Forwards Interim Guidance for Upgrade of Emergency Plans Per Reg Guide 1.101.Comments Requested
ML19256F373
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/10/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
AFFILIATION NOT ASSIGNED
Shared Package
ML16340A713 List:
References
FOIA-80-186, RTR-REGGD-01.101, RTR-REGGD-1.101 TAC-12162, NUDOCS 7912190035
Download: ML19256F373 (2)


Text

.

p neau

,o, UNITED STATES j

NUCLEAR REGULATORY COMMISSION y

c WASMNGTON, D. C. 20565 s

4 s, -

/

OCT 10 1979 ALL POWER REACTOR LICENSEES Gentlemen:

This letter is being sent to all licensees authorized to operate a nuclear power reactor and to all applicants with application for a license to operate a power reactor (FSAR docketed).

The NRC recently held regional meetings to discuss the recent impacts on emergery planning and the current regulations, guidance documents and reports concerning emergency planning. At these meetings, the NRR staff axplained that the upgraded emergency plans would be required five weeks after the NRR review team site visit.

Due to subsequent meetings with many licensees and applicants, the staff has detemined that it is necessary to revise the plan preparation and submittal time.

The upgraded emergency plans for all facilities listed number one through number three in enclosure 1 should be submitted, as previously scheduled, five weeks after the NRR review team site visit. The upgraded emergency plans for all facilities listed number four through nine should be submitted by January 1, 1980. This schedule provides for a longer preparation time for the majority of facilities and provides the staff with a more detailed plan to review prior to tne site visit.

The upgraded emergency plans should be submitted in accordance with the fornat of Regulatory Guide 1.101. The upgraded emergency plans will be evaluated against the requirements of Appendix E to 10 CFR Part 50, the regulatory positions set fortn in Regulatory Guide 1.101, and the acceptance criteria contained in Emergency Planning Review Guidelines Number One - Revision One dated September 7, 1979 (enciesed).

Enclosed for your information and use is a document on the basis for emergency actions levels that has been provided to the review teams for interim use.

Your coninents on this document are requested. Coments should be sent to the Secretary of the Comission, U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention: Docketing and Service Branch. All coments received by December 1,1973 will be considered by the Comission.

The NRR staff is continuing their efforts to develop a model plan and will strive to complete their developmental work at the earliest possible date.