ML19329A311

From kanterella
Jump to navigation Jump to search
Discusses Schedule for Compliance W/New App I to 10CFR50. Util Plans Cannot Be Finalized Until Receipt of Info from NRC
ML19329A311
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/12/1975
From: Parker W
DUKE POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
References
NUDOCS 8001020886
Download: ML19329A311 (3)


Text

_ __-___

NRC D'"TRIBUTION FOR PART 50 DOCKET *1ATERIAL (TEMPORARY FORM)

CONTROL NO: 13158 FILE:

FROM: Duke Power Co.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER Charlotte, N.C.

William 0. Parker. Jr. -

11-12-75 11-18-75 XXX TO:

ORIG CC OTHER SENT tRC PDR XXX Mr. Bernard Rusche 1 Signed 0

SENT LOCAL PDR XXX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 1

50-269/270/287/369/370 DESCRIPTION:

ENCLOSURES:

Lotter furnishing additional info. to Appendix I,

for Oconce Nuclear Station and McGuire Nuclear Station.......

~

(1 Copy Received)

PLANT NAME:

Oconee 1,2 & 3 and McGuirre 1 & 2 FOR ACTION /INFORMATION SAB 11-21-75 BUTLER (L)

SCHWENCER (L) ZIEMANN (L) fREG AN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)

STOLZ (L) fDICKER (E)

LEAR (L)

- ,O W,_

- ~

W/ Copies W/ Copies W/ Copies W/ Copies y PARR (L) fVASSALLO (L)

KNIGHTON (E)

SPIES O~

W/ Copies W/ Copies W/ Copies W/ Copies y 7 _,..

--~m

/ URPLE (L)

YOUNGBLOOD (E)

LPn AuMiU,\\inDU KNIEL (L)

P W/ Copies W/ Copies W/ Copies W/ Gopies INTERNAL DISTRIBUTION R

/.E.G r;LE TECH REVIEW /DENTON LIC ASST A/T IND.

/N R C r>D R SCHROEDER GRIMES h DIGGS (L)

BRAITMAN OGC, ROOM P 506A MACCARY

/GAMMILL H. GCARIN (L)

SALTZMAN gaOSSICK/ STAFF KNIGHT

/KASTNER E. GOULBOURNE (L)

ME LTZ CASE PAWLICKl

/BALLARD f. KREUTZER (E)

P GIAMBUSSO SHAO SPANGLER fj. LEE (L)

PLANS BOYD STELLO M. RU333R00K(L)

MCDONALD MOORE (L)

HOUSTON

_ ENVI RO S. REED (E)

CHAPMAN

/DEYOUNG (L)

NOVAK

/ MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER

'7. SHEPPARD (L)

E. COUPE S

AOLLER (L) (Ltr)

IPPOLITO KNIGHTON M. SLATER (E)

PETERSON P. COLLINS

/TEDESCO YOUNGBLOOD H. SMITH (L)

HARTFIELD (2)

DENISE

4. COLLINS REGAN S. TEETS (L)

KLECKER

_R E G O P R LAIN AS PROJECT LDR G. WILLI AMS (E)

EISENHUT

/ FILE & REGION (2)

BENAROYA

/la N O N V. WILSON (L)

' gig 8'TON MIPC LLgER ifAR LESS R, INGRAM (L)

  1. gg likel S

{

/% lyr ri

/ M. DUNCAN (E)

EXTERNAL DISTRIBUTION

/ - LOCAL POR Charlotte, N.C. and Walhalla, S.C.

f -TIC (ABERNATHY) (1)(2)(10)./ NATIONAL LABS O E dL 1 - PD R-SAN /LA/NY t

1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKH AVEN NAT LAB 1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWMARK/BLUME/AGBABIAN

- ACRS HOLDING /SENT

, ;;.l'

/

ob1020

DUKE POWER COMPANY Powza Dun.onwo 4ec Sourn Cucacu Srazzi, CnAarorre, N. C. asa4a wl LLI AM O. PAR M ER, J R.

Vict Patmotur Ttt tpwo n t:Amta 704 Seta= Pacowction 373-4083 November 12, 1975 m

-+

Mr. Benard C. Rusche Director of. Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

~.., '.~~

-_m/M Re: Oconee Nuclear Station Docket Nos. 50-269,50-270, and 50-287 McGuire Nuclear Station

- u

  • k*

Docket Nos. 50-369, and 50-370 o,

~

Dear Mr. Rusche:

~!

~

On May 5, 1975, the Nuclear Regulatory Commission published in the Federal Register an amendment to Title 10, Chapter I, Code of Federal Regulations, Part 50 to add a new Appendix I to 10 CFR Part 50.

The effective date of this amendment was June 4, 1973.

Section V.B of the new Appendix I required that:

For each light-water-cooled nuclear power reactor constructed-pursuant to a permit for which application was filed prior to January 2, 1971, the holder of the permit or license authorizing operation of the reactor shall, within a period of twelve months from June 4, 1975, file with the Commission:

1.

Such information as is necessary to evaluate the means employed for keeping radioactivity in effluents to un-restricted areas as low as practicable, including all such information as is required by 50.34 a (b) and (c) not already contained in his application; and 2.

Plans and proposed technical specifications developed for the purpose of keeping releases of radioactive materials to unrestricted areas during normal reactor operations, including expected operational occurrences, as low as practicable.

Duke Power Company's Oconee Nuclear Station, operating pursuant to the provisions of Facility Operating Licenses DPR-38, -47 and -55, and McGuire Nuclear Station, under construction pursuant to the provisions of Construction Permits CPPR-83 and

-84, are affected by Section V.B of Appendix I.

Accordingly, initial actions had

' begun'to demonstrate compliance with the provisions of Appendix I when a June 17, 1975 letter from Mr. Daniel R. Muller, Assistant Director for Environmental Pro-the[

jects, Division of Reactor Licensing, was received.

This letter stated that 13158

~

Page 2 staff was in the process of developing specific procedures which would include consideration of the Appendix I guidelines, and expected to have specific guidance available by September, 1975. The letter further stated that the staff's request and schedule for specific information would be transmitted after development of the specific review procedures previously mentioned.

To date, no information has been received from the Commission. Consequently, our plans for demonstrating c apliance with Appendix I cannot be finalized.

It is, therefore, requested that the Commission issue as soon as practicable the specific review procedures and the requests for specific information to be applied to applicants and licensees subject to Section V.B of Appendix I.

If this issuaace is expected to be delayed, in the interim it is requested that the Commission ad-vise of the anticipated date for the release of the requested information and of the anticipated nature of the information.

Ve truly yours, u d U-

/

[WilliamO. Parker,Jr.Q 1

N I

i 1

l