ML17328A137

From kanterella
Jump to navigation Jump to search
Amend 128 to License DPR-58,modifying Tech Spec 3/4.7.8, Snubbers to Delay Functional Testing of Snubber Installed on Pressurizer Spray Line Until Next Time Unit Brought to Mode 5 or Ice Basket Weighing,Whichever Occurs First
ML17328A137
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/1989
From: Thoma J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17328A138 List:
References
NUDOCS 8909140216
Download: ML17328A137 (4)


Text

gp,R REqy 0

4)

OO

.II

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 128 License No.

DPR-58 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Indiana Michigan Power Company (the licensee) dated September 1, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

D.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

S909140216 890906 PDR ADOCK 050003l5 P

PDC

"2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-58 is hereby amended to read as follows:

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

128

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

Sepiember 6, 3.989 Jo n Thoma, Acting Director Project Directorate III-1 Division of Reactor Projects - III, IV, Y 8 Special Projects Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT NO. 128 FACILITY OPERATING LICENSE NO.

DPR-58 DOCKET NO. 50-315 Revise Appendix A Technical Specifications by removing the page identified below and inserting the attached page.

The revised page is identified by amendment number and contains marginal lines"indicating the area of change.

REMOVE 3/4 7-31 INSERT 3/4 7"31

j r'

~

~

ABLE D. C.

COOK FLAIII-Ut<< i 1

SAFET RELATED NYORAULIC SNUBBERS Cl OO 7CI StsUBQER HAtlGER

~lO

~RK~O

  • 1 1-GRr S519 1-GRC"S5$7 1"GRG-S5 1&RG S555 S'YSTG4 StlUSBER INSTALLED 0

LOCA lOll At6 ELEVAT Ot RKACTCR CooL.AHT

~

ELKV>>68$'-.

5 1/2" IH PRKSIURlzcR KHcLQIURK RKAcTCR C00LANT Az 25 ELcv>> 610 5

BETMcfH ITCH>>

GEE No>>

1 hHo RC PUHP No, 1

RKAOTCR coo!.AHT Az 41 ELcv 614'-10" BKLQM OTN.

GKH>> No>>

1 RcAc'TCR cooLAHT Az 141 ELKV>> 614'-2" BKLoM OTII~

GKH>> No>> 2 ACCESS IBLE OR IIIGII RAD IATIOtl l.OtlE ESPEC IALLY 0 IFF ICULT'O REtSVE No No 1-GRG-S562 RKAcTCR CooLAHT Az 154 ELcv 610'-5" OKTMKKH ITII~

GKH>> No>> 2 AHo RC PUIIP No>> 2 No 1-GRC-S564 RKAcToR CooLAHT Az $1/

ELEv 614'-10 1/8" 4KLCM OTII~

GEH. No. 4 1-GRG-S566 RchcToh C40LAHY Az 332 ELCV>> 610I-5 RCTIICCH RTII~

GKH>> No 4

AHO RC PUIIP NO>>

O 1-GRG-S573

  • Functional testing of September 4, 1989, or occurs first.

REACTOR Coc~AHT Az 223 ELcv>> 614 <<10 1/8 OKLOM OTtl~

GKH~ No>>

this snubber may be delayed until the first time the unit enters Mode 5 after in conjunction with the scheduled ice condenser ice basket surveillance, whichever