Letter Sequence Other |
---|
|
|
MONTHYEARML20106F3911984-12-28028 December 1984 Human Factors Engineering Detailed Control Room Design Review In-Progress Audit,Cooper Nuclear Station Project stage: Other ML20107D5231985-02-0404 February 1985 Detailed Control Room Design Review Summary Rept Project stage: Other ML20132G0331985-03-26026 March 1985 Dcrdr,Nebraska Public Power District Cooper Nuclear Station, Technical Evaluation Rept Project stage: Other ML20116N5841985-04-30030 April 1985 Discusses Schedule for Completion of Detailed Control Room Design Review Audit Rept in Response to NUREG-0737,Suppl 1. Probable Action Plan Addressing NRC Recommendations Re Summary Rept Submitted on 850204 Encl Project stage: Other ML20128N3481985-05-24024 May 1985 Informs That Util Terminated All Efforts to Provide Enhancements to Control Room Panels Re 850204 Dcrdr for 3-6 Months.Delay Necessary Since Enhancements to Panels Will Have to Be Removed Per Suppl 1 of NUREG-0737 Project stage: Other ML20135C7551985-09-0505 September 1985 Forwards Status Rept - Dcrdr & Dcrdr,Nebraska Public Power District Cooper Nuclear Station, Technical Evaluation Rept.Requests Evaluation of Concerns Identified During Audit & Review of Util Summary Rept.Supplemental Rept Due 860828 Project stage: Approval 1985-03-26
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207A0701999-05-19019 May 1999 Forwards Rev 3 to CNS Strategy for Achieving Engineering Excellence, Which Provides Effective Tool for Overall Engineering Work Mgt.Commitments Made by Util,Encl ML20206R7601999-05-17017 May 1999 Forwards Annual Radiological Environ Rept,Radiological Environ Monitoring Program,Jan-Dec 1998,per TS 5.6.2 ML20206P9681999-05-13013 May 1999 Forwards Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Safety/Relief Valves ML20206J0741999-05-0404 May 1999 Forwards Rev 14 to CNS QA Program for Operation, Per 10CFR50.54(p) & 10CFR50.71.None of Changes Represent Reduction of Commitments.Summary of Changes,Encl ML20206J2331999-05-0303 May 1999 Forwards CNS Annual Radioactive Effluent Release Rept for 1998 & Offsite Dose Assessment Manual ML20206F2021999-04-30030 April 1999 Informs That NPPD Now Anticipates LAR Committed in Will Be Submitted by 990615.Operability Evaluations Presently in Effect Ensure That ECCS Pumps Are Operable But Nonconforming & Are Capable of Fulfilling Safety Functions ML20206E5461999-04-29029 April 1999 Forwards Cooper Nuclear Station Occupational Radiation Exposure Rept for 1998. Numbers Reported Reflected Tabulation of All Personnel on Site by Work & Job Function. Repts Will Be Corrected & Resubmitted by 990701 ML20205K1151999-04-0101 April 1999 Submits Extension of Commitment Date for Rev to Plant Strategy for Achieving Engineering Excellence from 990331 to 990519.Licensee Requires Addl Time to Finalize & Approve Rev 3 to Plant Strategy for Achieving Engineering Excellence ML20205E4331999-03-31031 March 1999 Forwards First Biennial Rept of Financial Assurance for Decommissioning for Cns,Per 10CFR50.75(f)(1) ML20205A0561999-03-23023 March 1999 Provides Info Detailing Property Insurance Coverage Maintained by NPPD & Midamerican Energy Co for Cns,In Compliance with 10CFR50.54(w)(3) 05000298/LER-1999-001, Forwards LER 99-001-00,including List of NRC Commitments Made by Util1999-03-22022 March 1999 Forwards LER 99-001-00,including List of NRC Commitments Made by Util ML20204G8811999-03-22022 March 1999 Forwards CNS Inservice Insp Summary Rept,Fall 1998 Refueling Outage (RFO-18), IAW Provisions of 10CFR50.55a. Analytical Evaluation for RPV Shell Weld Indications & Augmented Exam Results of RPV Also Included ML20204J4841999-03-19019 