Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212B553 + (20:42:10, 8 January 2025)
- ML17212B552 + (20:42:11, 8 January 2025)
- L-82-155, Forwards Marine Seismic Reflection Profiles Referred to in Util .Twenty Oversize Graphs Encl.Aperture Cards Are Available in PDR + (20:42:12, 8 January 2025)
- L-82-161, Forwards Description of Differences Between Current Proposed Inservice Testing Program & Program Previously Submitted 770916 & Supplemented 780908.Inservice Test Program Revised to Include Check Valves & Relief Requests + (20:42:14, 8 January 2025)
- L-82-159, Forwards Response to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Tmi Action Items II.K.2.10, II.K.3.15,II.K.3.19,II.K.3.22,II.K.3.24 & II.K.3.27 Not Applicable + (20:42:15, 8 January 2025)
- L-82-156, Advises That Response to IE Bulletin 80-09, Hydramotor Actuator Deficiencies, Was Submitted in 801031 Deficiency Rept + (20:42:17, 8 January 2025)
- L-82-163, Notifies That Util Intends to Work Directly W/Ie to Resolve & Close Out Bulletins,Circulars & Info Notices + (20:42:19, 8 January 2025)
- ML17212B542 + (20:42:22, 8 January 2025)
- ML17212B541 + (20:42:27, 8 January 2025)
- ML17212B540 + (20:42:28, 8 January 2025)
- IR 05000389/1981022 + (20:42:30, 8 January 2025)
- ML17212B538 + (20:42:31, 8 January 2025)
- ML17212B537 + (20:42:33, 8 January 2025)
- ML17212B535 + (20:42:34, 8 January 2025)
- ML17212B534 + (20:42:35, 8 January 2025)
- ML17212B532 + (20:42:37, 8 January 2025)
- ML17212B528 + (20:42:38, 8 January 2025)
- L-82-148, Forwards Mar,1982 Const/Startup Progress Rept + (20:42:40, 8 January 2025)
- ML17212B520 + (20:42:40, 8 January 2025)
- L-82-152, Forwards Updated Equipment List Providing Status of Equipment Availability for Insp in Field.List Updated During Wk of 820322 by Field Walkdown + (20:42:42, 8 January 2025)
- L-82-153, Forwards Minutes of 820302 Meeting Re Fire Protection + (20:42:43, 8 January 2025)
- L-82-146, Responds to Re Ability to Control Facility Through Postulated Loss of All Ac Power Event.Analytical Info Will Be Submitted by 820513.Training Program & Procedural Description Provided by 820804 + (20:42:46, 8 January 2025)
- ML17212B516 + (20:42:46, 8 January 2025)
- IR 05000335/1981035 + (20:42:49, 8 January 2025)
- ML17212B511 + (20:42:51, 8 January 2025)
- ML17212B510 + (20:42:52, 8 January 2025)
- L-82-142, Forwards Proposed Revision to FSAR Section 3.9.3.2.3 Re QA Program for Demonstrating long-term Operability of Deep Draft Pumps,In Response to NRC Request.Encl Revision Will Be Incorporated Into Next FSAR Amend Scheduled for 820531 + (20:42:53, 8 January 2025)
- ML17212B508 + (20:42:53, 8 January 2025)
- ML17212B506 + (20:42:55, 8 January 2025)
- ML17212B504 + (20:42:56, 8 January 2025)
- L-82-140, Application to Amend License DPR-67 Consisting of Changes to Tech Specs Modifying Time Limit from 10 Days to 30 Days for Submittal of Beach Dune Survey Results + (20:42:57, 8 January 2025)
- ML17212B503 + (20:42:57, 8 January 2025)
- L-82-141, Forwards Minutes of 820309 Meeting Between Nrc,Util & Ebasco Re Util Seismic Qualification Review Team & Pump & Valve Operability Programs + (20:42:59, 8 January 2025)
- L-82-143, Forwards Processed Marine Seismic Reflection Lines.Lines Developed from Data Collected During Jul 1981 Seismic Reflection Survey + (20:43:01, 8 January 2025)
- ML17212B498 + (20:43:03, 8 January 2025)
- ML17212B496 + (20:43:04, 8 January 2025)
- L-82-132, Advises That Info Requested in NRC Re RCS Vent Sys Will Be Submitted by 820507 + (20:43:05, 8 January 2025)
- ML17212B494 + (20:43:07, 8 January 2025)
- ML17212B493 + (20:43:08, 8 January 2025)
- ML17212B492 + (20:43:09, 8 January 2025)
- ML17212B491 + (20:43:11, 8 January 2025)
- ML17212B490 + (20:43:12, 8 January 2025)
- L-82-126, Responds to Generic Ltr 81-36 Re NUREG-0737 Item II.D.1,PWR Relief & Safety Valve Testing.Valve Testing Completed in Aug & Dec 1981.Plant-specific Evaluations Will Be Completed by 821001 + (20:43:14, 8 January 2025)
- ML17212B488 + (20:43:14, 8 January 2025)
- ML17212B485 + (20:43:16, 8 January 2025)
- L-82-119, Forwards Amend 9 to FSAR + (20:43:17, 8 January 2025)
- ML17212B480 + (20:43:18, 8 January 2025)
- L-82-112, Forwards Amend 4 to Environ Rept + (20:43:19, 8 January 2025)
- L-82-120, Responds to NRC 820301 Request for Addl Info Re Secondary Water Chemistry Monitoring Program.Separate Procedures Issued.Action Statements Incorporated.Implementing Procedures Available Onsite for Review + (20:43:21, 8 January 2025)
- ML17212B477 + (20:43:21, 8 January 2025)
- ML17212B475 + (20:43:23, 8 January 2025)
- ML17212B473 + (20:43:24, 8 January 2025)