Informs That TMI Action Item II.K.3.3, Reporting Relief Valve & Safety Valve Failures & Challenges, Is Resolved
ML17212B516
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/06/1982
From: Clark R
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
TASK-2.K.3.03, TASK-TM NUDOCS 8204190067
Download: ML17212B516 (4)


Text

APR 6 >982 Docket No'.'; 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems 5 Technology Florida Power 5 Light Company P. 0.

Box 529100 Miami, Florida 33152

Dear Dr. Uhrig:

DISTRIBUTION acket File Local PDR ORB Rdg D.Eisenhut JHeltemes RAClark PKreutzer-S'ELD NSIC ISE (1)

ACRS (10)

CNelson c

Gray File

'TENT)'owe t

D~ Qs-ol&

~r.g p9

//

RE:

TMI ACTION PLAN ITEM II.K.3.3. REPORTING RELIEF VALVE AND SAFETY VALVE FAILURES AND CHALLENGES.

Me have reviewed your response dated June 13, 1980t(L-.80-3.84) to 'the above TMI

=-

Action Plan item.

You have committed to meeting the reporting requirements provided in our previous guidance including a report on relief valve (RV) and safety valve (SV) failures and challenges for the period April 1, 1980 through December 31, 1980 and future reporting of RV and SV failures and challenges.

No f6rther review of this item by NRR is planned.

Because you have committed to meeting the above reporting requirements, we consider this itemreesolved for your facility.

However, we will wish to formalize these reporting requirements; therefore, we will contact you in the future requesting that you incorporate the reporting requirements in your Technical Specifications.

Sincerely, Ortgipa< st:ned by

~oberon A. 6ark Robert A. Clark, Chief Operating Reactors Branch 83 Division of Licensing cc:

See next pa'ge

- l sa04>voos7 sao40s PDR ADOCK 05000335 P

PDa OR er 82

<CM 0240

~

.N,.'.QR..3........

C g on(dd, 4

/82

~

~ ~

~ ~ ~ ~ ~ ~

~

30 '

~

.C.lax'.......

4/l',/82

~ ~ ~ ~t rr ~ Cso ~ o ~ etet ~

~

OFFICIAL RECORD COPY users: ass>-ss'e

U

~

4 h,

3

+

F+

v

~

~kW'J Q

Florida Power 8 Light Company CC:

Harold F. Reis, Esquire Lowenstein, Newman, Reis 8 Alexrad 1025 Connecticut

Avenue, N.W.

Washington, D. C.

20036 Norman A. Coll, Esquire McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Florida 33131

~

t4'ndian River Junior College Library 3209 Virginia Avenue Fort Pierce, Florida 33450 I

Administrator Department of Environmental Regulation Power Plant Siting Sect'ion State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Admingtrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtla'nd Street, N.E.

Atlanta, Georgia 30308 Mr. Charles

.B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems.

Combustion Engineering, Inc.

4853 Cordell Avenue, Suite A-1

Bethesda, Maryland 20014 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector/St.

Lucie Nuclear Power Station c/o U.S.N.R.C.

P. 0.. Box 400 Jensen Beach, Florida 33457 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

0 0 ~