gt."CP~RATm D)STRIBUTlON DEMONSTRATION.
SYFTEM 4a..
D
'I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8907210011 DOC.DATE: 89/07/07 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530'Pal'o'Verde Nuclear Station',. Unit; 3, Arizona"Publi 05000530 AUTH.NAME z..
. AUTHOR AFFILIATION:
R MARTIN,J.B.,;;; Region 5, Ofc.of. the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona~uclear Power M~~5 SUBJECT:
Forwards Meeting Repts 50-528/89-20,50-529/89-29 R
50-530/89-20 on 890605.
DISTRIBUTION,-CODE: IE01D COPIES RECEIVED: LTR t
ENCL
.! - BISE: 3f TITLE'..-General-'.(50 Dkt)-Insp Rept/Notice of Violation Response'-
-
'
NOTES:Standardized plant.
Standardized plant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT COPIES RECIPIENT ID CODE/NAME LTTR ENCL ID CODE/NAME PD5 PD
1 CHAN,T DAVIS,M
1 DAVIS,M.
COPIES LTTR ENCL
'
1
INTERNAL: ACRS AEOD/DEZIB DEDRO NM/DEST DIR NRR/DOEA DIR 11
'NRR/DREP/RPB
NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D EXTERNAL: LPDR NSIC NOTES
.2
. 1',
- 1
1
1
AEOD/TPAD
NRR SHANKMAN,,S
.
NRR/DLPQ/PEB
.
NRR/DREP/EPB
2 NRR/PMAS/ILRB12
ERMAN,J
EG
1 RGN5 FILE
1 NRC PDR
1-
"'1
1
1
1
1
1
1
1
"
1.
NVK 'IO ALL RIDS" RE'CZPIEHIS:
PLF~E HELP US M REDUCE HASTE!
CGMZACT GHE DOCUMEÃZ CGRZRDL DESK, RKH Pl-37 (EXT. 20079)
TO EIiIMZNPZE KX3R MNB HKK DIPHGH7ZICN LISTS MR DOCUMEHXS VXJ DCRPT NEEDk TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
.1
l'
I
Docket Nos.
50-528, 50-529 and 50-530 Arizona Nuclear Power Project P.
0.
Box 52034 Phoenix, Arizona 85072-2034 Attention:
Mr.
W.
F.
Conway Executive Vice President-Gentlemen:
SUBJECT:
REPORT OF MEETING WITH ANPP MANAGEMENT This refers to a meeting held with Mr. 0.
M.
De Michele, yourself, Mr.
D.
B. Karner, Mr. J.
G.
Haynes, and other members of your staff, with Dr.
T. Murley, Director of the NRC Office of Nuclear Reactor Regulation, myself, and other members of the NRC staff, at the Palo Verde Nuclear Generating Station, on June 5, 1989.
The subjects discussed 'are summarized in Meeting Report Nos.
50-528/89-29, 50-529/89-29, and 50-530/89-29, enclosed herewith.
As we have previously communicated to you, the circumstances surrounding the events at Units 1 and 3 in early March, 1989, are of significant concern to the NRC.
We were encouraged by this meeting in that the presentations made by.
yourself and your staff indicate a recognition of the seriousness of those events and the need for change in the way Palo =Verde is managed and operated.
We will closely follow your efforts to implement the actions you described in the meeting and in recent correspondence to the NRC.
Specific areas, of concern discussed during this meeting which warrant your prompt attention are summarized as follows:
The System Engineer program has been slow to develop.
The System Engineers themselves have appeared to lack an understanding of what is expected of them and apparently do not feel responsible and accountable for their system's performance.
In general, root cause evaluations have often been limited in scope and have not reviewed problems and events to the degree necessary to thoroughly correct the cause.
Specifically with regard to your root cause evaluations of the Atmospheric Dump Valve (ADV) failures and the problems encountered with the Compressed Gas System (CGS),
we concluded, and so stated to you during our meeting, that your evaluations did not determine why the various technical problems were not adequately addressed prior to the March, 1989 events, although the problems-were known to your staff.
In addition, you did not appear to have clearly resolved all of the technical issues at the time of the meeting.
As discussed*during the meeting, we understand that you will complete a more in-depth evaluation of the manner in which the ADV and CGS problems were previously handled:
We request that you provide this evaluation to the NRC within 60 days of the date of this letter.
89072iOOll 8(0707 axioc>>:
o"=neo=-"-s Q
F'DC
.'Ic
l~
I'i h
tL
.
"UL - >>ass The guallty Assurance and Oversight organizations have not been a visible force in the operation of Palo Verde.
Senior Management has not demanded that these groups be critical and probing in their reviews, such that major problem areas will be identified prior to becoming self-revealing.
ANPP Management should take the measures necessary to ensure that managers and supervisors are responsive to employee concerns, and to ensure that the guality Assurance Hotline promptly and completely addresses all concerns directed to the Hotline.
As we understand the highlights of the areas you indicated you will focus on, you intend to ensure that the root causes of problems are fully understood and developed, in part by demanding a strong involvement by your engineering personnel; you intend to require System Engineers to be responsible for their systems, and will provide the System Engineers with the support necessary for them to be effective; you intend to require your guality Organization to be increasingly more demanding and critical; you intend to ensure that management and the gA Hotline are responsive to employee concerns by continually reenforcing that concept from top levels of management; and you intend to take actions to significantly strengthen your training and maintenance programs.
We support your actions in these areas and look forward to reviewing your progress in a few months time.
In accordance with 10 CFR 2.790(a),
a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
r Should you have any questions concerning our minutes of the meeting, documented in the enclosed meeting report, we will be pleased to discuss them with you.
S i nc ere lp,
>y }r+-
~::.
'.'ohn B. Martin Regional Administrator Enclosures:
1.
Report Nos.
50-528/89-29, 50-529/89-29, 50-530/89-29 2.
ANPP Presentation Package cc w/enclosures:
J.
G.
Haynes, ANPP W.
F. guinn, ANPP B.
E. Ballard, Sr.,
ANPP T.
D. Shriver, ANPP C.
N.
Russo, ANPP D.
Canady, ANPP D.
B. Karner, ANPP A.
C.
Rogers, ANPP L. Bernabei, GAP J.
R.
Brown, ACC A..C. Gehr, Esq.,
Snell 8 Wilmer
f l
-3-bcc w/enclosures:
Project Inspector Resident Inspector docket file G.
Cook B. Faulkenberry J. Martin R.
Nease, NRR bcc w/o enclosures:
J. Zollicoffer M. Smith T. Murley, NRR J.
Partlow, NRR J.
Lieberman, OE G. Knighton, NRR REGION V c W E,PW SARichards/dot RZimmerman 7/'( /89 7/ //89 f/'ST COPY j ST COPY YES /
NO YES )/
NO gt GKnighton, NR JBM 7/
( /89
/+89
/
j g VEST COPY j REQUEST COPY j tYES /
NO YES /
N~O TO PDR
]
ES /
NO