ML17304B395
| ML17304B395 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/31/1989 |
| From: | Haynes J, Porter K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 254-00349-JGH-K, 254-349-JGH-K, NUDOCS 8908210186 | |
| Download: ML17304B395 (36) | |
Text
...,, gcgp~RATED D1 BUTfON DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:890 FACIL:STN-50-528 STN-50-529 STN-50-530 AUTH.NAME PORTER,K.F.
HAYNES,J.G.
RECIP.NAME 8210186 DOC.DATE: 89/07/3 Palo Verde Nuclear Station, Palo Verde Nuclear Station, Palo Verde Nuclear Station, AUTHOR AFFILIATION Arizona Public Service Co.
Arizona Public Service Co.
RECIPIENT AFFILIATION 1
NOTARIZED: NO DOCKET g
Unit 1, Arizona Publi 05000528 Unit 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power I
SUBJECT:
Monthly operating repts for Jul 1989 for Palo Verde Nuclear Generating Station, Units 1,2
& 3.W/890814.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR XENCL ASSIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: Standardized plant.
Standardized plant.
05000528 05000529 h 05000530 RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/DR 10 E
ILE EXTERNAL EGGG S IMPSON I F NRC PDR NOTES:
COPIES LTTR ENCL 3
3 1
1 10
=10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M.
AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 31 ENCL 31
0 0
Pi C.
l
'ki,,
l
~
'1
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 IDI'II 254-00349-JGH/KFP August 14, 1989 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Monthly.Operating Reports for July 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for July 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A
(Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3
Operating Licenses.
By copy of this
- letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region
-V Office.
If you have any questions, please contact Mr. K. F. Porter, at (60 )
602) 371-4187.
Very truly yours, J.
G. Haynes Vice President Nuclear Production JGH/KFP/dim Attachments cc:
M. J.
Davis J.
B. Martin T. J, Polich J.
A. Amenta INPO Records Center (all w/attachments) 89082ioi86 85'073i PDR ADOCK 05000528 R
~
~
Monthly Page 2
Operating Report bcc:
E.
D.
'A.
R.
J.
J.
D.
R.
F.
M.
K.
B.
R.
D.
D.
D.
W.
J.
W.
R.
K.
W.
A.
S.
J.
T.
K.
G.
C.
C.
P.
S.
P.
D.
R.
D.
W.
J.
B.
D.
E.
B.
C.
J.
E.
M.
B.
A.
C.
L.
B.
S.
E.
A.
E.
R.
E.
R.
C.
W.
F.
F.
C.
L.
J.
D.
M.
W.
R.
H.
L.
Lawson J. Wiley Wootten E. Younger Kahler F.
Conway T. Reilly W. McCaskey L. Metz Van Brunt, Jr.
Karner Gehr Adney Allen Allen Andrews Bernier Buckingham Clyde Contois Ecklund Gouge Hackbert Hardy Heinicke Ide LoCicero Marsh Page Porter Quinn Rogers Schey Scott Shriver Johnson'owers Stevens Teeter Vogt (7040)
(9012)
(4141)
(6915)
(7106)
(6123)
(6345)
(7048)
(6451)
(6079)
(6985)
(7035)
(6486)
(6795)
(8038)
(6452)
(6932)
(6144)
(6123)
(7102)
(7035)
(7040)
(7048)
(6231)
(6428)
(6148)
(6077)
(6081)
(7006)
(7102)
(4161)
(7434)
(6920)
(7035)
(6070)
(6345)
(9012)
(6102)
(6086)
(2208)
(all w/attachments)
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 371-4187 OPERATING STATUS l.
2.
3.
4.
5.
6.
7.
8.
9.
10 Unit Name:
Palo Verde Nuclear Generatin Station Unit Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0
Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
~122 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 11 12 13 14.
15.
16.
17 18 19 20 21 22 23.
24.
This Month 44 Next 6 Months (Type, Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over N A Yr.-to-Date 5 088 0
1 522 0
Cumulative 30 44 0 17 262.1 1 522 0
16 826 9
5 565 298.0 1 933 00 0 1 96550 29 9
29 9
60 931 221.0 21 163 100 0 19 93 190 0
54 7
54 7a 28 9
52 7
50 28 ls
- Date, and Duration of Each):
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
Se tember 20 1989 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast Achieved
~05 85
~05 25 85
~06 85 06I610 85
~11 85 01/128 86
j
AVERAGE DAILYUNIT POWER L DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 371-4187 MONTH: JULY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16
t
REFUELING INFORMATION DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 3 1-4187 1.
Scheduled date for next refueling shutdown.
03/01/91, 3rd refueling.
2.
. Scheduled date for restart following refueling.
06/03/91 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendments To be determined.
4.
Scheduled date for submitting proposed licensing action and supporting information.
To be determined.,
5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
188 7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
ft h
H
'l
SU Y OF OPERATING EXPERIENCE FO E MONTH DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 371-4187 JULY 1989 07/01 07/31 0000 2400 Unit begins month in Mode 6, 2nd Refueling Outage.
Unit ends month in Mode 6.
I
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K. F. Porter Method of Duration Shutting System Component No.
Date Type Hours Reason Down Reactor LER No.
