Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17304B395 + (07:37:07, 8 January 2025)
- ML17304B394 + (07:37:08, 8 January 2025)
- 05000528/LER-1989-008-02, :on 890714,internal Audit Revealed Cooling Tower Sludge Contained Low Level Amounts of Radioactivity. Caused by Lack of Sludge Sampling Before Landfill Disposal. Approval to Dispose of Sludge Requested + (07:37:12, 8 January 2025)
- ML17304B391 + (07:37:14, 8 January 2025)
- ML17304B388 + (07:37:15, 8 January 2025)
- IR 05000528/1989021 + (07:37:29, 8 January 2025)
- ML17304B384 + (07:37:31, 8 January 2025)
- ML17304B383 + (07:37:32, 8 January 2025)
- NL-17-1505, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (07:37:33, 8 January 2025)
- ML17304B381 + (07:37:35, 8 January 2025)
- ML17304B379 + (07:37:36, 8 January 2025)
- ML17304B378 + (07:37:38, 8 January 2025)
- ML17304B372 + (07:37:39, 8 January 2025)
- ML17304B368 + (07:37:39, 8 January 2025)
- 05000529/LER-1989-001, :on 890103,total Loss of Offsite Power to Class 1E 4.16 Kv Busses 2E-PBA-S03 & 2E-PBB-S04 Occurred.Caused by Reduced Impulse Withstand Voltage Rating Due to Rain.Failed Bushings on Each Transformer Replaced + (07:37:42, 8 January 2025)
- 05000530/LER-1989-005-02, :on 890628,discovered That Sample Flow Rate for Plant Vent Low Range Radioactive Effluent Monitor Below Alarm Setpoint.Caused by Loose Set Coupling Screw. Pre-planned Alternate Sampling Program Begun + (07:37:45, 8 January 2025)
- ML17304B362 + (07:37:46, 8 January 2025)
- ML17304B361 + (07:37:47, 8 January 2025)
- 05000530/LER-1989-007, :on 890503,deficiencies Found During Installation of Relays Constituted Reportable Condition. Caused by Inadequate Methodology of Applying Epoxy Matl to Relay Coils.Relays Replaced.Part 21 Related + (07:37:49, 8 January 2025)
- TAC:73589 + (07:37:51, 8 January 2025)
- ML17304B357 + (07:37:53, 8 January 2025)
- PNO-V-89-045, on 890724,licensee Reported That nonsafety- Related Main Feedwater Pump Suction Piping Had Been Overpressurized Following Reactor Trip on 890712.Caused by Recirculation Valve Being Open.No Leakage Found + (07:37:56, 8 January 2025)
- 05000528/LER-1989-014, :on 890622,discovered That Seismic Monitor Had Been Disconnected & Inoperable Since 890422.Caused by Procedural Failure.Procedure for Removal of Reactor Coolant Pump Motor Being Revised to Alert Personnel + (07:37:59, 8 January 2025)
- ML17304B352 + (07:38:00, 8 January 2025)
- ML17304B350 + (07:38:01, 8 January 2025)
- IR 05000528/1989025 + (07:38:03, 8 January 2025)
- PNO-V-89-043, on 890714,discovered Low Level Radioactivity in Cooling Tower Sludge.Program to Determine Extent & Quantity of Contaminated Matl Initiated & Area Posted as Radioactive Matls Storage Area.Licensee Continuing Evaluation + (07:38:06, 8 January 2025)
- ML17304B343 + (07:38:06, 8 January 2025)
- ML17304B342 + (07:38:07, 8 January 2025)
- ML17304B340 + (07:38:08, 8 January 2025)
- ML17304B336 + (07:38:09, 8 January 2025)
- ML17304B332 + (07:38:09, 8 January 2025)
- ML17304B331 + (07:38:10, 8 January 2025)
- ML17304B330 + (07:38:11, 8 January 2025)
- IR 05000528/1989029 + (07:38:12, 8 January 2025)
- ML17304B327 + (07:38:13, 8 January 2025)
- ML17304B326 + (07:38:14, 8 January 2025)
- ML17304B324 + (07:38:15, 8 January 2025)
- ML17304B325 + (07:38:15, 8 January 2025)
- ML17304B322 + (07:38:17, 8 January 2025)
- ML17304B321 + (07:38:18, 8 January 2025)
- PNO-V-89-042, on 890712,reactor Trip Experienced Due to Low Dnbr.Bus 2E-NAN-S02B Remained Energized Due to Fast Bus Transfer from Unit Auxiliary Transformer to Startup Transformer + (07:38:20, 8 January 2025)
- 05000529/LER-1989-002-02, :on 890610,main Steam Safety Valve Setpoints Discovered Out of Tolerance.Caused by Setpoint Drift.Valves Readjusted.Testing Will Continue on Refueling Schedule Until Satisfactory Performance Observed + (07:38:22, 8 January 2025)
- ML17304B316 + (07:38:24, 8 January 2025)
- ML17304B314 + (07:38:25, 8 January 2025)
- ML17304B312 + (07:38:28, 8 January 2025)
- PNO-V-89-041, on 890704,main Feedwater Pipe Drain Line Failed Due to Leak.Extent of Damage Is Localized Wetting of Various Equipment.Cause Under Investigation + (07:38:30, 8 January 2025)
- ML17304B308 + (07:38:31, 8 January 2025)
- PNO-V-89-037, on 890629,reactor Restarted Following 105-day Outage.Unit Shut Down on 890315 as Result of Concerns Re 890303 Reactor Trip Event at Unit 3.Plant Operating at 3% Power + (07:38:33, 8 January 2025)
- ML17304B302 + (07:38:34, 8 January 2025)
- ML17304B301 + (07:38:35, 8 January 2025)