Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309H897 + (Forwards Evaluation of Asymmetric LOCA-Related Loadings on Rcs. No Increase in Reactor Pressure Vessel Response to Asymmetric LOCA Loads)
- ML20040F152 + (Forwards Evaluation of Auxiliary Bldg Control Tower & Electrical Penetration Areas at Midland Plant to Fulfill 820111 Commitment.Rept Supports Util Conclusions Re Plant Structural Integrity)
- ML20154A730 + (Forwards Evaluation of Auxiliary Feedwater Sys (AFW) Reliability (Generic Issue 124).Credit for Feed & Bleed as Compensatory Measure in Evaluation of AFW Sys Reliability Inappropriate.Response Requested within 60 Days)
- ML19309G795 + (Forwards Evaluation of Auxiliary Feedwater Sys to Meet SRP 10.4.9 & Branch Technical Position ASB-10-1.Reliability Study by Kaman Sciences Corp Encl)
- ML19309G796 + (Forwards Evaluation of Auxiliary Feedwater Sys to Meet SRP 10.4.9 & Branch Technical Position ASB-10-1.Reliability Study by Kaman Sciences Corp Encl)
- ML20049A334 + (Forwards Evaluation of Auxiliary Feedwater Sys Requirements, Request for Addl Info Re Emergency Feedwater Upgrade & Basis for Auxiliary Feedwater Sys Flow Requirements)
- ML19262A340 + (Forwards Evaluation of B&W Aug 1975 Generic Rept, B&W Operating Experience of Reactor Internals Vent Valves. Concludes That Valves Will Remain Closed During Normal Operation.Discusses Elimination of Vent Valve Flow Penalty)
- ML20005H109 + (Forwards Evaluation of B&W Owners Group Safety & Performance Improvement Program (Spip) at Plant.Evaluation Based on NRC 890918-20 Audit of Plant.Evidence of Adequate Util Corporate & Site Mgt Involvement in Spip Process Noted)
- ML20043F516 + (Forwards Evaluation of B&W Owners Group 890523 Bounding Analysis Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Evaluation Identifies Issues to Be Resolved to Meet Code Limits for 40-yr Plant Life)
- ML19329B838 + (Forwards Evaluation of BAW-10003,Revision 4, Qualification Testing of Protection Sys Instrumentation. Approval Subj to Util Response to Section 6)
- ML19316A064 + (Forwards Evaluation of BAW-10007,Revision 1 & BAW-10029, Control Rod Drive Mechanism Test Program)
- ML19220C171 + (Forwards Evaluation of BAW-1003,Revision 4, Qualification Testing of Protection Sys Instrumentation)
- ML19220A868 + (Forwards Evaluation of BAW-10047,Revision 1, Study of Discontinuities in Control Rod Drive Motor Tube Extensions)
- ML19253C008 + (Forwards Evaluation of BAW-10047,Revision 1 Dtd June 1972)
- ML19319C114 + (Forwards Evaluation of BAW-10100, Reactor Vessel Matls Surveillance Program-Compliance W/10CFR50,App H,For Oconee Class Reactors. Rept Acceptable)
- ML20129C786 + (Forwards Evaluation of BAW-10121P, Reactor Protection Sys Limits & Setpoints. Rept Acceptable for Referencing within Specified Limits.Acceptable Proprietary & Nonproprietary Versions Should Be Published within 3 Months)
- ML20129C790 + (Forwards Evaluation of BAW-10121P, Reactor Protection Sys Limits & Setpoints. Rept Acceptable for Referencing within Specified Limits.Acceptable Proprietary & Nonproprietary Versions Should Be Published within 3 Months)
- ML20199D336 + (Forwards Evaluation of BAW-1875, B&W Owners Group Cavity Dosimetry Program. Rept Acceptable for Referencing in License Applications)
- ML19282C132 + (Forwards Evaluation of BN-TOP-4 Subcompartment Pressure & Temp Transient Analysis)
- ML20210K395 + (Forwards Evaluation of BWR Shroud Cracking Generic Safety Assessment,Rev 1, GENE-523-A107P-0794 & BWR Core Shroud Insp & Evaluation Guidelines, GENE-523-113-0894)
- ML20096G171 + (Forwards Evaluation of Baseline Specimens Reactor Vessel Matls Irradiation Surveillance Program & Proprietary Rept Entitled, Recommended Program for Irradiation Surveillance Of...Reactor Vessel Matls. Proprietary Rept Withheld)
- ML19323H321 + (Forwards Evaluation of Battery Room Ventilation Sys Which Exhausts Into Control Room.Neither Hydrogen Accumulation Nor Loss of Battery Electrolyte Will Pose Safety Hazard or Control Room Habitability Problem)
- ML20090K593 + (Forwards Evaluation of Boston Edison Co Emergency Preparedness Plan for Pilgrim,In Response to 840120 Request for Evaluation of Potential Traffic Bottlenecks That Could Impede Evacuation.Problem Identified in NUREG-0022)
- ML19346A122 + (Forwards Evaluation of CEN-119(B)-P.Rept Acceptable for Ref in Licensing Actions Re Methodology Used to Provide Alarm on Power When DNB-limiting Conditions for Operation Is Exceeded for Units)
- ML19350B949 + (Forwards Evaluation of CEN-133(B), FIESTA,One-Dimensional Two Group Space-Time Kinetic Code for Calculating PWR Scram Reactivities. Rept Acceptable for Ref in Licensing Actions for Various DBE Which Require Reactor Trip)
- RBG-22010, Forwards Evaluation of CLASIX-3 Conservatisms & Quarter-Scale Tests + (Forwards Evaluation of CLASIX-3 Conservatisms & Quarter-Scale Tests)
- ML20132B272 + (Forwards Evaluation of CLASIX-3 Conservatisms & Quarter-Scale Tests.)