March 1999 Requests NRC Review & Approval of CNS ISI Relief Request (RR) PR-04,rev 1.ISI RR PR-04,rev 0 Required CNS to Perform Visual Insp of RPV Head Flange Seal Leak Detection Line. Approval Is Required Because Test Methodology Was Changed 05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl1999-03-16016 March 1999 Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl ML20204C9641999-03-15015 March 1999 Forwards Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20207J5811999-03-10010 March 1999 Forwards Rev 1 to Calculation Nedc 98-024, APRM - RBM Setpoint Calculation ML20207F9661999-03-0101 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-298/98-08.Corrective Actions:Circumstances Surrounding Four Examples Have Been Discussed with Individuals Involved & Counseled,Where Appropriate ML20203C6961999-02-0808 February 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 980701-1231,per 10CFR26.71(d) ML20202H6721999-02-0202 February 1999 Informs of Changes in Schedule Affecting Four Commitments in ,By Greater than One Month & Notifies of Plans to Issue Rev 3 to Strategy for Achieving Engineering Excellence ML20202E2231999-01-28028 January 1999 Forwards Response to NRC 980603 RAI Re NRC Ongoing Review of IPEEE for Cooper Nuclear Station,Submitted 961030 ML20199K6721999-01-19019 January 1999 Requests Extension of Present Due Date to 980202,as Addl Time Is Required to Resolve Issues Raised on Corrective Actions During Senior Mgt Review of Insp Rept 50-298/98-15 05000298/LER-1998-011, Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl1999-01-19019 January 1999 Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl ML20199E6281999-01-14014 January 1999 Forwards Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station.Rept Also Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20206P4171998-12-31031 December 1998 Informs of Extended Completion Due Date of Third Commitment Re EOP Calculations,Per Licensee 980723 Response to Violations Noted in Insp Rept 50-298/98-02.Date Has Been Extended to 990228 ML20199D2251998-12-30030 December 1998 Forwards 1998 CNS Simulator Certification Rept,As Required by 10CFR55.45.Rept Describes Performance Tests Conducted from 1995-98,discusses Performance Test Discrepancies from 1995-98 & Provides Revised Test Plan for 1999-2002 ML20198K2491998-12-23023 December 1998 Discusses RAI Re Response to NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps ML20205A4411998-12-17017 December 1998 Forwards Initial Exam Outline for RO Written Exam to Be Given Week of 990208.Preliminary Copies of License Applications for Candidates Encl ML20196C4011998-11-20020 November 1998 Forwards Rev 1 to Cooper Nuclear Station COLR Cycle 19. Licensee Discovered That COLR Submitted with Contained Incorrect Max Average Planar Linear Heat Generation Rate Curves Specified in Figures 1 to 4 1999-09-20
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A6891990-09-12012 September 1990 Forwards Evaluation of Environ Qualification of Okonite T95/35 Tape Splices in Instrumentation Applications at Facility,Per 900813 Request.Tape Splices Fully Qualified for Use in Plant Instrumentation Circuits in Harsh Environ ML20028G9041990-08-28028 August 1990 Forwards Fitness-for-Duty Program Performance Data for Jan-June 1990.Util 900705 Ltr Provided Addl Info to NRC Re Panel of Drugs Included in Testing Program.Info Re Cutoff Levels for Benzodiazepine in Ltr Incorrect NLS9000369, Forwards Endorsement 80 to Maelu Policy MF-70 & Endorsement 96 to Nelia Policy NF-200,reflecting Shutdown Credit for Most Recent Outage for Nuclear Liability Insurance for Plant1990-08-27027 August 1990 Forwards Endorsement 