Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000315/1989026 + (19:56:02, 7 January 2025)
- ML17328A196 + (19:56:03, 7 January 2025)
- ML17328A195 + (19:56:04, 7 January 2025)
- IR 05000315/1989001 + (19:56:06, 7 January 2025)
- ML17328A192 + (19:56:07, 7 January 2025)
- ML17328A191 + (19:56:08, 7 January 2025)
- ML17328A190 + (19:56:09, 7 January 2025)
- 05000315/LER-1989-012-01, :on 890913,solid State Protection Sys Surveillance Testing Performed on Train B While Train a Safety Injection Pump Inoperable.Caused by Personnel Error. Breaker Surveillance Test Procedures Revised + (19:56:12, 7 January 2025)
- 05000315/LER-1989-011-01, :on 890901,discovered Snubber Installed on Pressurizer Spray Line Not Tested Since Aug 1987.Caused by Failure to Include Snubber on Testing Job Order.Procedure Changed to Add Two Separate Steps + (19:56:16, 7 January 2025)
- ML17328A187 + (19:56:17, 7 January 2025)
- ML17328A186 + (19:56:18, 7 January 2025)
- ML17328A185 + (19:56:19, 7 January 2025)
- ML17328A183 + (19:56:20, 7 January 2025)
- ML17328A181 + (19:56:20, 7 January 2025)
- ML17328A178 + (19:56:21, 7 January 2025)
- ML17328A180 + (19:56:21, 7 January 2025)
- ML17328A177 + (19:56:22, 7 January 2025)
- ML17328A176 + (19:56:24, 7 January 2025)
- ML17328A175 + (19:56:25, 7 January 2025)
- ML17328A174 + (19:56:25, 7 January 2025)
- ML17328A169 + (19:56:26, 7 January 2025)
- IR 05000315/1989025 + (19:56:33, 7 January 2025)
- ML17328A166 + (19:56:35, 7 January 2025)
- 05000316/LER-1989-015, :on 890821,inoperable Open Fire Damper Subj to Constraints of Tech Spec 3.7.10 Found Which Action Statement Requirements Not Implemented.Caused by Misconception by Person Developing Task Sheet for Maint Insps + (19:56:38, 7 January 2025)
- ML17328A164 + (19:56:40, 7 January 2025)
- ML17328A163 + (19:56:43, 7 January 2025)
- IR 05000315/1989023 + (19:56:54, 7 January 2025)
- ML17328A161 + (19:56:56, 7 January 2025)
- ML17328A159 + (19:56:57, 7 January 2025)
- ML17328A156 + (19:56:58, 7 January 2025)
- 05000316/LER-1989-014, :on 890814,reactor Protection Sys Actuation Occurred Due to Failure of Class 1E Power Supply Inverter. Caused by Failed Silicon Controlled Rectifier in Static Transfer Switch.Inverter Repaired + (19:57:01, 7 January 2025)
- 05000315/LER-1989-009, :on 890705,disovered That Testing Document for Valve 1-CS-443-2 Not Signed Off.Record Search Conducted & No Evidence Found to Indicate That post-maint Testing Performed.Caused by Personnel Error + (19:57:05, 7 January 2025)
- ML17328A151 + (19:57:06, 7 January 2025)
- ML17328A153 + (19:57:06, 7 January 2025)
- ML17328A150 + (19:57:07, 7 January 2025)
- ML17328A149 + (19:57:07, 7 January 2025)
- ML17328A143 + (19:57:10, 7 January 2025)
- ML17328A146 + (19:57:10, 7 January 2025)
- ML17328A139 + (19:57:11, 7 January 2025)
- ML17328A137 + (19:57:12, 7 January 2025)
- ML17328A136 + (19:57:13, 7 January 2025)
- ML17328A135 + (19:57:14, 7 January 2025)
- IR 05000315/1989022 + (19:57:16, 7 January 2025)
- ML17328A132 + (19:57:18, 7 January 2025)
- ML17328A130 + (19:57:19, 7 January 2025)
- ML17328A129 + (19:57:20, 7 January 2025)
- ML17328A127 + (19:57:21, 7 January 2025)
- 05000315/LER-1989-004, :on 890324,leakage Found on Containment Penetrations Exceeded Tech Spec 3.6.1.2.b Requirement.Caused by Excessive Leakage Rate of Valves WCR-924,ECR-26 & ECR-31. Faulty Valves Repaired & Restested + (19:57:23, 7 January 2025)
- ML17328A125 + (19:57:24, 7 January 2025)
- ML17328A124 + (19:57:26, 7 January 2025)
- ML17328A122 + (19:57:27, 7 January 2025)