Requests That Util Revise 890620 Application for Amend to Licenses NPF-41 & NPF-51 Re CEA Operation,To Include Adequate Supporting Bases for Each Proposed Change
ML17304B357
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/25/1989
From: Chan T
Office of Nuclear Reactor Regulation
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
TAC-73589, TAC-73590, NUDOCS 8907310337
Download: ML17304B357 (6)


Text

July 26, 19.89 Docket Nos. '50-529, 50-529 and 50-530 Mr. William F.

Conway Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Conway:

SUBJECT:

PROPOSED TECHNICAL SPECIFICATION CHANGES - PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 and 2, RE:

CONTROL ELEMENT ASSEMBLY CALCULATOR (CEAC) OPERATION (TAC NOS.

73589 AND 73590)

By letter dated June 20, 1989, Arizona Nuclear Power Project (ANPP) proposed changes to the Palo Verde Units 1 and 2 Technical Specifications regarding operation with one or two CEACs out of service.

We have reviewed the application and conclude that the discussions related to No Significant Hazards Consideration (Paragraph D) and the Safety Evaluation (Paragraph E) are not sufficiently detailed to permit staff evaluation.

Although the proposed changes are stated to be editorial in nature, and are changes which have been approved in Amendment No.

18 to Facility Operating License NPF-74, the aforementioned paragraphs are conclusory in nature and lack substantive evaluation.

It is essential that a stand-alone application provide adequate supporting bases for each of the proposed changes by discussion, rather than by broad assertion of acceptability.

Accordingly, we will hold in abeyance our review of your June 20, 1989 application.

We ask that you revise your'mendment request to include the necessary discussions, and to submit the r evised application within 30 days, or provide an alternate schedule for doing so within 15 days.

Please contact me if you have any questions regarding this matter.

Sincerely, original signed by Terence L. Chan, Senior Project Manager Project Directorate V

Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page TAC 73589/90 LOG p10 7/12 O~t DISTRIBUTION oc et 1

MVirgilio MDavis BGrs s

SP J

e 7/6 /89 IIRC a L

JLee OGC (f/info AC (10)

PD5 RSP TChan:rw 7/Z6/89 8907310337 890725 PDR ADOCK 05000528 P

PDC PDRs only) li PD ¹5 Reading TChan EJordan D:P RSP GK tn 7lg689

1 l

Ti' l

'll

>1 ll

i N ff

fpR RKcy 4

+

~

O~

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 July 26, 1989 Docket Nos.

50-529, 50-I29 and 50-530 Mr. William F.

Conway Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Conway:

SUBJECT:

PROPOSED TECHNICAL SPECIFICATION CHANGES - PALO VERDE NUCLEAR GENERATING STATION, UNITS I and 2, RE:

CONTROL ELEMENT ASSEMBLY CALCULATOR (CEAC) OPERATION (TAC NOS. 73589 AND 73590)

By letter dated June 20, 1989, Arizona Nuclear Power Project (ANPP) proposed changes to the Palo Verde Units 1 and 2 Technical Specifications regarding operation with one or two CEACs out of service.

We have reviewed the application and conclude that the discussions related to No Significant Hazards Consideration (Paragraph D) and the Safety Evaluation (Paragraph E) are not sufficiently detailed to permit staff evaluation.

Although the proposed changes are stated to be editorial in nature, and are changes which have been approved in Amendment No.

18 to Facility Operating License NPF-74, the aforementioned paragraphs are conclusory in nature and lack'ubstantive evaluation., It is essential that a stand-alone application provide adequate supporting bases for each of the proposed changes by discussion, rather than by broad assertion of acceptability.

Accordingly, we wi 11 hold in abeyance our review of your June 20, 1989 application.

We ask that you revise your amendment request to include the necessary discussions, and to submit the revised application within 30 days, or provide an alternate schedule for doing so within 15 days.

Please contact me if you have any questions regarding this matter.

Sincer cc:

See next page erence L. Chan, Senior Project Manager Project Directorate V

Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

<<:j

Mr. William F.

Conway Arizona Nuclear Power Project Palo Verde CC:

Arthur C. Gehr, Esq.

Snell 5 Wilmer 3100 Valley Cente~

Phoenix, Arizona 85073 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Mr. Tim Polich U.S. Nuclear Regulatory Commission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Charles B. Brinkman Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Charles Tedford, Director Arizona Radiation Regulatory Agency 4814 South 40 Street

Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue Phoenix, Arizona 85003

l

~-

5 1

l J

II K

It