Category:CORRESPONDENCE-LETTERS
MONTHYEARML20078S4721995-02-15015 February 1995 Provides Update to Status of WNP-3 Project ML20069D0021994-05-17017 May 1994 Informs Board & Parties of Recent Developments Re WNP-3 Project ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20141D3441986-03-31031 March 1986 Concludes That Financial Info Submitted in Util Satisfies Requirements of 10CFR140.21 Re Licensee Maint of Approved Guarantee of Payment of Deferred Premiums ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML19260E0371980-01-28028 January 1980 Forwards Util 800123 News Releases.Utils Have Decided to Terminate Const Plans for Units.Reduced Load Growth Projections,Financial Constraints & Overregulation Cited as Contributing Factors ML19260E0101980-01-23023 January 1980 Forwards Util 800123 Press Release Re Termination of Plans to Build Four Addl Nuclear Units Presently in Design Stage. Const Will Continue on Two Units Near North Perry,Oh & One Near Shippingport,Pa ML20125D5911980-01-0808 January 1980 Discusses Recent Util Reorganization.Cw Frederickson Is Authorized Officer Responsible for Receipt & Transmittal of NRC Official Correspondence Re Facility.Bm Miller Authorized to Review & Approve Documents Re Licensing Application ML19253C9121979-12-0505 December 1979 Forwards 10-yr Forecast Rept to Be Used in Updating Plants Final Environ Statement.W/O Encl ML19254E1981979-10-24024 October 1979 Responds to 791010 Ltr Re Threatened & Endangered Species in Vicinity of Proposed Facility.Federal Law Requires Biological Assessment.Lists Info for Inclusion in Assessment ML19254D6791979-10-23023 October 1979 Responds to 791010 Ltr Re Followup Actions Resulting from NRC Reviews Re Tmi.Study of Scheduled Inservice Dates Continues.Licensing Manpower Reduced.Dates Cannot Now Be Amended to Include Six Items Noted in Ltr ML19289F5281979-06-0505 June 1979 Forwards PSAR Amend 22 Re Qa,In Response to NRC 790430 Ltr.Affidavit Encl ML19273B3991979-03-0707 March 1979 Applicants Request ASLB Attention to Recent & Subsequent Order of Aslab Which Bears Directly on Issue Presented in Order.Certificate of Svc Encl ML19276F5341979-03-0505 March 1979 Requests Convening of Radiological Health & Safety Phase of Const Permit Hearing.Related SER Suppl Was Issued in Jan. Certificate of Svc Encl ML19283B5751979-02-16016 February 1979 Ack Receipt of NRC 790131 Ltr.Util Feels Any Design & Initial Const Scheduled to Occur Between Now & 791101 Can Proceed W/O Precluding Possible Addition of ATWS Mitigating Equipment ML19256B1761979-01-0808 January 1979 Responds to NRC Request for Addl Info Re Tornado Missile Protection of Main Steam Lines.Info Deals W/Analysis of Automobile Impact on Main Steam Line Piping & Calculation of Restraint Barrier Stiffness ML19263A8921978-12-21021 December 1978 Discusses Schedule Changes in Const & Planning Studies.After Review,Util Concluded That Licensing Activities Re Pending Const Permit Application Should Continue Concurrently W/The Planning Studies ML20147H3541978-12-15015 December 1978 Responds to 781027 NRC Ltr by Forwarding Oec Commitment to Conform W/Nrc Cold Shutdown Design Requirements for Subj Facils. W/Encl Affidavit ML20148T4521978-12-0101 December 1978 Manager,Quality Assurance Dept Has Assumed the Duties of Previous Chief Nuc Qual Assurance Engineer & Responsibility for All non-nuc Quality Assurance.Forwards Clarification of Main Steam Valve Leak Rate Analysis ML20197C5201978-11-0707 November 1978 Forwards 780928 NRC Memo Discussing Results of Recent Underwriters Lab Fire Protec Res Test.W/Encl ANO:7811050359, 7811160004,7811060106,7811050373 ML20150C1721978-11-0606 November 1978 Proposes Steps Util Will Take to Resolve Areas of Discord Re 2nd Analysis of Probability of Unacceptable Conditions Occurring in Control Room as Result of Toxic Chem Spill Near Facil,Including Facil Design & Hazard Analysis ML20148H0621978-11-0303 November 1978 Responds to Expressing Concern Re Proposed Location of Subj Facil.Describes Lic Process ML20058A1431978-10-27027 October 1978 Forwards Util Responses to NRC Questions Re Financial