ML17328A130
| ML17328A130 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/05/1989 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17328A131 | List: |
| References | |
| NUDOCS 8909120259 | |
| Download: ML17328A130 (4) | |
See also: IR 05000315/1989022
Text
gC CEREBRATED
DIS'TR1BUTJON
DEMONSTRATION
SYSTEM
r
II
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8909120259
DOC.DATE: 89/09/05
NOTARIZED: NO
DOCKET
FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana
& . 05000315
50-316 Donald
C.
Cook Nuclear Power Plant, Unit 2, Indiana
&
05000316
AUTH.NAME
AUTHOR AFFILIATION
MILLER,H.J.
Region 3, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
ALEXICH,M.P.
Indi'ana Michigan Power Co.
(formerly Indiana
& Michigan Ele
SUBJECT:
Forwards Safety Insp Repts
50-315/89-22
& 50-316/89-22
on
I
890710-0815
D
DISTRIBUTION CODE:
IEOlD
COPIES
RECEIVED:LTR g ENCL +
SIZE: ~ 4 /
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
S
NOTES:
RECIPIENT
ID CODE/NAME
PD3-1
INTERNAL: AEOD
AEOD/TPAD
LOIS,ERASMIA
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS 1
MORISSEAU i D
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
'
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
GIITTER,J.
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE LIEBERMAN,J
FI
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
S
NOIR K) ALL 'KIDS" REX.IPIEPIS:
HZASE HELP US IO REDUCE lULSTE!
~NYCT~ DOCUMEÃZ CXNTROL DESK
RXN Pl-37
(EXT. 20079)
T0 ELQKNEED YOUR MNE HKH DISTRIHOTICN
LISTS FOR DOCXMERIS VXJ DCÃiT NEEDf
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL .,24,
..
D
S
Docket No. 50-315
Docket No. 50-316
Company
ATTN:
Hr. Hilton P. Alexich
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by Messrs.
J.
M. Jacobson
and J.
A. Gavula of this office from July
10 through August
15,
1989, of activities
at the D. C.
Cook Nuclear
Power Station, Units
1 and 2, authorized
by NRC Operating
Licenses
No.
DPR-58 and
No. DPR-74
and to the discussion
of our findings with
Hr. D. Williams and others at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
The focus of this inspection
was the review of
inservice inspectior, activities for both Units
1 and
2 and the review of
specific actions
taken in response
to
NRC Violations regarding
design control.
During this inspection, certain of your activities appeared
to be in violation
of NRC requirements,
as specified in the enclosed
Notice.
A written response
is requ'ired.
With respect to previous Violations 315/88028-06;
316/88032-06,
please
submit to this office within thirty days of the date of this letter
a
written statement
providing a plan of action to ensure that adequate
weld size
was installed during previous modification work.
The design control violation cited in this report stems
from the review of
structural modifications performed since the issuance
of the design control
violation in NRC Inspection Reports
No. 50-315/88028
and
No. 50-316/88028.
Although we recognize that you have
a comprehensive
long term corrective action
program that is in the infancy of implementation, it appears
that your interim
actions that included in-depth discussions
with designers/engineers
on
expectations
of high quality work have not been totally successful.
Your
written response
to this violation should address
the root cause of this
continuing problem, the reasons for the ineffectiveness
of your previous
interim corrective action,
and describe further action you are taking to ensure
a quality engineering/design, product for future modifications across all
disciplines.
Svov 12vzSP
~v~~o'DR
ADOCK 05000315
Q
Company
5 >SSe
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of
this letter, the enclosures
and your response
to this letter will be placed
in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Enclosures:
1.
Notice of Yiolation
2.
Inspection'Reports
No. 50-315/89022(DRS);
No. 50-316/89022(DRS)
cc w/enclosures:
W.
G. Smith, Jr., Plant Manager
DCD/DCB (RIDS)
Licensing Fee
Management
Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
QgGINAL SlGNED
BY. HUBERT J. Mt'LER
Hubert J. Miller, Director
Division of Reactor Safety
RIII
RIII
RIII
draco son/jaw/jk
~avul
mr'gess
08/31/89
08/~>/89
08/qX/89
RIII
RIII
RIII
RIII
Dance
son Cooper
Martin
lier
08/So/89
08/3//89
08/g q /89
g/g
/89