Summary of 820324 Meeting W/Util in Bethesda,Md Re Fire Protection Agreements
ML17212B494
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/31/1982
From: Nerses V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8204120004
Download: ML17212B494 (9)


Text

MAR 3 I 1982 Docket No.:

50-389 APPLICANT:

Florida Power and Light Company, (FP&L)

FACILITY:

St. Lucie Plant, Unit 2

SUBJECT:

SUNORY OF MEETING HELD IN BETHESDA, MD. WITH FP&L ON tORCK 24, 1982 REGARDING FIRE PROTECTION The following agreements were'chieved:

1.

FP&L will revise the fire" protection responses to clearly identify the deviations from Appendix R using the criteria supplied at this meeting.

Action date by jqay 1, 1982.

2.

FP&L will submitaa description of the steps required to go to cold shutdown from the hot shutdown panel assuming the control room must be evacuated.

Aetio'n date by May 1, 1982.

<<1 3.

FP&L will submit reasons explaining why the cold leg tmeperature indication is sufficient reactor coolant system temperature indication on the hot shutdown panel'.

Action date by May 1, 1982.

4.

FP&L will provide verification that FP&L's definition of associated circuits is in accordance with the definition and clarification given in NRC letter of Feb.

20, 1981.

Action date by May 1, 1982.

5.

FP&L will submit a list of the minimum equipment required to achieve cold shutdown.

Action date by May 1, 1982.

6.

FP&L willssubmit their detailed justifications for those fire protection items that may not be complete by core load.

Action date by April 15, 1982.

7.

FP&L will submit a detailed description of the emergency lighting that is u ed for fire protection per SRP 9.5.3.- Action date by t1ay 1, 1982.

8.

FP&L will implement a gC program for fire protection.

Date will be provided later.

9.

FP&L will submit the code dates for the NFPA codes used for design of the fire protection system.

Action date by tray 1, 1982.

8204i20004 820331 PDR ADQCK 05000389 PDR

4-4 ef Qt cf-I '

f I

P

,I I

1 e.eee i If e r ~

e

~

4 fee e ~

~ f 4

~

~ <<

I, f

<< ~ 4 Pep'

~ =

"">> II 4

R 4

' I, ~ i

~

I

~

~

~

4 C.>>

4 I 4

-4 lffl

~

. <r 4

~

I 4

4 4

I 4

e

~

il el Ph I I

P jfif

,~

4 ~ 4'f 4

~

'I

~

e

'I

~f I

'-Fp

7 MAR 3 I 1982 10.

FP&L will submit details of the fire brigade to be used for St. Lucie and the details of how they will be able to adequately respond to a fire in either unit including the worst case.

Action date by tray 1, 1982.

11.

FP&L will submit revised drawings to clearly indicate the existing fire areas.

These drawings will be used to explain the plant specific requirements for'fire bar rier s.

Action date by Hay 1, 1982.

12.

FP&L will revise comments'hat have been submitted in the FP&L letter (L-81-511, dated 12/4/81) that commented on the SER; these items are 9-3. 9-4, 9-5, 9-6, 9-7., 9 and 9-10.

The staff noted an unsatisfactory situation namely that FP&L scheduled certain fire protection items to be installed after core load.

FP&L was reminded that the Commission must act directly on these items if they are to be installed afte'r core load.

Enclosure:

List of Attendees cc:

See next page.

O~lgtnal stgned bp Victor Nerses, Project Manager Licensing Branch No.

3 Division of Licensing OFFICEI SURNAME 0ATE f>

DL: B¹3

.s jc Jb

"'""wjj'/5 DL:

F

¹3'

~ ~

~ ~

~

~

~

~ ~

~ ~ ~

glia 3iBj/82 NRC FORM 318 IIO/801 NRCM 0240 OFFIClAL RECORD COPY o USGPO; 1980-329.824

~

5 g,>'c

~

1 1

I

'1

%h

> 1 I

~'

Attendee List for Harch 24, 1982 Heeting with FP&L regarding Fire Protection Vic Nerses John Sheetz Erroll Dotson John C. Franklin Charles L. Fisher Enoch Z.

Zuchman Hike Horrell Joe Ruggiero Larry Squitieri John Ridgely Bi 1 1 Hi 1 1er Randy Eberly John Stang James Behn Vic Benaroya NRC/NRR/DL/LBg3 FP&L FP&L FP&L FP&L Ebasco Ebasco Ebasco Ebasco NRC/NRR/DS I/AEB NRC - Region II NRC/NRR/CHEB/FP NRC/NRR/CHEB/FP Gage - Babcock 8 Assoc.

NRC/NRR/CMEB

1 I C I'

ST.

LUG IE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power 8 Light Company P.

0.

Box 529100 Miami, Florida 33152 Harold F. Reis, Esq.

Lowenstein, Newman, Reis, Axelrad 8 Toll 1025 Connecticut

Avenue, N.W.

Washington, D.C.

20036 Norman A. Coll, Esq.

Steel Hector

& Davis 1400 Southeast First National Bank Building Miami, Fl ori da 33131 Mr. Martin H. Hodder 1131 N.

E. 86th Street Miami, Florida 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Corxoission 7900 South AlA Jensen Beach, Florida 33457 U. S. Nuclear Regulatory Cormission 101 Marietta Street Sui te 3100 Atlanta, Georgia 30303

Docket File 50-389 NRC PDR Local PDR NSIC TERA LBP3 Files HE Denton E.

Case D. Eisenhut R. Purple R.

Tedesco B. J.

Youngblood A. Schwencer F. Miraglia E.

Adensam J. Miller G. Lainas T. Ippolito B. russell D. Crutchfield T.

Novak S.

Yarga D. Vassallo R. Clark J. Stol z R. Vollmer Kniqht R.

Bosnak F.

Sch'auer R. Jackson G. Lear Project Manaoer

Attorney, OELD J.

Lee OiE (3)

ACRS (16)

NRC Partici ants W.

S.

V.

Z.

W.

D.

R.

W.

A.

R.

T.

M.

0.

F.

B.

L.

R.

W.

F, L.

W.

C.

Johnston Pawlicki Benaroya Rosztoczy Haass Muller

'allard Regan Toalston Mattson Speis Srinivasan Parr Rosa

Sheron, Acting G.

Hulman Houston Gammi 1 1 Congel Rubenstein Butler Berlinger 0

Lt g

@g'+g~

5 gQW@q+4 F. Schroeder K. Kniel D. Skovholt G. Knighton M. Ernst A. Thadani W. Minners S.

Hanauer H. Thompson J.

Zwolinski P. Collins D.

Ziemann V. lloore Regional Administrator MEETING

SUMMARY

.DISTRIBUTION VNerses JRidgely BMiller REber ly JStang VBenaroya bcc:

Applicant 8 Service List

I

~(~'y $.L! -.J l '>

P 4~

1 f

'W

'\\