ML20090M323

From kanterella
Jump to navigation Jump to search
Forwards Interim Part 21 Re Defect in Check Valve P/N 72543 (Swing Arm) on Borg-Warner Model 75510 Swing Check Valve
ML20090M323
Person / Time
Site: Comanche Peak  
Issue date: 03/16/1992
From: Godwin G
BW/IP INTERNATIONAL, INC. (FORMERLY BYRON JACKSON
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20090M326 List:
References
REF-PT21-92 NUDOCS 9203240159
Download: ML20090M323 (1)


Text

...

v.---

n r

n--

~~.re.~w..=~

.e.

w..

.+,

BV~g sw1P internanonat inc.

Y P

i i --; L-g g

Jochon' Puw.pt Unlied Centrifugar 4

Pumps Pump Dmson 16 March 1992 U. S. Nuclear Regulatory Commission Attn' Document Control Desk Washington, D. C.

20555

Subject:

Interim Notification of a Potentially Reportable Issue Pursuant to 10CFR21 Centlemen:

The enclosed Interim Report is submitted in accordance with.10 CFR Part 21 requirements contained in the Federal Register, Vol. 56, No. 147, Wednesday July 31, 1991.

BW/IP is continuing to evaluate the reported deviation for other valves containing P/N 72543. The NRC will be notified of the evaluation results as soon as available.

Very truly yours, l

G.

Go Manager Los Angeles Operations CCC/ah At ta.:h.

t, ~ p, c;.

c' a u \\ -

y

\\

0

'\\ \\

I 9203240159 920316 PDR ADOCK 05000445 S

PDR