ML17328A127
| ML17328A127 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/01/1989 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17328A128 | List: |
| References | |
| NUDOCS 8909120179 | |
| Download: ML17328A127 (3) | |
Text
I ACCEMRATED D1~i~BUT1ON DEMONSTRATION SYSTEM
< ~
t~S
~'
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8909120179 DOC.DATE: 89/09/01 NOTARIZED:
NO DOCKET 5'ACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 05000316 AUTH.NAME AUTHOR AFFILIATION MILLERIH.J.
Region 3, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION ALEXICH,M;P.
(formerly Indiana
& Michigan Ele
SUBJECT:
Forwards Exam Repts 50-315/OL-89-01
& 50-316/OL-89-01 administered on 890710-19.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR
(
ENCL Q SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD
~ INTERNAL: AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN3 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
~ 1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME GIITTER,J.
NRR SHANKMAN,S NRR 10 G FILE NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NCTE 'Io ALL 'KIDS" RECZPGMS:
PIZASE HEEiP US IO REX'CLPZEf CONTACT 'IHE DOCXM:Nt.'ONZROL DESK, RXN P1-37 (EXT. 20079) K) ELIMINATES ACR NAME PKN DIPQGBUTICW TOTAL NUMBER BPR IP 8%F ENCL 12
Docket No. 50-315 Docket No.
50-316 Indiana Michigan Power Company ATTN:
Mr. Milton P. Alexich Vice President Nuclear Operations Division 1 Riverside Plaza Col umbus, OH 43216 Gentlemen:
SUBJECT:
EXAMINATION REPORT On July 10-19,
- 1989, the NRC administered examinations to employees of your organization who had applied for licenses to operate your D.C.
Cook Nuclear Power Plant.
At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff.
identified in the enclosed report.
The simulator portion of the examinations conducted r'esulted in a 35% failure rate.
The region conducted a followup inspection during the we'ek of August 14, 1989, to determine the root cause of these failures.
The inspection findings concluded that:
Instructors served as evaluators thereby limiting objectivity.
Facility audits did not test the students to the degree of an NRC exam thereby limiting the scope of their evaluation.
Individual weaknesses were not compared to determine possible programmatic weaknesses thereby overlooking a generic weakness in procedure usage.
Details of the inspection are documented in paragraph 3 of this report.
"(r.
4P You are requested to respond in writing within 30 days from the date of this letter to present your own analysis of this matter and any implications it may
" have on the qualifications of your incumbent operating staff.
We also request that you discuss your strategy to prevent a recurrence of such a high failure rate.
Please contact Geoffrey Wright at 312/790-5695 or Thomas Burdick at 312/790-5566 if you have any questions.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Indiana Michigan Power Company Should you have any questions concerning this examination, please contact us.
Sincerely,
Enclosures:
1.
Examination Reports No. 50-315/OL-89-01; No. 50-316/OL-89-01; 2.
Facility Comments and NRC Resolution of Comments 3.
Examination(s) and Answer Key(s)
(SRO/RO) 4.
Simulation Facility Fidelity Report Hubert. J. Miller, Director Division of Reactor Safety cc w/enclosures:
M.
G; Smith, Jr., Plant Manager DCD/DCB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Michigan Department of Public Health R.
K. Gillespie, Plant Training Manager A. Bournia, Project Manager, NRR R. Moffitt, Contract Exam Supervisor, PNL M.
R. Johnson, EDO Shembarger/cg RIII RIQ
~/p~
Sgpard Burdi ck by >./5j 4p RIII y Bier ess RIII right Mill r 5/~'