80 to Maelu Policy MF-70 & Endorsement 96 to Nelia Policy NF-200,reflecting Shutdown Credit for Most Recent Outage for Nuclear Liability Insurance for Plant ML20056A7801990-08-0202 August 1990 Forwards Owners Data Rept for ISI & Owners Rept for Repairs & Replacements NLS9000308, Forwards Info to Demonstrate Util Ability to Obtain Funds for Payment of Deferred Insurance Premiums.Supporting Documentation Encl1990-08-0101 August 1990 Forwards Info to Demonstrate Util Ability to Obtain Funds for Payment of Deferred Insurance Premiums.Supporting Documentation Encl NLS9000196, Responds to Violations Noted in Insp Rept 50-298/90-09. Corrective Actions:To Ensure Future Clarity,District Will Revise Procedures to Clearly Indicate Acceptability of Okonite in Instrumentation Applications1990-07-31031 July 1990 Responds to Violations Noted in Insp Rept 50-298/90-09. Corrective Actions:To Ensure Future Clarity,District Will Revise Procedures to Clearly Indicate Acceptability of Okonite in Instrumentation Applications NLS9000268, Forwards Endorsement 79 to Maelu Policy MF-70 & Endorsement 95 to Nelia Policy NF-2001990-07-10010 July 1990 Forwards Endorsement 79 to Maelu Policy MF-70 & Endorsement 95 to Nelia Policy NF-200 ML20055F3701990-07-10010 July 1990 Informs That Acceptance Criteria for Startup Physics Tests Have Been Met for Recent Cycle 14 Startup,Per NLS9000260, Requests Rev to List of Carbon Copies on NRC Correspondence to util.Marked-up Ltr Showing Revs Encl1990-07-0909 July 1990 Requests Rev to List of Carbon Copies on NRC Correspondence to util.Marked-up Ltr Showing Revs Encl ML20044A8331990-07-0606 July 1990 Informs of New Official Title for Ga Trevors,Effective 900701 NLS9000254, Notifies That Util Fitness for Duty Program Includes Drug Screening for Addl Drugs Over Min Panel of Drugs Required by 10CFR26.Drugs & Testing Cutoff Levels Listed1990-07-0505 July 1990 Notifies That Util Fitness for Duty Program Includes Drug Screening for Addl Drugs Over Min Panel of Drugs Required by 10CFR26.Drugs & Testing Cutoff Levels Listed NLS9000192, Forwards Rev 8 to Updated SAR for Cooper Nuclear Station. Rev 6 to QA Program Transmitted on 900406 Ref in App D.Next Rev to Updated SAR Will Be Submitted on or Before 9107221990-07-0202 July 1990 Forwards Rev 8 to Updated SAR for Cooper Nuclear Station. Rev 6 to QA Program Transmitted on 900406 Ref in App D.Next Rev to Updated SAR Will Be Submitted on or Before 910722 ML20043J0651990-06-22022 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Item 4.1 of Generic Safety Issues 75 Not Applicable to Plant NLS9000217, Submits Followup Response to Insp Rept 50-298/89-34 Re Physical Security Program.Util Completed Safeguards Info Audit of Each Contractor Holding Safeguards Info.Contractor Surrendered All Safeguards Info Documents on Plant to Util1990-06-19019 June 1990 Submits Followup Response to Insp Rept 50-298/89-34 Re Physical Security Program.Util Completed Safeguards Info Audit of Each Contractor Holding Safeguards Info.Contractor Surrendered All Safeguards Info Documents on Plant to Util ML20043G6381990-06-15015 June 1990 Forwards Monthly Operating Rept for May 1990 & Corrected Operating Rept for Apr 1990 for Cooper Nuclear Station ML20043G1101990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Rept 50-298/90-12.Corrective Actions:Individual Senior Technician Status Rescinded & Procedure Describing Qualification Requirements,Including Health Physics Experience,Written ML20043G6471990-06-13013 June 1990 Forwards Decommissioning Funding Plan,Per 10CFR50.75 & Decommissioning Trust Fund Agreement Between Util & Firstier Bank,Lincoln Dtd 900601 ML20043G4581990-06-13013 