Forwards Interim Licensing Contacts for All Licensing Activities,Per NRC 840109 Recommendation in SALP Rept to Improve Performance in Licensing Area by Centralizing Coordination of Licensing Issues
ML20091H877
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/15/1984
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-84145, NUDOCS 8406050319
Download: ML20091H877 (3)


Text

_.

\\

9 0

2 PUBLIC SERVICE COMPANY OF COLORADO

[f P.

O. BOX 84O

DENVER, COLORADO 80200 May 15, 1984 Oscan n.z.zz Fort St. Vrain v c c -e.,oc,

Unit No. 1 P-84145 hbbb Mr. Eric H. Johnson Reactor Project Branch Chief

)

Region IV MAY 3 01984 Nuclear Regulatory Commission h,

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 l

DOCKET NO.: 50-267/83-30

SUBJECT:

NRC-PSC Licensing Interface

REFERENCE:

1) NRC letter dated 01/09/84; Johnson to Lee (G-84014)
2) PSC letter dated 01/24/84; Lee to Collins (P-84032)

Dear Mr. Johnson:

The Systematic Assessment of Licensee Performance (SALP) Board Report, Reference (1), evaluated the Public Service Company of Colorado (PSC) management performance of the Fort St. Vrain Project for the period September 1, 1982 through September 30, 1983.

In the SALP report, the NRC made a recommendation that PSC establish a central licensing contract for all licensing activities.

The central licensing contact was recommended to improve PSC performance in the licensing area by centralizing the coordination of licensing issues both internal to PSC and between PSC and the NRC.

The objective of the improved coordination was to provide more detailed and consistent information in response to NRC initiatives.

PSC agrees with the NRC's recommendation and believes that a central licensing contact would be a useful aid in the management of licensing activities.

In accord with this concept an effective

/

oS 840605^319 840515

[*

I PDR ADOch 05000267 I

t G

PDR l

P-84145 Page 2 4

method of implementing the NRC's recommendation for a central licensing contact within PSC is currently being formulated.

Although details of the central licensing contact duties and functions are still being determined, it has been established that the contact will be a part of the PSC (Jality Assurance Department.

This will enable the central licensing contact to work within the existing organizational structure.

Until a central licensing contact can begin to perform the required functions, an interim plan to narrow the NRC-PSC licensing interface within PSC has been developed. NRC contacts should be made with PSC through those persons listed in Attachment 1,

according to their designated areas of responsibility.

PSC personnel have been notified of this change in procedure. By limiting the points of contact, the personnel designated in Attachment I will improve PSC internal coordination and work toward the stated objectives for implementation of the NRC recommendation for a central licensing contact.

PSC is actively pursuing this enhancement of the Fort St. Vrain organizational structure, and will inform the NRC when the final central licensing contact is ready to perform the required functions.

Very truly yours, h

0. R. Lee, Vice President Electric Production ORL/NB:pa Attachment i

-~

c ATTACHMENT 1 to P-84145 INTERIM PSC LICENSING CONTACTS Written correspondence ~from the;NRC.should be addressed to:

0.R. Lee, Vice President Electric Production P.O. Box 840 Denver, C0

_80201 Written' correspondence may be issued to the NRC from any one of the

.following:

l 0.R.-Leer Vice President, Elec' ic Production H.L. Brey, Manager, Nuclear bigineering D.W. Warembourg, Manager, Nuclear Production J.W. Gahm, Quality-Assurance Manager

'NRC verbal ' contact should be made through the following personnel, according to the described areas of responsibility:

H.L. Brey, Manager,. Nuclear Engineering (303) 571-8404 or.

M.H.' Holmes, Nuclear Services Manager (303) 571-8409 for matters' concerning engineering and design, and nuclear fuel management; D.W.' Warembourg, Manager, Nuclear Production (303) 785-1200 or

' C.H. Fuller, Technical / Administrative Services Manager

-(303) 785-1202

-for~

matters

concerning plant operations and maintenance, and

-Technical ~ Specifications or License Amendments.

s

' J.W. Gahm, Quality Assurance Manager (303) 785-1350 80J for matters concerning.the PSC Quality Assurance _ Program.