Corrected Monthly Operating Rept for May 1989 for Palo Verde,Unit 2
ML17304B342
Person / Time
Site: Palo Verde 
Issue date: 05/31/1989
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304B333 List:
References
NUDOCS 8907210100
Download: ML17304B342 (4)


Text

NRC MONTHLY OPERATING REPORT AMENDED

, 'DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 06 06 89 K

F Porter 602 3 1-418 OPERATING STATUS l.

2.

3.

4.

5.

6.

7.

8.

Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

N A 9.

10.

This Month Cumulative Yr.-to-Date 44 0 3 624 0 1 475 3

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generat:or On-Line Unit, Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit: Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e

- 02 90 - 58 11.

12.

23 664 0 16 500 4 13 1 461.1 14.

15.

16 201. 8 0 0 0.0 0 0 16 5 48 540 0 1 911 100 0 59 414 317.0 17 20 779 570.0 18.

19 446 141 0 1 762 088 0

40 3

68.5a 19.

20.

21.

68 5S 40 3

67 3

39 8s 22.

38 3a 64.7a 67'

Date, and Duration of Each):

23.

24.

6 Months (Type, Da s If Shutdown At End of Report Period, Estimated Date of Startup:

June 12 1989 25.

Forecast Achieved

~03 86 04/618 86

~06 86

~05 20 86

~11 86 09/919 86 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 8907210l00 8907i8 PDR ADOCK 05000529 R

PDC Unit Name:

Palo Verde Nuclear Generatin Station Unit 2 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe):

1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A

J

SHUTDOWNS AND POWER REDUCTIONS AMENDED a

DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K. F. Porter No.

Date Typei Duration Hours Method of Shutting System Reason2 Down Reactor LER No.

Code4 e

-Component

=-

Code5 Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 S

744 N/A N/A N/A

, Continuation of outage ff

.the previous month.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG D161)

Exhibit H-Same Source

~

~, ~

h t

~

~

4 1j J

I i