June 1990 Forwards Endorsements 72-78 to Maelu Policy MF-70 & Endorsements 88-94 to Nelia Policy NF-200 ML20043G3891990-06-13013 June 1990 Forwards Endorsements 14 & 15 to Nelia Policy N-41 & Maelu Policy M-41,respectively ML20043F4981990-06-0505 June 1990 Forwards Changes to Proposed Rev 6 of Plant QA Program for Operation Policy Document Submitted in 900406 & 19 Ltrs ML20043C4381990-05-31031 May 1990 Forwards Change to QA Program for Operation Policy Document for Review & Approval,Per 10CFR50.54(a)(3) ML20043C3091990-05-30030 May 1990 Responds to NRC 900430 Ltr Re Violations Noted in Insp Rept 50-298/90-15.Util Does Not Believe That Violation Existed & Therefore No Corrective Action Required.Inservice Testing Program Being Enhanced as Result of Insp ML20043C7081990-05-25025 May 1990 Forwards Rev 6 to Inservice Testing Program for ASME Class 1,2 & 3 Components, as Committed in Util 890926 Response to Generic Ltr 89-04.Summary Listing of Changes Also Encl NLS9000198, Forwards Public Version of Nebraska Public Power District Cooper Nuclear Station 1990 Evaluated Exercise,9007251990-05-23023 May 1990 Forwards Public Version of Nebraska Public Power District Cooper Nuclear Station 1990 Evaluated Exercise,900725 ML20043B6551990-05-18018 May 1990 Forwards Response to Insp Rept 50-298/90-05 Re Safety/Security Interface Issue.Response Withheld (Ref 10CFR73.21) ML20042F7371990-05-0303 May 1990 Forwards Tech Spec Bases Section 3.12.C, Svc Water Sys, in Response to SSFI Repts 50-298/87-10 & 50-298/89-03 & Implementation of Design Change 90-009, Automatic Isolation of SW-MOV-37MV on Low Svc Water Pressure, for Review ML20042F2821990-05-0101 May 1990 Clarifies Initiating Conditions Listed in 900316 Ltr Re Review of 890919 Rev 11 to Plant Emergency Plan.Gaseous Release Emergency Action Level Established as High Alarm on Effluent Monitor ML20042F1491990-04-30030 April 1990 Provides Response to NRC Safety Evaluation Concerns Re Util Response to Generic Ltr 88-01.Licensee Will Conform to NRC Position on Reporting Requirements ML20042F1481990-04-30030 April 1990 Provides Results of Quarterly Local Leak Rate Test on Containment Purge & Vent Valves at Plant ML20042E4601990-04-12012 April 1990 Forwards Rev IX to Reg Guide 1.97 Instrumentation List to Correct Errors Identified During NRC Insp (Insp Rept 50-298/90-01) ML20042E2031990-04-0606 April 1990 Suppls 900122 Response to Insp Rept 50-298/89-34.Completion Date for External Audits Extended to 900531 ML20042E0791990-03-27027 March 1990 Forwards Annual Radiological Environ Operating Rept 1989. ML20012D9571990-03-23023 March 1990 Submits Supplemental Response to Util 890417 & 0803 Responses to Station Blackout rule,10CFR50.63.Util Reserves Right to Review Final Issue of NUMARC 87-00,App D Prior to Implementation ML20012D9671990-03-20020 March 1990 Lists Present Levels of Property Insurance Coverage,Per 10CFR50.54(w)(1).Policy Expiration Date for Coverage Is 900501.Util Presently Involved in Insurance Renewal Process ML20012C6951990-03-15015 March 1990 Notifies NRC of Intent to Defer Response to Generic Ltr 89-19,per 900306 Approved Scheduler Extension.Response Will Be Submitted on or Before 900504 ML20012C6931990-03-15015 March 1990 Submits Final Response to Generic Ltr 88-14, Instrument Air Supply Problems Affecting Safety-Related Equipment. Final Item,Verification That Mfg Air Quality Requirements for Essential Components,Completed ML20011F5631990-03-0202 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-298/89-31.Corrective Actions:Numbered Lead Seal Installed & Logged When Found Missing on 891113 & Procedure 0.9 Reviewed W/Personnel ML20011F8111990-03-0202 