MAR 25 1982 Docket Ho. 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems 5 Technology Florida Power 8 Light Company P. 0. Box 529100 fhiami, Florida 33152
'~le>
)
Your letter of January 22, 1982 indicates that it may only be possible to demonstrate core cooling for three hours.
We do not have sufficient information to conclude that this represents a reasonable period in which to expect restoration of ac power. It is currently our position that St, Lucie Unit 1 demonstr ate an ability to maintain core cooling for four hours without ac power.
This is consistent with the requirements for 5~. L St;: L'ucie Unit 2 as discussed in Supplement 1 to the St. Lucie Unit 2 SER dated December 1981.
Due tp design differences between St. Lucie Units 1
and 2, particularly safety in)ection tank release setpoints, the..Uhitr21analys'iscwhich"-,.we.'have accepted cannot be applied to Unit 1 for the four hour period; In addi<<
tion,no',details were provided which allow our review of the St..Lucie Unit 1 Station blackout analysis at the higher authorized power level of 2700 r~wt.
Therefore you are requested to submit an anhlysis af station blackout for St. Lucie.Unit 1 which demonstrates the ability to maintain core cooling for four hours without ac power.
Should you elect to provide additional detail supporting the restoration of ac power to St. Lucie 1 within a period shorter than four hours, you still must submit details of your station blackout analysis at the higher power level.
You are requested to submit this information within 45 days of receipt of the letter.
ll
"~~ ay >9921~
Cfif
)I i(f
..i i'---
Ii C
Dear Dr. Uhrig:
/'e have reviewed your December 18, 1981 and January 22, 1982 responses (L<<G1<<527 5 L-82-27) to our October 10, 1980 request for analysis demon-strating the ability of St. Lucie Unit 1 to be safely controlled through a total loss of ac power.
We have determined that your responses are inadequate as discussed below.
OFFICEI SURNAME/
I'2OO070625 820325
':PDR,. ADOCK05000335 NAG ~~F iFF IClAL R ECOR D COPY usoeo: >os>~~eSO
OO l
r 1
J I
L
'h II N
W In our October 10, 1980 letter on this subject, we requested that you describe in detail the training programs and procedures that are developed.
Within fifte~n days from receipt of this letter please provide your sche-dule for submitting this information.
The information requested in this letter affects fewer than ten respon-dents; therefore OMB clearance is not required under P.L.96-511.
Sincerely, Origirjai signed by Robert A. Qark Robert A. Clark, Chief Operating Reactors Branch P3 Division of Licensing cc:
See next page DISTRIBUTION:
Docket File NRC PDR L DPR NSIC ORBg3 Rdg DEisenhut JHeltemes PMKreutzer-3 RAClark CNel son OELD I@E ACRS-10 BSheron MRubin JKennedy AThadani OFFICEI SURNAME/
DATE$
ORB83:D
~ ~ ~ ~ 0 ~ ~
~
~
~
~ ~ ~ ~ ~ ~
PM er
~ 0 ~ ~ ~I
~ ~ 0 ~ 0 ~ 0 ~ OI ~ 0 ~ ~ ~ ~
3/
/82
~ ~ ~ ~
~ 0 ~ Ott ~I~ 0 ~ ~ J ~ ~ 00
'RB83'
~ ~ ~ ~ 00 ~
~
~ ~ ~ 0 ~\\ ~ ~
C e on/pn
~
~ 0 P ~ ~ ~ ~ ~ ~ ~ ~ I~ ~ ~ ~ ~
3/P/82
~ ~ ~
~
0 ~ ~ ~ ~ I ~ ~
~ ~ ~ ~
~ ~ ~
t.'a 3/~82
~ ~ 0 ~ ~
~ 40 ~ 0 ~ ~ ~I~ ~ ~ ~ ~ 0'
~
~ ~
~
~
~ ~ ~
~ ~ ~
NRC FOAM 318 ('l040) NRCM 0240 OFFICIAL RECORD COPY USQPO: 1991~960
~0
'I h 4 Cg t%
H' 1
t
\\
g2 8 ~
4 ~
A 1
, 04 Florida Power
& Light Company r
CC:
Harold F. Reis, Esquire Lowenstein,
- Newman, Reis
& Alexrad 1025 Connecticut Avenue, N.W.
Washington, D. C.
20036 Norman A. Coll, Esquire McCarthy, Steel, Hector
& Davis 14th Floor, First National. Bank Building Miami Fl or ida 33131 Indian River Junior College Library 3209 Virginia Avenue Fort Pierce, Florida 33450
/
Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems.
Combustion Engineering, Inc.
4853 Cordell Avenue, Suite A-1
- Bethesda, Maryland 20014 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector/St.
Lucie Nuclear Power Station c/o U.S.N.R.C.
P. 0.. Box 400
.Jensen Beach, Florida 33457 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
ch O<p~
l