Corrected Monthly Operating Rept for Mar 1989 for Palo Verde,Unit 2
ML17304B336
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1989
From: Borst S
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304B333 List:
References
NUDOCS 8907210095
Download: ML17304B336 (3)


Text

F OPERATING STATUS NRC MONTHLY OPERATING REPORT AMENDED DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE 04 12 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 1

~

2.

3.

4, 5.

6.

7.

8.

9.

10.

Unit Name:

Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:

March'989, Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

~14 3

Design Electrical Rating (Net MWe):

,'l 0

Maximum Dependable, Capacity (Gross MWe):

1303 Maximum Dependable Capacity (Net MWe):'1 21 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

N A 11 12 13.

14.

15.

16.

17.

18 19.

20.

21.

22.

23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e - 09 15 89 This Month 44 0 358 6

0 0 353 3

0 0 1 303 549 0

450 900 0

402 510 0 4

5 47 5

44 3

42 6

6 Months (Type, 58 Da s Yr.-to-Date 2 160 0

1 4 5

3 Cumulative 22 200 0

16 500 4 0 0 1 461 1

0 0 16 201.8 0 0 0 0 5 487 540 0

59 414 31.0 1 911 100 0

1 762 088 0

6 6

6 6

20 7

9 570.0 19 446 141.0 3 0 TBD 66 8

69 0 6

7

Date, and Duration of Each):
25. If Shutdown At End of Report Period, Estimated Date of Startup:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 89072i0095 8907i8 PDR ADOCK 05000529 R

PDC Forecast Achieved

~03 86 04/418 86

~06 86 05/520 86

~11 86

~09 19 86

SHUTDOWNS AND POWER REDUCTIONS AMENDED DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S.

G. Borst No.

Date Type" Duration Hours Method of Shutting System Component Reason2 Down Reactor LER No.

Code4 Code3 Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 S

390.7*

N/A N/A N/A Voluntary shutdown as a

res of equipment problems on Un' and Unit 3.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain)

B-Haintenance or Test C-Refueling O-Regulatory Restriction E-Operator Training

& License Examination F-Administrative G-Operational Error H-Other (Explain)

Hethod:

1-Hanua l 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)

Exhibit H-Same Source