March 1990 Forwards Corrections to Rev 24 to Plant Safeguards Plan.Rev Withheld (Ref 10CFR73.21) ML20012A5061990-02-26026 February 1990 Forwards Proprietary GE11 LTA Fuel Bundle Description for Cooper Nuclear Station Reload 13,Cycle 14. Util Plans to Load Four Fuel Assembly Lead Test Assemblies as Part of Plant Reload 13.Encl Withheld (Ref 10CFR2.790) ML20012C7801990-02-23023 February 1990 Forwards Comments on Questions & Answers Associated w/900221 Exam.Recommends That Comments Be Considered in Written Exam & Serve as Basis for Refining Exam Answers ML20011F6531990-02-21021 February 1990 Lists Property Insurance Coverage Carried by Util W/Nelia & Maelu W/Expiration Dates of 900501 ML20011F1131990-02-15015 February 1990 Requests Relief from Commitment to Continue motor-operated Valve Testing Under Program Established in Response to NRC Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transient Due to Improper Switch Settings. ML20011F0321990-02-14014 February 1990 Responds to NRC 900118 Ltr Re Violations Noted in Insp Rept 50-298/89-37.Corrective Actions:Plant Svcs Procedure 1.6, Warehouse Marking & Tagging Will Be Revised to Delete Requirement of Placing Hold Tag W/Work Item File ML20006C5391990-01-29029 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Applicable HX Performance Evaluation Procedures Will Be Revised by 901231 & Ultrasonic Testing Will Be Performed ML20006A5031990-01-22022 January 1990 Forwards Response to Insp Rept 50-298/89-34.Response Withheld (Ref 10CFR73.21) ML20006A8191990-01-16016 January 1990 Forwards Endorsement 71 to Maelu Policy MF-70 & Endorsement 87 to Nelia Policy NF-200 ML20006A9641990-01-16016 January 1990 Forwards Endorsement 5 to Nelia Certificate NW-107 & Maelu Certificate MW-43 ML20006A5091990-01-16016 January 1990 Forwards Endorsement 13 to Nelia Certificate N-41 & Endorsement 13 to Maelu Certificate M-41 ML20005G5621990-01-0808 January 1990 Forwards Monthly Operating Status Rept for Dec 1989 & Revised Operating Status & Unit Shutdown Data Repts for Nov 1989 for Cooper Nuclear Station ML20005E8661990-01-0404 January 1990 Forwards Rev 25 to Safeguards Plan.Changes Reflect Improvements to Main Vehicle Gate,Restrictions on Warehouse Searches & Distribution Changes for Annual Security Audits. Rev Withheld (Ref 10CFR73.21) 1990-09-12
[Table view] |
Text
-
f ..,
h Nebraska Public Power District NSL8500077
""""Nddk*bieO'***" S April 30,1985 '66-298 Director, Nuclear Reactor Regulation Attention: Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Vassallo:
Subject:
Detailed Control Room Design Review (DCRDR) -
In-Progress Audit Report Response
Reference:
- 1) Letter from J. M. Pilant to D. B. Vassallo, dated February 4, 1985, "NUREG-0737, Supplement 1 -
Detailed Control Room Design Review Summary Report" Your letter of March 20, if65, requested that the District provide our NRC Project Manager with a schedule for addressing various recommendations not already resolved in our DCRDR Summary Report of Reference 1. It is anticipated that the Supplement to our Summary Report will be submitted approximately February,1986. The District must implement an action plan with considerable scope in order to address the staff's recommendations. The most probable action plan is outlined in Attachr.ient 1, including the estimated completion date for each of the various phases. The scheduled dates for completion provided herein are coasidered estimated dates in accordance with our April 15, 1983, response to NUREG-0737, Supplement 1. As defined in Attachment 8 to that document, our NRC Project Manager will be kept informed of all substantive changes in the implementation schedule.
