inboard Drywell Isolation Check Valve  + (Forwards Interim Relief Request 03,requesting Temporary Relief to Extend Test Frequency & Postpone Testing Required by ASME Section XI,IWV-3521 & IWV-3522 for Inboard Drywell Isolation Check Valve)
  • RC-97-0151, Forwards Interim Relief Request as Suppl to Original Relief Request Dtd 970225,seeking Approval of Alternative to Current Commitments Associated W/Section XI of ASME Code Concerning Corrective Actions  + (Forwards Interim Relief Request as Suppl to Original Relief Request Dtd 970225,seeking Approval of Alternative to Current Commitments Associated W/Section XI of ASME Code Concerning Corrective Actions)
  • ML18153C646  + (Forwards Interim Relief Requests from ASME Section XI Pump Testing Program Re Calibr of New & Existing Flow Instrument Loops in Component Cooling & Svc Water Sys,Rhr Sys & Fuel Oil Sys)
  • ML20153D223  + (Forwards Interim Rept & Request for Addl Info Re Items 4.2.1 & 4.2.2 of Generic Ltr 83-28 Concerning Preventive Maint & Parameter Trending Associated W/Reactor Trip Breaker Operation.Response Unacceptable)
  • ML19210D340  + (Forwards Interim Rept 1 Re Grit Blasting of Fabricated Pipe Assemblies)
  • ML19210D342  + (Forwards Interim Rept 1 Re Grit Blasting of Fabricated Pipe Assemblies)
  • ML19263E123  + (Forwards Interim Rept 10,Initial Approach to Power Tests (B-Series), 781122-790222)