ML20030D244

From kanterella
Jump to navigation Jump to search
Forwards Interim Monitoring Study for June 1980-Jul 1981
ML20030D244
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/25/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20030D245 List:
References
NUDOCS 8109010059
Download: ML20030D244 (1)


Text

s s

DUKE POWER COMPANY l' owr.u lic wixo 4uu Sot:Tri Cut:acu STur.zT, CHAH1DTTIC, N. C. 20242 WIL LI AM O. PA R M E R, J R.

Verr PptSIDFre?

TE L E P++0 N t:Anta 704 S T t A ea.'9 0 D vC 'i O M 373-4083 Augtst 25, 1981 Mr. Harold R. Denton, Director ghg '

4'(

Office of Nuclear Reactor Regulation

'f J. S. Nuclear Regulatory Comm1ssion 8

/

Washington, D. C. 20555 L.

Q 'l h Attention:

Ms. E. G. Adensam, Chief g

Licensing Branch No. 4

[

\\',,.

J,N d6 Re: Catawba Nuclear Station g

4y[

Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

In accordance with Mr. William H. Reagan, Jr.'s February 7, 1977 letter of appro.al of our p*oposed non-radiological preoperational monitoring program, attacned are ten (10) copies of the results of the June 1980 through July, 1981 continuing interim study for the Catawba Nuclear Station.

There have been no modifications to the sttidy, sampling technique or analytical technique from those pre:iously submitted. The continuing interim study has indicated no distinct changes in che water quality of Lake Wylie in the last year.

Very truly yours,

/K 0 William O. Parker, Jr.

ROS/php Attachment cc: w/ attachment COO 3 J. P. O'Reilly, NRC/RII 5

Brad Peacock, SC DHEC

/ /

l 810a010059 810825 PDR ADOCK 05000413 R

PDR