- B10303, Forwards Evaluation of CT Yankee Nuclear Power Station, Jul 1981 + (Forwards Evaluation of CT Yankee Nuclear Power Station, Jul 1981)
- ML20149J801 + (Forwards Evaluation of Capability of Prairie Island Units to Mitigate Complete Loss of Feedwater Atws,Including Results of Supporting Analyses Performed by W & NSP Nuclear Analysis Group,As Requested by NRC Staff)
- ML20153G973 + (Forwards Evaluation of Castor V/21 Fuel Basket Subj to Dry Spent Fuel Storage Demonstration Test at Inel. W/O Encl Proprietary Drawings)
- ML19296D678 + (Forwards Evaluation of Category a Lessons Learned Requirements Implementation at Facility.Evaluation Based on Documentation Submitted by Util & Discussions at 800114 & 15 Site Visit)
- ML19339A057 + (Forwards Evaluation of Cause of Discrepancy as Suppl to 740918 Unusual Event Rept.Incorrect Burnups Used for Shuffled Fuel in Calculation of Control Rod Worths)
- ML19305A488 + (Forwards Evaluation of Cause of primary-to-secondary Leak in Steam Generator B During TMI Incident)
- ML20059A221 + (Forwards Evaluation of Cen 387-P, Pressurizer Surge Line Thermal Stratification. Info Provided by C-E Owners Group in Ref 1 & 2 Inadequate to Justify Meeting All Appropriate Limits for 40-yr Plant Life)
- ML20210N830 + (Forwards Evaluation of Certain Identified Pipe Support Discrepancies,Per Wp Ang Request During 841029 Exit Interview)
- ML20081J267 + (Forwards Evaluation of Change & Nonconformance Documents, Independent Assessment of Underpinning)
- ML20099F220 + (Forwards Evaluation of Changes to Design & Const QA Program Per 10CFR50.55(f)(3).Changes Do Not Reduce Commitments in Program Previously Accepted by NRC)
- ML19327A022 + (Forwards Evaluation of Charpy Energy Temp Vs Curve-Fitting Techniques)
- ML20137K466 + (Forwards Evaluation of Chlorine Concentration at Control Bldg Air Intake,Per SER Open Item 14.Reg Guide 1.95 Model Appropriate for Use in Evaluating Control Room Habitability)
- ML20137K470 + (Forwards Evaluation of Chlorine Concentration at Control Bldg Air Intake,Per SER Open Item 14.Reg Guide 1.95 Model Appropriate for Use in Evaluating Control Room Habitability)
- ML20205J691 + (Forwards Evaluation of Chlorine Concentration in Vogtle Electric Generating Plant Control Room, Per SER Open Item 4 Re Toxic Gas Evaluation.Errata Sheet Also Encl)
- ML20008E747 + (Forwards Evaluation of Cladding,Swelling & Rupture Models for LOCA Analysis,Per NUREG-0630,in Response to NRC .Fsar Will Be Amended by 810501 to Reflect Ten Grid Fuel Design)
- ML20197J713 + (Forwards Evaluation of Clay Dispersion.Results of Two Hydrometer Tests Both W/& W/O Dispersant Agent Shown on Figure 1)
- ML19322D908 + (Forwards Evaluation of Cleanup Activities at TMI, Rept of Special Task Force Formed on 800219.Lists Actions to Be Taken in Order to Restore Forward Motion to Cleanup Process)
- ML19322D909 + (Forwards Evaluation of Cleanup Activities at TMI, for Endorsement & Forwarding to Commission.Program Should Be Reassigned High Priority Due to Strong Public Opinion)
- ML20244B006 + (Forwards Evaluation of Cleanup Activities at Tmi. Recommends NRC & Govt Agencies Begin to Plan for Contingency of Possible Intervention to Prevent Util Bankruptcy)
- ML13324A474 + (Forwards Evaluation of Cold Shutdown & Accident Mitigation Sys for San Onofre Unit 1. Rept Supports 841017 & 22 Submittals Re Seismic Capability of Certain safety-related Sys)
- ML20198F514 + (Forwards Evaluation of Comments Received from Other Govt Agencies from Natl Resources Defense Council Re cost- Benefit Analysis in Des)
- ML20071J759 + (Forwards Evaluation of Comments on FSAR Section 2.3.5 Re long-term Diffusion Estimates:Objective & Calculations)
- ML20031B904 + (Forwards Evaluation of Compliance W/App R to 10CFR50, Sections Iii.G,Iii.J,Iii.L & Iii.O Re Fire Protection Program.Encl Identifies & Justifies Differences Between Existing Plant Design Features & Requirement Specs)
- ML19312C155 + (Forwards Evaluation of Compliance w/10CFR50,App 1, Supporting Info,Proposed Tech Specs for Compliance & Applicable Drawings.W/O Encl)