ML19210D342

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept 1 Re Grit Blasting of Fabricated Pipe Assemblies
Date released: 08/12/2019 Download: ML19210D342


Interim Rept 1:on 791019,excessive Base Metal Was Removed in Piping Assembly Elbows.Caused by Grit Blasting W/O Use of Diffuser or Deflection Shields.Piping Assemblies Being Surveyed.Final Rept Will Be Submitted 800131
ML19210D348
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 11/16/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19210D348 (2)
Forwards Interim Rept 1 Re Grit Blasting of Fabricated Pipe Assemblies
ML19210D340
Person / Time
Site: Hartsville Tennessee Valley Authority icon.png
Issue date: 11/16/1979
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210D340 (1)