NRC MONTHLY OPERATING REPORT AMENDED DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.
2.
3.
5.
6.
7.
8.
9.
10 Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:
A ril 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0
Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical'eactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated
'(MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e - 09 15 89 This Month 720 0 0
Yr.-to-Date 2 880 0
145 3
Cumulative 22 920.0 16 500.4 0
1 461 1
16 201 8
0 0 0 0 5 48 540 0
1 911 100 0
1 62 088 0
50 50 0 0 59 414 317.0 20 779 570.0 19 446 141.0 70 50 1
69.5a 0
6 Months (Type, Date, and Duration of Each):
58 Da s
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast Achieved
~03 86
~04 18 86
~06 86
~05 20 86
~11 86 09/919 86 8907210098 890718 PDR ADOCK 05000529 R
pDc
SHUTDOWNS AND POWER REDUCTIONS AMENDED DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S.
G. Borst No.
Date Type1 Duration Hours Method of Shutting System Component Reason2 Down Reactor3 LER No.
Code4 Code~
Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 S
720.3 N/A N/A N/A Continuation of outage fr the previous month.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain) 8-Haintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error H-Other (Explain)
Hethod:
1-Hanual 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)
Exhibit H-Same Source