ML19263E123

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept 10,Initial Approach to Power Tests (B-Series), 781122-790222
ML19263E123
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/21/1979
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263E124 List:
References
P-79111, NUDOCS 7906010217
Download: ML19263E123 (1)


Text

,

public service conspany o1' Cdemic P.O. Box 361, Platteville, Colorado 80651 May 21, 1979 Fort S t.

Vrain Lhit No. 1 P-79111 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Con =1ssion Region IV Office of Inspection and Enforeccient 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 REF:

Facility Operating License No. DP R-34 Do cke t No. 50-267

Dear Mr. Seyfrit:

Enclosed please find a copy of the tenth Startup Report for Fort St.

Vrain Nuclear Generating S tation, thit No. 1.

This report covers the period from November 22, 1978, through February 22, 1979, and is sub-mitted in fulfillment of the requirements of Section 7.5.la of the Fo rt S t. Vrain Technical Specifications.

Very truly yours, N

v%

Don Warembourg

/

Manager, Nuclear Production DW/alk cc: Director, I and E

}7

.44 Director, MIPC 7 90 e 010 2 r1 os po S ili