Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Sbwr Closure of Vacuum Breaker Test Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML15118A296  + (Discusses Safety Sys Engineering Insp Repts 50-269/98-03, 50-270/98-03 & 50-287/98-03 on 980302-06 & 0316-20 & Forwards Nov.Insp Identified Two Violation Associated w/1984 Mod to Control Room Ventilation & Air Conditioning Sys)
  • ML14175B489  + (Discusses Safety Sys Functional Insp 50-261/87-06 on 870309- 0415 & Followup Insp Rept 50-261/87-17 on 870526-29 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty Re Failure to Satisfy Fire Protection Requirements)
  • ML17304A672  + (Discusses Safety Sys Functional Insp Diesel Generator & Auxiliary Feedwater Sys Review.Sys Reviews W/Training Effort Now Scheduled to Be Completed by 890228)
  • IR 05000285/1988201  + (Discusses Safety Team Insp Rept 50-285/88-201 on 881031-1110 & Forwards Notice of Violation)
  • ML20211A483  + (Discusses Safety Valve Problems at Plant.Problems Caused by Erroneous 1981 Settings & Personnel Lack of Knowledge of Valves.Valves Rebuilt by Mfg Representative & Reset in 1983)
  • ML19319D088  + (Discusses Safety of Nuclear Power Plants)
  • ML13308A639  + (Discusses Safety of Nuclear Power Plants & Potential Dangers of Exposure to Radioactivity)
  • ML19254D310  + (Discusses Safety of Transporting U Hexafluoride.Hazards Limited to Chemical Toxicity Due to Container Rupture. Transnuclear,Inc Import from France of 20,000 Kgs U,Enriched to 1.15%,conforms W/Std Provisions)
  • ML19330A231  + (Discusses Saginaw Intervenors 710511 & 13 Motions Re ECCS Testing,Complete Disclosure of All Communication Between Parties & Communication Transcript Production for Insp & Copying)
  • ML19329F692  + (Discusses Saginaw Intervenors 710528 Memo Re Document Production by Dow Chemical Co.Dow Schedule Provided on 701201 to Intervenors)
  • ML17300A262  + (Discusses Sale & Leaseback Financing Transaction by Public Svc Co of New Mexico,Per 860714 Telcon & License NPF-41 & Amends 3 & 6.Date for Closing Sale of Public Debt,Which Will Replace Interim Debt,Is 860717.Prospectus Suppl Encl)
  • ML17304A284  + (Discusses Sale & Leaseback Transactions by Public Svc Co of New Mexico,Per 870403 & 0330 Ltrs.Listed Executed Documentation Reflecting Amends & Beneficial Assignments Encl)
  • ML20138H351  + (Discusses Salem Assessment Panel Reply Re Restart Items)
  • ML20206T564  + (Discusses Salem Loss of Residual Heat Removal Event of 890520 & Need for Complete Coverage of Potential Events by Emergency Operating Procedures.Also Encl,Assumptions Used by B&W to Calculate Dose Consequences of SGTRs)
  • ML20138H238  + (Discusses Salem non-classification of Emergencies & Informs That Classified Emergencies Have to Be Reported as Emergencies)
  • ML20006D412  + (Discusses Sample Evaluations of Airborne Releases by NRC Matl Licensees & Forwards List of Furnished Relevant Matl Licensing Guidance & Regulatory Guides)
  • ML20087D656  + (Discusses Sampling Insps of Const Training Records for Personnel Noted in Correspondence CSC-7382.Personnel Listed Cleared to Perform Status Assessment Encl.W/O Encl)
  • ML20034G757  + (Discusses San Luis Obispo Mothers for Peace Reply to PG&E Preliminary Response & Motion for Protective Order)
  • ML19260B243  + (Discusses San Onofre Units 2 & 3 Deficiency Rept Re Use of High Pressure Injection Pump Vendor Acceptance Test Results in Small Break LOCA Analysis.Currently Conducting Small Break Analysis at Facility.Fsar Amend Forthcoming)
  • ML19220C581  + (Discusses Sandia Lab Study of Coolability of Rubblized Core Debris.High Safety Margin Exists for Cooling TMI Core at Atmospheric Pressure by Boiling Cellular Natural Convection)
  • ML20125C720  + (Discusses Sandia Labs Draft Final Rept on Sys Phase I of Task A-17 Re Sys Interaction.Lab Developed Detailed Fault Trees Depicting Sys Failures to Component Level)
  • ML19290C410  + (Discusses Sandia Labs Interim Rept 3,on Sys Interaction.Rept Presents Task Summary & Work Status Up to 790831)
  • ML20248E660  + (Discusses Saturated Hydraulic Conductivities from Constant Head Testing of Monitor Wells & Single Packer Testing of Coreholes)
  • ML20106A068  + (Discusses Savannah District Dam Safety Plan.Plan & Related Maps Forwarded Under Separate Cover.Plan Addresses Emergencies Re Above Normal Reservoir Water Levels &/Or Rapid Release of Large Vol of Water Past Dam)
  • ML19320B391  + (Discusses Save the Valley Addl Comments to Commissioner Re Resumption of Work at Facility,Docketed on 800514.NRC Will Review Document to Determine Whether Addl Enforcement Measures Are Appropriate)
  • ML20101B750  + (Discusses Sbwr Closure of Vacuum Breaker Test Program)
  • ML20101B801  + (Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard)
  • ML20114A367  + (Discusses Sc Remis Confirming Telcon W/Aslb. Applicant Not Contacted Re Completion of Discovery & Interrogatories by 850131.ASLB Should Discourage Exclusive Contact W/Any Party.Related Correspondence)
