ML17304B388
| ML17304B388 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/06/1989 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 161-02181-WFC-A, 161-2181-WFC-A, NUDOCS 8908170492 | |
| Download: ML17304B388 (7) | |
Text
'CCELERATED IHS1BUTION DEMONSTRQ>ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS )
J ACCESSION NBR: 8908170492 DOC. DATE: 89/08/06 NOTARIZED: NO DOCKET FACIL:SZN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 S'ZN-50-529 Palo Verde Nuclear Station, Unit-2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH'.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECXP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Confirms 890628 telcon re schedule for implementation of 10CFR50.62, "ATWS Rule."
DISTRIBUTION CODE:
A055D COPIES RECEIVED:LTR ENCL SIZE:
TXTLE: OR/Licensing Submittal:
Salem ATWS Events GL-83-28 NOTES: Standardized plant.
Standardized plant.
05000528 /
05000529 05000530 RECIPIENT ID CODE/NAME PD5 LA CHAN,T INTERNAL: ACRS NRR/DEST/ESB 8D NRR/DEST/PSB 8D NRR/DOEA/GCB 11 OC~M MB
~G Ol EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
0 1
0 1
0 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M.
NRR LASHER,D NRR/DEST/ICSB 7
NRR/DLPQ/PEB 10 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EXB NRC PDR COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
0 1
1 1
0 1
1 1
1 S'OTAL NUMBER OF COPIES REQUIRED:
LTTR 27.
ENCL
.21
0
~i 4 ~QIs ~+
jf A,g
Arizona Public Service Company P.o. BOX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-02181-MFC/ACR/RAB August 6, 1989 Docket Nos.
STN 50-. 528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C.
20555
Reference:
Letter from J.
G. Haynes (APS) to U. S.
NRC, 161-00074, dated March 13, 1987.
Subject:
PVNGS Schedule for Implementation of the ATWS Rule
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
PVNGS Schedule for Implementation of the ATWS Rule File:
89-A-056-026 During a
conference call on June 28,
- 1989, APS and NRC Staff discussed the schedule for implementation of 10 CFR 50.62 (ATWS Rule) by APS'.
The Staff.was interested in our ability to improve upon the schedule provided in the reference letter, which was the third refueling outage for each unit.
APS told the NRC that the Design Change Package (DCP) draft revision for the Diverse Scram System (DSS) was scheduled for issuance on August 15, 1989 and the DCP would be issued on November 10, 1989.
Based on these
- dates, the current schedule for implementation is as follows:
Unit 1 Prior to restart from the third refueling outage; Unit 2 -
Prior to restart from the second refueling outage.
This date depends on completing the design work on time and having material available.
APS will update the Staff by.the end o'f October 1989.
Unit 3 Prior to restart from the second refueling outage.
S90S170492 S90S06 PDR ADOCK 0500052S P
Document Control Desk U.
S. Nuclear Regulatory Commission Page 2
161-02181-WFC/ACR/RAB August 6, 1989 The Diverse Emergency Feedwater Actuation System (DEFAS) was discussed.
Since the design of the DEFAS is still being discussed by the Combustion Engineering Owners Group (GEOG) and the Staff, we could not provide a firm date, but that it was certain it could not be implemented during the Unit 2
second refueling outage.
The NRC acknowledged that a meeting between the GEOG and the Staff would be held on July 12, 1989.
They stated the question such that if agreement were reached on July 12, what would be the implementation schedule.
APS stated that for Units 1 and 2, it may be possible to complete the modifications prior to the restart from the third refueling outage, and the Unit' modifications may be completed prior to the second refueling outage.
The design which is under discussion is conceptual and will have to be adapted to PVNGS.
Since the design is not firm for
- PVNGS, the schedule appears tentative,
- however, we believe it is possible to meet it.
The current schedule for,the refueling outages is as follows:
Unit 2 Second Refueling First Quarter 1990 Unit 3 Second Refueling - Second Quarter 1991 Unit 1 Third Refueling Second Quarter 1991 Unit 2 Third Refueling Third Quarter 1991 This letter confirms the telephone call held on June 28, 1989 and responds to Mr. Terence Chan's request to update the referenced letter.
If you have any further questions, please call Mr. A. C. Rogers at (602) 371-4041.
Sincerely, WFC/ACR/RAB/)le cc:
J.
B. Martin T. L. Chan M. J. Davis T. J. Polich A. C. Gehr
0 4
Document Control Desk U. S. Vuclear Regulatory Commission Page 3
161-02181-MFC/ACR/RAB August 6, 1989 bcc: J.
G.
W.
Fe A. C.
E. C.
G.
W.
D. C.
J.
P. J.
C. D.
M. L.
Haynes I ~
(6125)
Quinn ls 'DJ l I~
(7040)
Rogers 7
(7048)
Sterling C'(i]l/<(7034)
Soakers (6081)
,Phillips (6963)
Dennis (6424)
Wiley (6920)
Churchman (6915)
Hypse I iN't (7042)
CL e
'eve4
'e