ML17328A192

From kanterella
Jump to navigation Jump to search
Forwards App,Errata Sheet & Corrected Pages to SALP 8 Board Repts 50-315/89-01 & 50-316/89-01,per 890926 Meeting
ML17328A192
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/05/1989
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17328A193 List:
References
NUDOCS 8910170017
Download: ML17328A192 (3)


See also: IR 05000315/1989001

Text

g5

ia

h

,p;-

~ ~ou

C

nO

I

~p

0

+4**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

700 ROOSKVCLT ROAD

OLCN ELLYN, ILLINOIS COI S1

OCT

0 5 lS89

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power Company

ATTN:

Hr. Hilton P. Alexich

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus,

OH

43216

Gentlemen:

This refers to the NRC's Systematic

Assessment

of Licensee

Performance

{SALP 8)

Report for the Donald C. Cook Nuclear Plant,

and our meeting of September

26,

1989,

which discussed

in detail the contents of the report and your written comments

dated September

29,

1989 relative to the report.

Based

on our in-depth discussions

during the meeting

on September

26, 1989,

and our thorough review and evaluation of your letter of response

dated

September

29, 1989,

we have reached

the conclusion presented

in the Appendix to

this letter.

Issuance of the Appendix serves

as the final step in our SALP

assessment

process.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2,

Title 10, Code of Federal

Regulations,

a copy of this letter with the

referenced

enclosures, will be placed in the NRC's Public Document

Room.

No reply to this letter is required;

however,

should you have questions

regarding

the

SALP Report or Appendix, please let us

know and

we will be

pleased

to discuss

them with you.

S incere ly,

a~R=

A. Bert

Davis'egionalAdministrator

Enclosures:

1.

Appendix to SALP 8 Board

Report No. 50-315/89001;

316/89001

2.

Errata sheets

3.

Corrected

Pages to SALP Report

4.

Licensee

Response Ltr,

dtd 09/29/89

See Attached Distribution

8910170017

891005

PDR

ADQCK 05000315

6

PNU

l

I

-Indiana Michigan Power

Company

Qgy 05

1989

Distribution

cc w/enclosures:

M. G. Smith, Jr., Plant Manager

>censsng

ee

anagement

Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Pub lic Health

J.

M. Taylor,

DEDR

T. E. Murley, Director,

NRR

K. M. Carr,

Chairman

T. M. Roberts,

Commissioner

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

J.

G. Giitter,

NRR Project Manager

J. 0. Thoma,

NRR Director, Project Directorate III-I

~

~

~

J.. Lieberman, Director, Office of

Enforcement

E. M. McKenna,

SALP Coordinator,

NRR

J. F. Mechselberger,

NRR

RIII

PRR'tate Liaison Officer, State

of Michigan

INPO

L. A. Reyes,

RII

M. J. Pearson,

DRS