  • ML20154N568  + (Discusses Schedular Impact of Recent Commission Order for Decommissioning Info.Nrc Will Continue Working W/Schedule Discussed on 880922 in Spite of T Murley Request to Postpone Meeting Scheduled for 881011)
  • ML17333A192  + (Discusses Schedule Change for Monitoring Spray Ponds. Operating Spray Pond Sys Three Times Per Wk Will Not Apply If Sys Tagged Out of Svc,To Accomodate Maint & Scheduled Outages)
  • ML20210E313  + (Discusses Schedule Change for Util Annual Radiological Emergency Response Preparedness Exercise (Fermex 87). Exercise Will Be Conducted on 870819 Instead of 870311)
  • ML20197B820  + (Discusses Schedule Change of Ingestion Pathway Zone Emergency Plan Exercise.Nrc Finds One Time Exception to Emergency Plan Acceptable & Schedule Change Permitted. Exercise Scheduled for 1997 Now Scheduled for 1999)
  • ML19263A892  + (Discusses Schedule Changes in Const & Planning Studies.After Review,Util Concluded That Licensing Activities Re Pending Const Permit Application Should Continue Concurrently W/The Planning Studies)
  • PY-CEI-NRR-1854, Discusses Schedule Changes to Perry Course of Action Program.Informs That Program Validation Complete & Program Changes Pending Final Approval.Single Process Sys Scheduled for Full Implementation by 941015  + (Discusses Schedule Changes to Perry Course of Action Program.Informs That Program Validation Complete & Program Changes Pending Final Approval.Single Process Sys Scheduled for Full Implementation by 941015)
  • ML17059A004  + (Discusses Schedule Extension for Implementation of GL 89-10 Re Program for motor-operated Valves at Facility.Util 930721 Transmittal Memo Forwarding Engineering Spec NMP2-386M,Rev 1 & Document NER-2M-003 Encl)
  • ML17059A026  + (Discusses Schedule Extension for Implementation of GL 89-10 Program for MOVs at Facility,Per Util .Util Extension of Implementation Schedule Acceptable Subj to Listed Conditions)
  • NLS8800421, Discusses Schedule Re Pilot Study for HPCI Sys Design Basis Document,Per 871125 Response to Insp Rept 50-298/87-10  + (Discusses Schedule Re Pilot Study for HPCI Sys Design Basis Document,Per 871125 Response to Insp Rept 50-298/87-10)
  • ML20079M092  + (Discusses Schedule for Activation of Permanent Emergency Operations Facility.Plant Outage Due to Turbine Problems Delaying Completion of Training Required to Operate Facility.Task Will Be Completed by 830201)
  • ML19331D330  + (Discusses Schedule for Alternate 2A ATWS Plant Mods Proposed in Draft Vol 4 of NUREG-0460.Proposed Schedule Unrealistic Due to non-ATWS Mods.Preliminary Schedule of 3.5 Yrs Reached W/Middle South Svcs Is More Realistic)
  • ML20071H082  + (Discusses Schedule for Appearances.Deposition of Marello Will Be Rescheduled for June.Deposition of C Grant Scheduled for 830525.Proceedings Will Be Instituted to Enforce Subpoena Served on M Cioni)
  • ML20040H428  + (Discusses Schedule for BWR Owners Group Compliance W/ NUREG-0737,Item II.K.3.18.Suppl to 810331 Rept Will Be Submitted by 820930.Proposed Logic Mods May Not Be Appropriate.Technical Basis for Conclusion Encl)
  • ML18144A159  + (Discusses Schedule for Billing for Applications,Per 840620 Rev to 10CFR170.Types of Applications Under 6-month Billing Process Listed)
  • ML20077C342  + (Discusses Schedule for Certification of NUHOMS Dry Fuel Storage Sys to Be Used at Plant Next Yr)
  • ML13317A854  + (Discusses Schedule for Completion of Assessments for SEP Topics & Proposed Approach & Schedule for Performing SEP Integrated Assessment,Per 820128 Meeting W/Nrc.Topics Will Be Complete by Dec 1982 Per NUREG-0485.Schedule Encl)
  • ML20116N584  + (Discusses Schedule for Completion of Detailed Control Room Design Review Audit Rept in Response to NUREG-0737,Suppl 1. Probable Action Plan Addressing NRC Recommendations Re Summary Rept Submitted on 850204 Encl)
  • ML20104A732  + (Discusses Schedule for Completion of Evaluations to Address 10CFR50 App R Audit Findings.Evaluation Can Be Completed by 850630)
  • ML17180A877  + (Discusses Schedule for Completion of IPE for External Events in Response to GL 88-20,suppl 4 for Plants.Informs That Proposed Submittal Dates for IPE for External Events Acceptable)
  • ML20005B104  + (Discusses Schedule for Completion of NUREG-0737 Items Prior to Startup from 1982 Refueling Outages)
  • ML19329A311  + (Discusses Schedule for Compliance W/New App I to 10CFR50. Util Plans Cannot Be Finalized Until Receipt of Info from NRC)
  • ML20237L708  + (Discusses Schedule for Compliance W/Requirements of Rev 2 to Reg Guide 1.97 to Install & Make Operational Environmentally Qualified & Seismic Category I Wide Range Instrumentation)
  • B11772, Discusses Schedule for Compliance W/Requirements of 10CFR50.62 Re Atws.Compliance Can Be Achieved by End of First Refueling Outage,Assuming Staff Concurrence W/Westinghouse Owners Group Generic Design by Early 1986  + (Discusses Schedule for Compliance W/Requirements of 10CFR50.62 Re Atws.Compliance Can Be Achieved by End of First Refueling Outage,Assuming Staff Concurrence W/Westinghouse Owners Group Generic Design by Early 1986)