gPR 2 1982 Docket No. 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems
& Technology Florida Power
& Light Company P. 0.
Box 529100 tliami, Florida 33152
Dear Dr. Uhrig:
DI TRIBUTION:
ocket File NRC PDR L
PDR NSIC ORBInI3 Rdg DEisenhut JHeltemes OELD I&E ACRS-10 PMKreutzer-3 RAClark CNelson JTBeard Gray File oi
~'<nice s
8p Aping
~~88~
6
@ea~r~4" a@~
)le RE:
Seismic gualification of Auxiliary Feedwater System Me have reviewed your September 18, 1981 response to our Generic Letter 81-14 and have determined that the additional information identified in the enclosure is necessary to continue our review.
Please provide this information by May 7, 1982.
OMB clearance is not required for this request since it is being transmitted to nine or fewer addressees.
Sincerely, OFIginal SigrNd by:
CQg)~ /TI.TrammeIl~ g Robert A. Clark, Chief Operating Reactors Branch 83 Division of Licensing
Enclosure:
As stated cc:
See next page Baoiaooeao aaoo02 PDR ADOCK 05000335
',P,.'DR OFFICE/
SURNAME0 DATE0
.QRB PM, zr
..4.l..pL'S2.......
..ORBIT, '.
CN..'n./.p.n...
/82 lark 4/+9~
~ ~
NRC FORM 318 (I0.80) NRCM 0240 OFFIC(AL RECORD COPY USG PO1 1981~5-960
4
~ ),
N
(\\
1 ~
E I
Oy Florida Power 8 Light Company CC:
~
Harold F. Reis, Esquire Lowenstein,
- Newman, Reis 8 Alexrad 1025 Connecticut
- Avenue, N.W.
Washington, D.
C.
20036 Norman A. Coll, Esquire McCarthy, Steel, Hector
& Davis 14th Floor, First National Bank Buildi,ng Miami Florida 33131 Indian River Junior College Library 3209 Virginia Avenue Fort Pierce, Florida 33450 Administrator Department of Environmental Regulation Power Plant Siting Section State of Fl.oirida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Adminis'trator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtlind Street, N.E.
Atlanta,. Georgia 30308 Mr. Charles B. Brinkman Manager' Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.
4853 Cordell Avenue, Suite A-1
- Bethesda, Maryland 20014 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector/St.
Lucie Nuclear Power Station c/o'.S.N.R.C.
P. 0. Box 400 Jensen Beach, Florida 33457 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
St. Lucie Nuclear Plant Unit 1 SEISMIC QUALIFICATION OF THE AUXILIARYFEEDWATER SYSTEM REQUEST FGR ADDITIONAL INFORhNTION Question 1:
Enclosure 1 of Generic Letter 81-14 (Gl 81-14) defines the auxiliary feedwater (AFW) system to be consioereo as:
(a)
"The AFW system boundary from suction to oischarge (incluoing the water source ano heat sink) shall inclvoe those portions of the system required to accomplish the AFW system function and connecteo branch pipin up to and.
includino tho second valve which is 'normally closed or capable of automatic closure when the safety function is required."
(b)
"The AFW system boundary shall also include any portion of-branch pipino that is structurally coupled to the AFW system boundary such that the seismic response. of the branch pipino transmits loads to the AFW system.
As a minimum, this includes the branch lines outside the AFW '.
system boundary to a point of three orthooonal restraints."
(c)
"Allmechanical and electrical equipment, piping (e.g.,
instrument air), conduits and cable trays, which are necessary or contain items which are necessary for the operation of the AFW. system, shall also be considered."
(d)
"In aodition, the structures housing these systems ana components shall be included."
Clarify the extent to which your AFW system boundary, considered in.your September 1S, 1961 response letter, coincides with the boundary defined in GL 81-14, especially parts (a) and (b) above.
V g
~
1
~
~
~
(,~ ~
I W gg h
~
- 'l
'q7 l