Forwards Interim Operating Instructions for Control of Steam Generator Level Following RCS Actuation at Any Power Level. Adjustments to Setpoint Level & Design Interface Between RCS & Safety Features Actuation Sys Under Evaluation
ML19322C304
Person / Time
Site: Crane, Davis Besse  Constellation icon.png
Issue date: 11/29/1978
From: Faist F
BABCOCK & WILCOX CO.
To: Murray T
TOLEDO EDISON CO.
References
TASK-TF, TASK-TMR NUDOCS 8001160827
Download: ML19322C304 (2)


Text

. _.

-Ew

(.

n.

4 Babcock &Wilcox eme cen.rauen crcuc P.O. Bex 1250. Lynencurg. Va. 24505 Tefepnone: (804) 384-5111 Nove=ber 29, 1978 SOM ih2h 620-001h 12321 T3.3.1 i

?

1231h D? 1101.01 SIP #1k/ 323, Rev. 01 Mr. T. D. Murray, Station Superintendent Davis-Besse Nuclear Power Station 5501 North State Route #2 Oak Harbor, Chic k3hh9

Subject:

Control of Stee= Generator ~4ater Level Following SFRCS Actuatics i

Dear Ter f:

The auto essential =cde of ccatrol fc "

C&e 's desigced to au c=atics117 ccatrol stea= generator water level at 120 inches (o6 inches indicated c the sts.rtup range level instru=entatic=) fc11cring as SF203 actuatics.

s Adl,ustments to this level setpoint and the design interface between the SFRCS and SFAS is :urren:1/ under evalus.:ica.

C::11 dese changes have been permanently =ade, the interi= cperating instre.cticas given c the attach---

=ent should be inecrporated into the apprcpriate Is tis-3 esse Unit I pro-cedures.

These interi= cperating instructicas vill pe =i Davis-Besse thit I to ec:-

tinue power operatic.

If you have any questiens, please advise.

Yours tre.17,,

/.-

/

GM Fred E. Tais:

(Acting) Site Operatic s Manager

???::1!

ene1.

cc:

'J. E. Spangler J. G. Ivans, 2 00 R. C. Luke:

S. M. De::ce, 200 R. L. Pittna:

J. D. Lencrd:::, 20 D. A. Lee R. I. 31ancheng, 3Co J. S. Grant, S Co J. C. Such, 3 0c

3. R. 3 eyer, 500 L. 3. Cartin I. C. Nevak, 2 0o E.
  • 4. Svansc= '

60 0 C. R. Domeek, TIOo 80 011 The Babcock & Wi!cox Comcany / Estantstec IS57

o 9

s..:clM OPERAT! iG I'IS~EUC"'IO:iS

%R C0!C30L OF S"TJJ1 GE:iERATOR ~5EL MLLOWI:;G SFECS A0"'*JA'"!Oli AT A!iY POWE3 D':~*

CASE 1:

For any SFRCS actuation without ESFAS e.ctuatics of the EPI Syste=, the operator shall:

lionitor pressurizer level and take preventative action (secure let-a.

down and =anually start the second =akeup pt. p) if required :

=ain-tain indicated pressurizer level, b.

Ensure by casual centrol of the auxiliary feeteater syste=, mainten-ance of steam generator level at 35 inches (indicated) on tha startup range instru=entation.

CASE 2:

For any SFRCS a:tuatien folleved by ESFAS' actuation of the EFI Syste=,

the operator shall:

Place the S??CS in the auto essential =ede if centrol of an.xiliary a.

feeteater is in =snual prier to EFI Syste= initiatien by ESFAS.

b.

Ibnitor stea generater level to ensure aute=atic control at 120 (96 inches indicated) inches on the sta-tup ranse instru=entatien.

rm(;

l'D a

,uj l 7-/ u' fma i

au es w u e

.1/29/78 O