Forwards Interim Part 21 Re Defect in Check Valve P/N 72543 (Swing Arm) on Borg-Warner Model 75510 Swing Check Valve
ML20090M323
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/16/1992
From: Godwin G
BW/IP INTERNATIONAL, INC. (FORMERLY BYRON JACKSON
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20090M326 List:
References
REF-PT21-92 NUDOCS 9203240159
Download: ML20090M323 (1)


Text

. . . -

v.--- n r n-- - ~~.re.~w..=~ .e. .- w .. , -- . .,. , .+,

BV~g sw1P internanonat inc.

Y

  • P i --; L-g g i Jochon' -

Puw.pt * '

Unlied  ; ,,,

Centrifugar , 4 ,

Pumps Pump Dmson 16 March 1992 U. S. Nuclear Regulatory Commission Attn' Document Control Desk Washington, D. C. 20555

Subject:

Interim Notification of a Potentially Reportable Issue Pursuant to 10CFR21 Centlemen:

The enclosed Interim Report is submitted in accordance with.10 CFR Part 21 requirements contained in the Federal Register, Vol. 56, No. 147, Wednesday July 31, 1991.

BW/IP is continuing to evaluate the reported deviation for other valves containing P/N 72543. The NRC will be notified of the evaluation results as soon as available.

Very truly yours, l G. Go Manager Los Angeles Operations