It should be noted that the District will not directly impleraent some of the staff's recommendations. For example, the staff recommends that Regulatory Guide 1.97 instrumentation be available prior to EOP implementation; however, the District is under Order to implement the EOP's prior. to September,1985, before the Regulatory Guide 1.97 efforts are complete. If the staff wishes to discuss-any of the enclosed information in further detail prior to submittal . of our Supplement to the Summary l
Report, the District would welcome an additional meeting with the i staff or a conference call. l goS t i j
P"P%tiH%% PDR- l J
I '.- 'Mr. Domenic 'B.' Vesxllo.
P;ge - 2 _
April 30,1985 It must also -be -recognized that the schedules submitted in Reference' l for accomplishing modifications to the Control Room are . subject to change due to the additional effort required in implementing the staff's recommendations.
-If you have any questions, please call.
Sincerely, Jay. M.- Pilant Manager, Technical Staff Nuclerr-Power Group JMP::?s30/1 2
e 4
?
8 g 4 --w r . --
. . .._ .. ~ . _ . . _ . _ _ _ _ __ .
'Attrchment 1-RESPONSE TO NRC MARCH 20, 1985 DETAILED CONTROL ROOM DESIGN REVIEW IN PROGRESS AUDIT REPORT.
NRC RECOMMENDATION / SUGGESTION NPPD PROBABLE RESOLUTION / ACTION ESTIMATED COMPLETION DATE I. Task Analysis - Recommendations
- a. Task analysis. definition of inferma- Characteristics of information and _
September ~30,,19851
-tion and control characteristics for controls required to perform the E0Ps
.the E0Ps should; define requirements will'be expanded in order to define for operability under accident con- requirements for operability:under dition (e.g., power quality and accident conditions. This informa-
. qualification of portions of the tion will be contained in the task-instrument and control loops lo- analysis sheets.
cated in harsh environments).
b.. Task analysis definition of informa- For tasks that require the operator. September 30, 1985 tion and control characteristics for to determine the magnitude of a the E0Ps should;. identify require- parameter, the required indicator ments.on indicator resolution for accuracy will be noted in the task
' tasks that require the operator to analysis sheets.
' determine the value of a parameter or compare the value of a parameter
.against a action, control or caution point.
- c. . Task analysis definition of informa- The task analysis sheets will be re- September 30, 1985 tion and control characteristics'for viewed and where details are lacking, the E0Ps should; maintain a.consis- additional details will be provided, tent level of detail throughout the Information regarding information^and analysis. control requirements for operability.
under accident conditions and indi-cator accuracy will' provide _such addi-tional detail.
I
NRC RECOMMENDATION /SUCCESTION HPPD PROBABLE RESOLUTION / ACTION ESTIMATED COMPLETION.DATE~
- d. Function and Task Analysis'should be A' Verification and Valida' tion process' lN/Av
,. carried through:to; Normal Proce- -was used to verify;the adequacy.of
'dures implicitly referenced.in E0Ps the E0Ps. A Function and. Task Analy-
'that are required to support perfor- sis is felt to be. unnecessary for mance of,EOPs.. Norma 1' Procedures. implicitly refe .
renced;in the E0Ps. _The station pro-cedural' initiation, approval process, and on going review process of,these.
Normal Procedures are judged to be adequate measures to ensure.that such procedures.can sufficiently support the.EOPs as' required.
