ML17304B340

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Apr 1989 for Palo Verde,Unit 2
ML17304B340
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/30/1989
From: Borst S
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304B333 List:
References
NUDOCS 8907210098
Download: ML17304B340 (4)


Text

NRC MONTHLY OPERATING REPORT AMENDED DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE 05 08 89 COMPLETED BY S G Borst TELEPHONE 602 3 1-4092 OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: A ril 1989
3. Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 720 0 2 880 0 22 920.0
12. Number of Hours Reactor Was Critical'eactor 0 145 3 16 500.4
13. Reserve Shutdown Hours
14. Hours Generator On-Line 0 1 461 1 16 201 8
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated '(MWH) . 5 48 540 0 59 414 317.0
17. Gross Electrical Energy Generated (MWH) 1 911 100 0 20 779 570.0
18. Net Electrical Energy Generated (MWH) 1 62 088 0 19 446 141.0
19. Unit Service Factor 50 70
20. Unit Availability Factor 50
21. Unit Capacity Factor (Using MDC Net) 50 1 69.5a
22. Unit Capacity Factor (Using DER Net) 0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelin Outa e - 09 15 89 58 Da s

25. If Shutdown At End of Report Period, Estimated Date of Startup:

N A Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY ~06 86 ~05 20 86 COMMERCIAL OPERATION ~11 86 09/919 86 8907210098 890718 PDR ADOCK 05000529 R pDc

SHUTDOWNS AND POWER REDUCTIONS AMENDED DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S. G. Borst Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type1 Hours Reason2 Down Reactor3 LER No. Code4 Code~ Prevent Recurrence 89/02 03/15/89 S 720.3 N/A N/A N/A Continuation of outage fr the previous month.

F-Forced Reason: Hethod: Exhibit F-instructions S-Scheduled A-Equipment Failure (Explain) 1-Hanual for Preparation of the Data 8-Haintenance or Test 2-Hanual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (HUREG 0161)

E-Operator Training 4 License Examination Previous Honth F-Administrative 5-Reduction of 20K G-Operational Error or Greater in the Exhibit H-Same Source H-Other (Explain) Past 24 Hours 9-Other-(Explain)