Qualifications.Affidavit Requesting Withholding of Info Per 10CFR2.790 Also Encl ML20150B7411978-10-27027 October 1978 Forwards Requirements for Subj Facil Cold Shutdown.Req Comment Prior to Issuance of SER ML20197B6401978-10-18018 October 1978 Requests Viable Geographic Alternatives to Subj Facil & Any Info Re Evaluation Studies of Proposed Pwr Plant Sites ML20148H0691978-10-18018 October 1978 Believes There Must Be Viable Alternatives to Proposed Plant Location in Northern Oh ML20148A7631978-10-18018 October 1978 Advises That Const Schedules Currently Undergoing Review. Review Expected to Be Completed in Approx 30 Days. Certificate of Svc Encl ML20147E0791978-10-0909 October 1978 Forwards Addl Info for Sser Re Major Reorganization of Util. Senior Vice-President for Engineering & Const Responsible Fr All Engineering & Const Activities.Organizational Chart Encl ML20147C8781978-10-0606 October 1978 Forwards Info Which Is 780828 Suppl Testimony of L.Firestone Describing the Rev Capco Load Forecast as Submitted to Oh Pwr Siting Comm During State Cert Hearings for Subj Facil. Matl Was Previously Submitted Informally to Singh Bajwa,Nrc ML20204C7661978-08-17017 August 1978 Reports on 220th ACRS Meeting Held on 780803-05.Items Considered Incl:Review of Facils Requests for Constr Permit RESAR-414,CRAC Code Use ML19329C4541977-12-0808 December 1977 Requests Final Rept Re Davis Besse Shutdown Resulting from Release Valve Failure & NUREG 0337,DES for Erie Units 1 & 2 ML19329C6801974-11-0404 November 1974 Responds to AEC Notice Calling for Comment Re Anticompetitive Effects of CP on Behalf of City of Cleveland 1995-02-15
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20078S4721995-02-15015 February 1995 Provides Update to Status of WNP-3 Project ML20069D0021994-05-17017 May 1994 Informs Board & Parties of Recent Developments Re WNP-3 Project ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML19260E0371980-01-28028 January 1980 Forwards Util 800123 News Releases.Utils Have Decided to Terminate Const Plans for Units.Reduced Load Growth Projections,Financial Constraints & Overregulation Cited as Contributing Factors ML19260E0101980-01-23023 January 1980 Forwards Util 800123 Press Release Re Termination of Plans to Build Four Addl Nuclear Units Presently in Design Stage. Const Will Continue on Two Units Near North Perry,Oh & One Near Shippingport,Pa ML20125D5911980-01-0808 January 1980 Discusses Recent Util Reorganization.Cw Frederickson Is Authorized Officer Responsible for Receipt & Transmittal of NRC Official Correspondence Re Facility.Bm Miller Authorized to Review & Approve Documents Re Licensing Application ML19253C9121979-12-0505 December 1979 Forwards 10-yr Forecast Rept to Be Used in Updating Plants Final Environ Statement.W/O Encl ML19254E1981979-10-24024 October 1979 Responds to 791010 Ltr Re Threatened & Endangered Species in Vicinity of Proposed Facility.Federal Law Requires Biological Assessment.Lists Info for Inclusion in Assessment ML19254D6791979-10-23023 October 1979 Responds to 791010 Ltr Re Followup Actions Resulting from NRC Reviews Re Tmi.Study of Scheduled Inservice Dates Continues.Licensing Manpower Reduced.Dates Cannot Now Be Amended to Include Six Items Noted in Ltr ML19289F5281979-06-0505 June 1979 Forwards PSAR Amend 22 Re Qa,In Response to NRC 790430 Ltr.Affidavit Encl ML19273B3991979-03-0707 March 1979 Applicants Request ASLB Attention to Recent & Subsequent Order of Aslab Which Bears Directly on Issue Presented in Order.Certificate of Svc Encl ML19276F5341979-03-0505 March 1979 Requests Convening of Radiological Health & Safety Phase of Const Permit Hearing.Related SER Suppl Was Issued in Jan. Certificate of Svc Encl ML19283B5751979-02-16016 February 1979 Ack Receipt of NRC 790131 Ltr.Util Feels Any Design & Initial Const Scheduled to Occur Between Now & 791101 Can Proceed W/O Precluding Possible Addition of ATWS Mitigating Equipment ML19256B1761979-01-0808 January 1979 Responds to NRC Request for Addl Info Re Tornado Missile Protection of Main Steam Lines.Info Deals W/Analysis of Automobile Impact on Main Steam Line