TABLE 4.3-1 Continued NOTATION

- With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.

(3) - Compare incore to excore axial imbalance above 15't of RATED THERMAL POWER. Recalibrate if absolute difference greater than or equal to 3 percent.

(4) - Manual ESF functional input check every 18 months.

(5) - Each train tested every other month.

(6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) - Below P-6 (BLOCK OF SOURCE RANGE REACTOR TRIP) setpoint.

(8) - The provisions of Specification 4.0.4 are not applicable.

(9) - The provisions of Specification 4.0.4 are not applicable for f (delta I) and f2 (delta I) penalties, or for measurement of de ta T.

(See also Table 2.2-1) ~

(10) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function, The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).

(11) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.

~

(12) - Local manual shunt trip prior to placing breaker in service.

(13) - Automatic Undervoltage Trip.

(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after leaving MODE 1.

COOK NUCLEAR PLANT - UNIT 1 3/4 3-14 AMENDMENT NO.'910040212 890922 PDR ADOCK 05000315 P PNU

TABLE 4.3-1 Continued NOTATION

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.

(3) - Compare incore to excore axial offset above 15t of RATED THERMAL POWER. Recalibrate if absolute difference greater than or equal to 3 percent.

(4) - Manual ESF functional input check every 18 months.

(5) - Each train tested every other month, (6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) - Below P-6 (BLOCK OF SOURCE RANGE REACTOR TRIP) setpoint.

(8) - The provisions of Specification 4.0.4 are not applicable.

(9) - The provisions of Specification 4.0.4 are not applicable for f (delta I) and f2 (delta I) penalties, or for measurement of de ta T.

(See also Table 2.2-1).

(10) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function. The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).

(ll) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.

(12) - Local manual shunt trip prior to placing breaker in service.

(13) - Automatic Undervoltage Trip.

(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after leaving MODE 1.

COOK NUCLEAR PLANT - UNIT 2 3/4 3-13 AMENDMENT NO.

ATTACHMENT 3 TO AEP:NRC:1102 DONALD C. COOK NUCLEAR PLANT UNIT 2 LICENSEE EVENT REPORT NO. 89-10