- e. Function and Task Analysis should be A Verification and Validation-process N/A carried through to; existing Emer- was used to verify the adequacy of-
.gency Procedures to the extent they the EOPs. A Function and Task Analy-wil1~still:be in use after implemen- sis is felt to be unnecessary'for the tation-of the E0PS. existing Emergency Procedures which will still be in use after.implemen-tation of the EOPs. The station pro-cedural initiation, approval process, and ongoing review of.these proce-
'dures ensures.adaquacy and workabil-ity of these procedures.
'f.. Function and Task Analysis should be The Verification and Validation pro- N/A
. carried through to; revised E0Ps, if cess used on the E0Ps are judged to significant revisions are required. be adequate by~NPPD, and. additional prior to implementation. Function and Task ~ Analysis is con-sidered unnecessary for the E0Ps.
If significant revisions are required
.to the E0Ps prior to implementation, a Verification and Validation-process will be conducted on the revisions.
2
n- - . - -. .- .
tr NRC RECOMMENDATION / SUGGESTION NPPD PROBABLE' RESOLUTION / ACTION ESTIMATED COMPLETION DATE'
' g. ' Function and Task An'alysis should be The need:for a Function and-Task . February, 1986 carried through to; SPDS'and PMIS '
= Analysis for the SPDS and PMIS. Pro .
. Procedures _ required to support per ' cedures will be, assessed upon develop-formance of:EOFa. ment of the procedures.. The.SPDS will be operable February,1986.
~
II. Control Room Survey.- Recommendations
- a. .The apparentfoversights noted.in the 1A Control-Room Survey will be per- November 30,;1985 Control. Room Survey'nhould.be re- formed guided by NUREG 0700 and dis- ,
viewed to determine'if.they are indi- crepancies will be identified-and catfie of a systematic problem with assessed for safety importance.
'the survey process, and appropriate action should be taken.
- b. The control lnuma environment and A Control Room environment and commu- February, 1986 communications survey should be re- nications survey will be conducted by
- peated after completion of planned a Human Factors consultant following modifications that will affect the Control Room modifications, environment (e.g., PMIS, SPDS,'and a new communications system)~. -This resurvey should consider the ability of operators to communicate while wearing self-contained. breathing apparatus and. respirators.
- c. Human Factors principles, conven- SPDS/PMIS Human Factor principles, July 1, 1985 a
tions 'nd' plant nomenclature consis- conventions, and nomenclature will be tent with that used in the' Control- -compared against that used in the
. Room should be implemented in the- . Control Room and discrepancies noted.
design of the SPDS and FMIS..
- d. .The safety significance'of'the lack .The lack of lamp test capability will November 30, 1985 of lamp test capability should be be reassessed for safety importance Completion of reassessed. and the results of the-assessment- Reassessment.
will be reported in the Supplement to
~the Summary Report submitted approxi-
~
mately February, 1986.
3
NRC RECOMMENDATION / SUGGESTION NPPD PROBABLE RESOLUTION / ACTION - ESTIMATED COMPLETION DATE-4
.e. .The specifics of each:HE0' identified .As the Con' trol Room Survey-is con- ' September 30,"1985.
by the Control. Room Survey should be ducted guided by NUREG.0700, HEOs. ,
documented and justification pro-! will be additionally detailed and'
, vided for any HEOs.that are not
' assessed;per NUREG 0700. Justi ! '
corrected. fication for HEOs not corrected will be provided.
- f. It'should'be verified.that Regula- The District is under NRC order to N/A tory Guide 1.97 instruments required implement the E0P's by September,
- for performance of E0Ps will be 1985, without necessarily having; alls
- l. available" prior tc.EOP implementa .