Piping & Calculation of Restraint Barrier Stiffness ML19263A8921978-12-21021 December 1978 Discusses Schedule Changes in Const & Planning Studies.After Review,Util Concluded That Licensing Activities Re Pending Const Permit Application Should Continue Concurrently W/The Planning Studies ML20147H3541978-12-15015 December 1978 Responds to 781027 NRC Ltr by Forwarding Oec Commitment to Conform W/Nrc Cold Shutdown Design Requirements for Subj Facils. W/Encl Affidavit ML20148T4521978-12-0101 December 1978 Manager,Quality Assurance Dept Has Assumed the Duties of Previous Chief Nuc Qual Assurance Engineer & Responsibility for All non-nuc Quality Assurance.Forwards Clarification of Main Steam Valve Leak Rate Analysis ML20150C1721978-11-0606 November 1978 Proposes Steps Util Will Take to Resolve Areas of Discord Re 2nd Analysis of Probability of Unacceptable Conditions Occurring in Control Room as Result of Toxic Chem Spill Near Facil,Including Facil Design & Hazard Analysis ML20058A1431978-10-27027 October 1978 Forwards Util Responses to NRC Questions Re Financial Qualifications.Affidavit Requesting Withholding of Info Per 10CFR2.790 Also Encl ML20148H0691978-10-18018 October 1978 Believes There Must Be Viable Alternatives to Proposed Plant Location in Northern Oh ML20197B6401978-10-18018 October 1978 Requests Viable Geographic Alternatives to Subj Facil & Any Info Re Evaluation Studies of Proposed Pwr Plant Sites ML20148A7631978-10-18018 October 1978 Advises That Const Schedules Currently Undergoing Review. Review Expected to Be Completed in Approx 30 Days. Certificate of Svc Encl ML20147E0791978-10-0909 October 1978 Forwards Addl Info for Sser Re Major Reorganization of Util. Senior Vice-President for Engineering & Const Responsible Fr All Engineering & Const Activities.Organizational Chart Encl ML20147C8781978-10-0606 October 1978 Forwards Info Which Is 780828 Suppl Testimony of L.Firestone Describing the Rev Capco Load Forecast as Submitted to Oh Pwr Siting Comm During State Cert Hearings for Subj Facil. Matl Was Previously Submitted Informally to Singh Bajwa,Nrc ML19329C4541977-12-0808 December 1977 Requests Final Rept Re Davis Besse Shutdown Resulting from Release Valve Failure & NUREG 0337,DES for Erie Units 1 & 2 ML19329C6801974-11-0404 November 1974 Responds to AEC Notice Calling for Comment Re Anticompetitive Effects of CP on Behalf of City of Cleveland 1995-02-15
[Table view] Category:UTILITY TO NRC
MONTHYEARML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML20125D5911980-01-0808 January 1980 Discusses Recent Util Reorganization.Cw Frederickson Is Authorized Officer Responsible for Receipt & Transmittal of NRC Official Correspondence Re Facility.Bm Miller Authorized to Review & Approve Documents Re Licensing Application ML19253C9121979-12-0505 December 1979 Forwards 10-yr Forecast Rept to Be Used in Updating Plants Final Environ Statement.W/O Encl ML19254D6791979-10-23023 October 1979 Responds to 791010 Ltr Re Followup Actions Resulting from NRC Reviews Re Tmi.Study of Scheduled Inservice Dates Continues.Licensing Manpower Reduced.Dates Cannot Now Be Amended to Include Six Items Noted in Ltr ML19289F5281979-06-0505 June 1979 Forwards PSAR Amend 22 Re Qa,In Response to NRC 790430 Ltr.Affidavit Encl ML19283B5751979-02-16016 February 1979 Ack Receipt of NRC 790131 Ltr.Util Feels Any Design & Initial Const Scheduled to Occur Between Now & 791101 Can Proceed W/O Precluding Possible Addition of ATWS Mitigating Equipment ML19256B1761979-01-0808 January 1979 Responds to NRC Request for Addl Info Re Tornado Missile Protection of Main Steam Lines.Info Deals W/Analysis of Automobile Impact on Main Steam Line Piping & Calculation of Restraint Barrier Stiffness ML19263A8921978-12-21021 December 1978 Discusses Schedule Changes in Const & Planning Studies.After Review,Util Concluded That Licensing Activities Re Pending Const Permit Application Should Continue Concurrently W/The Planning Studies ML20147H3541978-12-15015 December 1978 Responds to 781027 NRC Ltr by Forwarding Oec Commitment to Conform W/Nrc Cold Shutdown Design Requirements