Forwards Response to 890407 Request for Info Re Backfits & Installation Cost
ML17304B330
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/23/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Jordan E
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
161-01952-WFC, 161-1952-WFC, GL-88-01, GL-88-03, GL-88-1, GL-88-3, IEB-88-001, IEB-88-002, IEB-88-005, IEB-88-1, IEB-88-2, IEB-88-5, NUDOCS 8907210017
Download: ML17304B330 (10)


Text

gc CEEZRATZD D1STKBUTION DEMONSTRATION SYFI'ZM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907210017 DOC.DATE: 89/05/23 NOTARIZED: NO DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Pal'o Verde Nuclear Station, Unit 3, Arj:zona Rubli 05000530 AUTH. NAME AUTHOR AFFILIATION Arizona Public Service Co. (formerly Arizona Nuclear Power I')gyP'ONWAY,W.F.

RECIP.NAME RECIPIENT AFFILIATION JORDAN,E.L. Office for Analysis & Evaluation of Operational Data, Direc

SUBJECT:

Forwards response to 890407 request for info re backfits.& D installation cost.

8 DISTRIBUTION,-,CODE: A001D COPIES .RECEIVED:LTR, (-ENCL g~ SIZE:,

TITL'E.':,'10R 'Submittal: General'i.stri'bution plant. 05000528 '1'OTES:Standardized Standardized plant. '95000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 S CHAN,T 5 5 DAVIS,M 5. 5 DAVIS,M. 5 5 INTERNAL: ACRS 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 'NRR/DOEA/TSB 11 1 1

'NUDOCS-ABSTRACT 1 1 OC/~B 1 0 OGC/HDS1 1 0 REG FILE 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 1 1 D

h D

NOXK 'E) ALL RIDS" RECZPZERIS:

RXN P1-37 (EZT- 20079) I PLEASE HELP US XO REDUCE gASTE! CCRC~ 'XHE DOCUMEFZ CCÃE%L DESK EZZKQCGR 'Y0UR NAME PKH DISTRIBUTXGN LISTS PDR DOCUMENTS YOU DCRPT NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 39 ENCL 37

4I I

iI J'

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 161-01952-WFC/SKW

,May .23, 1989 Edward L. Jordan, Director Office for Analysis and Evaluation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

NRC General Letter Dated April 7, 1989

Dear Sir:

Subject:

NRC Request for Information Concerning Backfits File: 89-056-026 Attached please fi'nd ANPP's response to your .subject questionnaire along with the requested installation costs. If you have any questions, please contact A.

Carter Rogers of my staff at (602) 371-4041.

Very truly yours, W. . Conw Executive 'ce President WFC/SKW/jle Attachments cc: G. W. Knighton (all w/attachments)

J. B. Martin

<T.-L.-Ch~an M. L. Davis T. J,. Polich A. C. Gehr ygl

) f 89072i0017 890523 PDR ADOCK 05000528 P PDC

0 I

Attachment 1'.

Are NRC procedures (i.e., Manual Chapter 0514) sufficiently clear and effective on how backfits are identified and transmitted to licensees, and how claims of backfit and appeals are handled? If not,, would you please comment on the need for:specific improvement?:

ANPP Res onse No. Chapter 0514 of NRC Manual specifically allows the use of I&E Bulletins and Generic Letters to impose backfits on utilities. In contrast, Chapter 0720 of the NRC Inspection and Enforcement Manual establishes in Secti'on 03.01, "ISE Bulletins are not intended to substitute for newer revised license conditions or other continuing requirements." An associated footnote states "If a licensee or permit holder refuses to perform an action requested in an ISE ,Bul'letin, a requirement for the action may be imposed by an order, following staff, evaluation." Through.

these statements, the ISE Manual establishes. that Bulletins cannot impose requirements. These two procedures provide conflicting information and need to be revised to remove this conflict.

2. Is the NRC staff practice consistent with, the Manual Chapter 0514 process in identifying,,and implementing backfits? If not, would you please comment on any specific observed, inconsistencies?

ANPP Res onse After review of Palo Verde inspection reports, Generic Letters, ISE Bulletins, and new rules, the NRC staff practices seem to be consistent with the Manual Chapter 0514 process.

3. In the past year have you experienced, in your judgment, the imposition of one or more backfits, which would not fit one of the exceptions listed in 10 CFR 50.109(a)(4) or did not have a regulatory analysis, for which you did not file a claim or appeal? If so, please indicate why you did not file a claim or appeal.

ANPP Res onse In the review which was done, no backfit was imposed on Palo Verde which did not fit into one of the exceptions or did not have .the regulatory analysis.

4. Please describe any impediments or weaknesses in the backfit process, or in the communications and understanding at:that process, and any, suggestions for improvements.

ANPP Res onse See response to Question l.

0 Attachment 2 Bulletin 88-01'his action has not been completed at this time for Palo Verde Units 2 and 3.

Parts have been procured at a cost of $ 3,145.00 for each Unit and -the estimated installation and'etest time is 60 manhours per Unit, at a cost of. $ 1,'800.00.

The manhours for inspection was 61 manhours per Unit as given in ANPP letter 161-00934-EEVB/JNQ dated April 6, 1988. The inspection cost translates to

$ 1,830.00. The total cost is estimated to be $ 6,775,.00 per Unit.

Bulletin 88-02 The response to this Bulletin has not been transmitted to the NRC. The cost information is not yet available.

Bulletin 88-05 This action required a large effort for both maintenance and engineeri'ng staff, however the manhours accumulated on this task were separately recorded and broken down by PVNGS department.. The cost breakdown is also attached.

Generic Letter 88-01 This letter deals with Boiling Water Reactor. Palo Verde's units are Pressurized Water Reactors. The costs incurred were, minimal.

Generic Letter 88-03 No plant ,modifications, were required for Palo Verde. Engineering spent 35 manhours researching the design of the plant in regards to the issue. This translates to a cost of $ 1,050.00.

I

~I ~ ~

~'

C

Attachment 2 TOTAL'OLLARS TO DATE'62,984 I I I I I I I I IContractlContractlMaterial/I Material I De artment Unit Pa roll Labor Services Su lies Travel Load Total I I I I I I I Licensing 9333 I$ 4,628I$ 5,016 I, $ 763 I I I $ 10, 407 I I I I I I Vendor Quality 9551 13,570I 2,837 I I $ 336 I 16,743I I I I I Procurement 9554- 338I 152 I I 490I I I I I QA Monitoring 9562 1 467l I I 1,467 I I I I I QA Test Monitoring 9563 199 I I I 199 I I I I I Central Main. W.C. 85 34 274I I I 274 I I I I I I Radiation Protection( 8551 I 167 I I I 167 I I I I I I Mech/Civil 8624 I 3,067I I I 3,067I I I I I I Micrographics, 9133 I 112 I I I 112 I I I I I I Train - A/V 9136 I I 1,482 I 95 1,577I I I I I I Mech/Chem. 9141 I 10,436I I I 10,436I I I I I I I, Stores 9242 I I 10,898 I I 10,947I I I I I I Purchasing 9243 I 7,098I 49 I I 7,098I I I I I I I I TOTALS I $ 41, 356 I $ 18, 903 $ 49 I'2,245 I $ 336 $ 95 I$ 62,984I I

~ F4