Regulatory Guide 1.97f,instrumenta-tion andLthat relabeling of Control tions available. Most of the Regula-
- Boards and procedure" changes'are tory. Guide.l.97. instrumentation is
~ happening in a manner that ensures
~
available. The EOPs remain func-
. consistent nomenclature between the
~
tional and' beneficial without the procedures.and boards.
remaining Regulatory Guide 1.97
. instrumentation. installed. Consis .
tency will be maintained between control board changes and related procedures.
4
- III. Other Items - Recommendations-
- a. Modifications planned to resolve. The Supplement to the Summary Report February 1986 HEDs should be described and comple- will provide additional detail:of
, tion schedule commitments provided. proposed modifications needed to re-
~A supplement to the Summary Report solve HEDs. The Supplement will also will be needed to provide descrip- contain an updated schedule for tions and schedules for modification design modifications already identi-plans resulting from feasibility. fied and those that might be deve-studies. loped due to the results of feasibi-lity studies.
4 9 4
i
4
- %~ ~
[ Y 3
NRC RECOMMENDATION / SUGGESTION NPPD PROBABLE RESOLUTION / ACTION ~ ESTIMATED' COMPLETION DATE'-
- b. The details of NPPD's verification' A verification documentation process" June 30 1985;-
Jprocess for HED correctionsishould .will be developed and followed to en- . Development.of a be included.. 'sure that HEDs corrected by_ design. . verification. '
. modification are resolved, andithat' ' documentation, -
3 no,new HEDs areJcreated by.implemen . process.:
-u tation of the. design mo'difications..
cThis process >will be. described in the-Supplement to the Summary Report.
c.- An updated ~ schedule for NUREG-0737 The Supplement'to the Summary Report ' February. 1986L Supplement 1, activities should be will provide an updated. schedule for
. included. .This update shows inter- ' NUREG-0737 activities showing the relationships among these tasks. integration' effort for these activi-ties. -. ,.
IV. NRC Suggestions
.<- a. , Copies of survey checklists, task' A DCRDR working-file will be created June 30,'1985:
.ana'ysis worksheets, and other.DCRDR- and kept at Cooper Nuclear Station.
documentation should be obtained
, from General Electric and organized < i into.a working' file for.use by NPPD-team members and individuals and~
' organization. responsible for HED- [
correction modifications and other i ~ related efforts. .
b.- HED records s'ould h be upgraded so The format and content used to docu- June 30, 1985 the written documentation alone is ment the HEDs will be reviewed and adequate to provide non-DCRDR team recommendations made, members a clear understanding of
- . . 'each HED.
8 t a .
5
NRC RECOMMENDATILN/ SUGGESTION NPPD PROBABLE RESOLUTION / ACTION ESTIMATED COMPLETION DATE
- c. Any portions of 'the Control Room As previously stated..NUREG-0700 will. N/A JSurvey that are repeated' or updated be used as a guideline in conducting.
should make use of the NUREG-0700 another control room survey. Further checklists. . control room surveys or updates will use NUREG 0700 as a guideline,
- d. 'Further coordination of SPDS..PMIS, A functional plan for total integra- _ July 30, 1985 DCRDR, Reg. Guide 1.97, and EOPs.at tion of these various activities will-the working level should be con- be developed and reviewed.
sidered.
e.. The operating experience review .The operating experience review from July'30, 1985 should be extended to include expe- the Summary Reports of other'similar rience at other BWRs similar to BWR-4s will be reviewed and Cooper. evaluated.
- f. = Human factors' engineering principles Human factor engineering principles 1986 Refueling should be applied to the design of. will be incorporated into the' design Outage.- Planned
'the CNS remote shutdown capability,. of the remote shutdown panel. installation of the including the remote shutdown remote shutdown panels. capability.
. g. Design conventions and nomenclature Design conventions and nomenclature 1986 Refueling applied to remote shutdown equipment applied to remote shutdown equipment Outage - Planned should be consistent with those used will be consistent with those used installation of the in the control room. in the control room, remote shutdown capability.
O e
6