for Subj Facils. W/Encl Affidavit ML20148T4521978-12-0101 December 1978 Manager,Quality Assurance Dept Has Assumed the Duties of Previous Chief Nuc Qual Assurance Engineer & Responsibility for All non-nuc Quality Assurance.Forwards Clarification of Main Steam Valve Leak Rate Analysis ML20150C1721978-11-0606 November 1978 Proposes Steps Util Will Take to Resolve Areas of Discord Re 2nd Analysis of Probability of Unacceptable Conditions Occurring in Control Room as Result of Toxic Chem Spill Near Facil,Including Facil Design & Hazard Analysis ML20147E0791978-10-0909 October 1978 Forwards Addl Info for Sser Re Major Reorganization of Util. Senior Vice-President for Engineering & Const Responsible Fr All Engineering & Const Activities.Organizational Chart Encl ML20147C8781978-10-0606 October 1978 Forwards Info Which Is 780828 Suppl Testimony of L.Firestone Describing the Rev Capco Load Forecast as Submitted to Oh Pwr Siting Comm During State Cert Hearings for Subj Facil. Matl Was Previously Submitted Informally to Singh Bajwa,Nrc 1987-08-25
[Table view] |
Text
l 4 a .
O ROBERT J. McWHORTER OHIO EDISON COMPANY 76 south MAIN STREET. AKRON, OHIO 44308 216-384-5918 eder 8, $%
VICE PRESIDENT Mr. Harold R. Denton Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Erie Nuclear Plant, Units 1 & 2 USNRC Docket Nos. STN50-580 & STN50-581
Dear Mr. Denton:
This letter is in follow up to my telephone conversation with Mr. Roger S. Boyd on November 15, 1978 in which I advised him of a change in the plans regarding the proposed Erie Nuclear Plant (ENP), Units 1 & 2.
As indicated in the enclosed November 15, 1978 press release (a copy of which was previously filed with the Commission), CAPCO has announced schedule changes for three nuclear electric generating units.
Detailed studies on four other nuclear units, including the ENP, are continuing. It is presently contemplated that construction of these units may be delayed by an average of three years. The reasons for the schedule changes and for the continuing studies are construction delays, increased construction costs _, ever-changing regulatory requirements, high environ-mental control costs on existing units, changing conditions in the capital markets and, to c.n extent, by customer sensitivity to increasing cost re-flected in their conservation efforts.
Due to the depth and breadth of these continuing studies, it now appears as if it will be several months before the studies are completed.
After careful review of various NRC licensing options, we con-cluded that certain ENP licensing activities relating to our pending construction permit application should continue concurrently with the CAPCO planning studies. Specifically, we recommend that the Supplement to the Safety Evaluation Report be issued as soon as practical and that the ASLB be requested to proceed with the hearings on radiological health and safety issues, including the issuance of a partial initial decision on these matters, h
d6 60 7901030G1 p[## \
3
s .
Mr. Harold R. Denton December 21, 1978 It is obvious that until the results of the on-going CAPCO studies are known, issues such as need for power, economics and analysis of alternatives cannot be assessed. Thus it would not be appropriate to proceed with issuance of the Final Environmental Statement or full environ-mental hearings at this time. However, we believe that other environmental issues could be resolved. We would recommend that the Staff issue those portions of the FES which do not involve need for power, economics or alternatives analysis and that the ASLB be requested to proceed with hearings on these matters, and issue a partial initial decision.
While uncertainty still exists in our capacity program, we believe it prudent to continue ENP licensing under the courses of action described above . In this manner, important licensing decisions and milestones visible to all parties can be achieved.
Should you need or desire further information, we would be most happy to meet with your staff to discuss our plans in detail.
Very truly yours, 062 I, htt G'&N RJM/ECB:jmm Attachment