Code Code Cause and Corrective Action to Prevent Recurrence 89/03 04/08/89 S
744 N/A N/A N/A 2nd refueling outage.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain) Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%
or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 371-418 OPERATING STATUS 1.
2.
3.
4, 5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e
- 01 90
- 90 This Month 744 0 549.7 Yr.-to-Date 5 088 0
2 069.0 Cumulative 25 128 0
17 094 1
4 8
1 1 949.9 16 690.6 0 0 1 65 660 567 000 515 63 64 3
64 3
0.0 7 165 994 2 480 500 0
2 2
851 0
38.3 38 3
0 0 61 092 771 21 348 9 0.0 19 961 904 0
66 4 66 4 56 8
36 a
65 la 62 6
7 9
6 Months (Type, Date, and Duration of Each):
Da s
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 04/618 86 Forecast
~03 86 06 86 05/320 86
~11 86 09/919 86
r
~
4
AVERAGE DAILYUNIT POWER L DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F
Porter TELEPHONE 602 371-418 MONTH'ULY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 563 17 1060 18 1 58 19 49 20 21 223 22 120 23 1218 1238 24 1226 1234 25 1226 10 1238 26 1138 1240 27 1139 12 112 28 123 13 29 1240 14 30 1239 15 31 1238 16
REFUELING INFORMATION DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 08 09 89 COMPLETED BY K F. Porter TELEPHONE 602 3 1-4187 1.
Scheduled date for next refueling shutdown.
01/13/90, 2nd refueling.
2.
Scheduled date for restart following refueling.
04/20/90 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendment' To be determined.
4.
Scheduled date for submitting proposed licensing action and supporting information.
09/89 5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
To be determined.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
108 7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
S Y OF OPERATING EXPERIENCE FO E MONTH t
DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 3 1-418 JULY 1989 07/01 07/03 07/04 07/04 07/04 07/06 07/06 07/07 07/12 0000 1721 0033 0324 0331 1651 1847 2109 2212 Unit began month operating in Mode 1, 28% RX Power.
Unit reached 100$
RX Power.
Unit began power reduction for outage to repair one inch line break on the Feedwater Pump "B" Bypass.
Turbine taken off-line.
Unit entered Mode 2.
Unit entered Mode l.
Generator synchronized to grid.
Unit reached 100%
RX Power.
RX/Turbine trip due to loss of electrical bus NAN-S02.
Unit stabilized in Mode 3.
07/21 07/21 07/21 07/22 07/26 07/27 07/31 0032 0404 0844 0345 1756 0713 2400 Unit entered Mode 2.
Unit entered=Mode 1.
Generator synchronized to grid.
Unit reached 100$
RX Power.
Commenced power reduction to 65%
for troubleshooting feedwater pump turbine "B" oscillations.
Unit back at 100%
RX Power.
Unit ended month in Mode 1, 100%
RX Power.
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K. F. Porter No.
Date Typel Duration Hours Reason Method of Shutting Down Reactor3 LER No.
System Code4 Component Code5 Cause and Corrective Action to Prevent Recurrence 89/03 07/04/89 F
63.4 N/A Turbine was taken off-line for repair of a condensate line.
89/04 07/12/89 F
202.5 N/Av Loss of power bus NAN-S02 resulted in loss of power to two RCPs.
89/05 07/26/89 S
0.0 N/A Power reduced to 65%
for troubleshooting of FWPT "B"
oscillations.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20$
or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
I
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 3 1-4187 OPERATING STATUS 1.
2.
3.
4, 5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:
Jul 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A This Month Yr.-to-Date Cumulative 11.
12
'3 14.
15.
16
'7.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capaci.ty Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next N A 44 0 5 088 0
1 106 1
13 704 0
930 8
1 095 0
9 273 0
4 090 086 0
1 420 500.0 34 402 824.0 12 067 00.0 1 327 990 0
21 5%
21 5
11 363 465 0
67.7a 21 4 67 9
65 3
9 1
6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
Se tember 01 1989 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast 02782 07 87 09 87 Achieved
~10 25 8
~11 28 8
01I108 88
((
AVERAGE DAILYUNIT POWER L MONTH: JULY 1989 DAY AVERAGE DAILY POWER LEVEL DAY DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 3 1-4187 AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16
, ~ ~
REFUELING INFORMATION 1
DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 3 1-418 1.
Scheduled date for next refueling shutdown.
11/17/90, 2nd refueling.
2.
Scheduled date for restart following refueling.
02/19/91 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendments To be determined.
4.
Scheduled date for submitting proposed licensing action and supporting information.
To be determined.
5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
104 1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
S Y OF OPERATING EXPERIENCE FO E MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 08 09 89 COMPLETED BY K F
Porter TELEPHONE 602 371-4187 JULY 1989 07/01 07/31 0000 2400 Unit began month in Mode 6, 1st Refueling Outage.
Unit ended month in Mode 6.
A
'1 f
K
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K. F. Porter No.
Date Typel Duration Hours Method of Shutting System Component Reason Down Reactor LER No.
Code Code5 Cause and Corrective Action to Prevent Recurrence 89/03 03/08/89 S
744 N/A N/A N/A Continuation of unit refuelin outage.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20$
or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
ll ll I
I I
1