Ack Receipt of Informing NRC of Steps Taken to Correct Violations in Insp Repts 50-528/89-15,50-529/89-16 & 50-530/89-16.Understands Util Reassessing Actions Taken in Response to Generic Ltr, Loss of Dhr
ML17304B321
Person / Time
Site: Palo Verde  
Issue date: 07/13/1989
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
GL-88-17, NUDOCS 8907180505
Download: ML17304B321 (4)


See also: IR 05000528/1989015

Text

. ggcP~RATED

3)1PTKBUTJON

RKMONSTKk'RON

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8907180505

DOC.DATE- 89/07/13

NOTARIZED: NO

DOCKET

N

ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

=AUTH.NAME

AUTHOR AFFILIATION

ZIMMERMAN,R.P.

Region 5, Ofc of the Direc'tor

R

RECIP.NAME

'

RECIPXENT AFFILIATION

CONWAY,W.F.

Arizona Public Service

Co. (formerly Arizona Nuclear Power

SUBJECT: Ack receipt of 890626 ltr informing NRC of steps

taken to

correct violations in Insp Repts

50-528,529

& 530/89-16.

DISTRIBUTION .CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

.

SIZE.:

TITLE

General:(50 Dkt)-Insp Rept/Notice of Violation Response

.

NOTES:Standardized

plant.

Standardized

plant.

Standardized

plant.

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

COPIES

LTTR ENCL

1

1

1

1

RECIPIENT

ID CODE/NAME

CHAN,T

DAVIS,M.

COPXES

LTTR ENCL

1

1

1

1

05000528

05000529

05000530

D

INTERNAL: ACRS

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS1

RES MORISSEAU,D

2

2

1

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

O~IEB,J

EG FILE

02

R

E

01

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL: LPDR

NSIC

NOTES:

1

1

1

1

1

1

NRC PDR

1

1

NOIE K) ALL 'RZDS" KKZPZKÃIS

PLEASE KKiP US 'IO REDONE %LSTBI

CNIMT 'IHE DOCGMENI'CRC)L DESK,

LTSTS KR DCKX1MHKS YOU DCSERT NEEDf

TAL NUMBER OF COPIES

REQUIRED:

LTTR

28

ENCL

28

R

I

A

D

S

RE0

0p

~4

0~c

0O

t'

e

O~

/4, ky*y4

, UNITED STATES

NUCLEAR REGULATORY COMM1SS)ON

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

JUL 13

198g

Docket Nos. 50-528, 50-529,

50-530

Arizona Nuclear Power Project

P. 0. Box 52034

Phoenix, Arizona

85072-2034

Attention:

Mr. W. F.

Conway

Executive Vice President

Gentlemen:

Thank you for your letter of June

26,

1989, in response

to our Notice of

Violation and Inspection

Report No. 50-528/89-16,

50-529/89-16

and

50-530/89-16,

dated

May 26, 1989, informing us of the steps

you have taken to

correct the items which we brought to your attention.

Paragraph A.I.IIIof

your response

states

that

an incident investigation of the problems

encountered

with mid-loop operation at Unit 3 is in progress.

We request

that you provide's the results of your investigation

and your planned

corrective actions, following the completion of your investigation.

As

discussed

between

Mr. S. Richards of my staff and Mr. T. Shriver of your

staff,

we understand

that your investigation will be completed

by August 30,

1989.

Our Inspection

Report 50-528/89-16

and the Office of Nuclear Reactor

Regulation letter

(Chan to Karner) dated

May 5, 1989, which addressed

your

response

to Generic Letter 88-17,

"Loss of Decay Heat Removal," both have

questioned

whether you have thoroughly reviewed

and addressed

the issue of

decay heat

removal during mid-loop reactor coolant system operation.

As

stated

in Inspection

Report 50-528/89-16,

paragraph

12,

we understand

that you

are reassessing

the actions

taken in response

to Generic Letter 88-17 and will

complete this reassessment

and appropriately brief management,

engineering,

and operations

personnel,

prior to any further mid-loop operations with fuel

in the reactor vessel.

We want to again

reemphasize

the importance

the

NRC

places

in being properly prepared for the conduct of mid-loop operations.

Your actions regarding

the above issues will be reviewed during a future

inspection.

Your cooperation with us is appreciated.

Sincerely,

R. P.

Zs

erman, Acting Director

Division of Reactor Safety

and Projects

grcg07 g =;0 g0.

c

~YCI / ~

PDR

ADOCI'

L'I005

'"'DC

-2-

bcc w/copy of letter dated 6/26/89:

Oocket File

Resident

Inspector

Project Inspector

G.

Cook

B. Faulkenberry

J. Martin

LFMB

State of Arizona

bcc w/o copy

M. Smith

REGION

V

TPolich

f/)~89 ( "

of letter dated 6/26/89:

c'-

~~'s(

<'

g

~ /

yq +>>,jnms~~ti

SRichards

MBlume

>)IC

~ef4ee.

> z~

'1 /.~/89

Q/ '~/89

7 //S/89

U

C

PY

/

U 5

C

PY

E

U

S

C

Y

C

ES /

NO

YES'

NO

YES / /NO

YES /

. N

N

PDR

ES /

NO