Forwards Interim LER 98-049-00 Re Emergency Boron Injection Flow Path Being Inoperable.Due to Technical Complexity of Issue,Addl Time Is Required to Submit LER
Date released: 05/31/2018 Download: ML17335A465


LER 98-049-00:on 981020,emergency Boron Injection Flow Path Was Inoperable.Caused by Original Design Deficiency. Engineering Evaluation of Event Is Continuing
ML17335A466
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/05/1999
From: Finissi M
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17335A466 (2)
Forwards Interim LER 98-049-00 Re Emergency Boron Injection Flow Path Being Inoperable.Due to Technical Complexity of Issue,Addl Time Is Required to Submit LER
ML17335A464
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1998
From: Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A464 (5)