2 TOLEDO Docket No. 50-346
-License No. NPF-3 I$ "
Serial'No. 1115 January 25, 1985 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Eisenhut:
The Toledo Edison Company submitted to you on April 16, 1984 (Serial No.
1042)'a schedule for completing certain evaluations to address the audit
' findings identified during the Nuclear Regulatory Commission (NRC) 10 CFR
~
-50 Appendix R Audit performed at the Davis-Besse Nuclear. Power Station,
. Unit No.~.1 (DB-1).-
These schedules were further-discussed and accepted at the NRC-Toledo Edison Audit Response Program Review meeting of June 12 1984.
With regard'to. Emergency Lighting, an assessment of the adequacy of the
~
emergency _ lighting at DB-1 needed to. implement procedure AB 1203.26, concerning a-fire in the Control Room or Cable Spreading Room, was per-formed and completed as scheduled by December 30, 1983 (NRC letter dated November-23, 1983, Serial No. 1004).
For fires outside of the Control ~ Room and Cable Spreading Room, procedure AB 1203.02, " Serious Station Fire", was approved by the Plant Manager on January 2,;- 1985,' detailing the manual actions necessary to support plant L
shutdown for the respective fire locations.
The final emergency. lighting evaluation to assess the adequacy of lighting with. regard _to Appendix R,'Section III.J. can only now be initiated util-
'izing this procedure as input.
T
\\V THE TOLEDO EDISON COMPANY
' E0tSON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8502010477 850125 i~
PDR ADOCK 05000346
~\\
F-PDR
s.--..
' Dsckst Ns. 50-346' License'No. NPF-3 Serial No. 1115 JJanuary 25,.1985 Page:2 Within Serial No. 1042, a completion date for the final emergency lighting
. evaluation was identified as January 1, 1985. As discussed above, the un-
~
.-availability of.the !' Serious ' Station Fire" procedure until January,1985, chas made it necessary to determine a revised co=p.arton date for the emer-
.gency lighting final evaluation.
It has now been determined that the evaluation can be completed by June 30 1985.
~Very truly yours,
- -,=^ '
RPC:JSH:nif cc: DB-1 NRC Resident Inspector 1
-.)