Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A269 + (16:46:01, 7 January 2025)
- ML17345A265 + (16:46:03, 7 January 2025)
- IR 05000250/1988012 + (16:46:05, 7 January 2025)
- ML17345A261 + (16:46:10, 7 January 2025)
- ML17345A260 + (16:46:12, 7 January 2025)
- IR 05000250/1988001 + (16:46:14, 7 January 2025)
- 05000251/LER-1987-015, :on 870715 & 16,failure to Deactivate Inoperable Containment Isolation Valve within 4 H as Required by Tech Specs Discovered.Caused by Personnel Error. Procedures Revised + (16:46:17, 7 January 2025)
- ML17345A255 + (16:46:19, 7 January 2025)
- ML17345A253 + (16:46:21, 7 January 2025)
- L-88-263, Forwards Written Summary of Info Presented to NRC During 880610 Monthly Mgt Meeting Re Performance Enhancement Program Quarterly Update + (16:46:22, 7 January 2025)
- L-88-260, Monthly Operating Repts for May 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (16:46:25, 7 January 2025)
- TAC:67285 + (16:46:27, 7 January 2025)
- ML17345A243 + (16:46:29, 7 January 2025)
- ML17345A241 + (16:46:31, 7 January 2025)
- 05000250/LER-1988-008, :on 880613,flowpath Which Could Result in Insufficient NPSH to Certain Pumps During LOCA Recirculation Identified.Procedures Revised to Maintain Valve 887 Locked in Fully Open Position + (16:46:33, 7 January 2025)
- ML17345A238 + (16:46:36, 7 January 2025)
- L-88-144, Forwards 6-month Rept of Integrated Schedule for Plant. Schedule Reflects Info as of 880520 Issuance Date.Changes to Schedules Reviewed W/Nrc Per Integrated Schedule Plan + (16:46:38, 7 January 2025)
- L-88-251, Special Rept:Fire Protection Sys (FPS) Impairments Incurred During Performance of Plant Mod & FPS Features Fail Due to Component Failure.Caused by Number of Performed Mods & FPS Equipment Malfunction.Compensatory Measures Implemented + (16:46:40, 7 January 2025)
- L-88-221, Provides Util Work Plan & Schedule for Proposed Enhancement of Existing Onsite Power Distribution Sys.Util Will Give Presentation on Emergency Power Sys Enhancement in Near Future + (16:46:43, 7 January 2025)
- 05000250/LER-1988-007, :on 880427,3A Intake Cooling Water (Icw) Pump out-of-svc Due to Discharge Pressure Gauge Piping Failure. Caused by Corrosion of Coupling Attaching Pressure Gauge Piping to Icw Discharge Pipe.Piping Repaired + (16:46:47, 7 January 2025)
- L-88-200, Forwards Summary Rept of Integrated Schedule Generated for Apr 1988,per Integrated Schedule Plan + (16:46:48, 7 January 2025)
- L-88-242, Requests That Remaining Portions of Project 1,Task 5.1, Remove Temporary Facilities, Be Terminated,Per Section IV of NRC 860812 Confirmatory Order.Only 16 of 56 Trailers Occupied & Not Accounted for in Original Scope of Project + (16:46:55, 7 January 2025)
- ML17345A229 + (16:46:58, 7 January 2025)
- ML17345A227 + (16:47:00, 7 January 2025)
- L-88-239, Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Program Implemented to Monitor,Identify,Evaluate & Correct Small Primary Coolant Leaks + (16:47:01, 7 January 2025)
- ML17345A223 + (16:47:04, 7 January 2025)
- ML17345A222 + (16:47:06, 7 January 2025)
- IR 05000250/1988008 + (16:47:15, 7 January 2025)
- ML17345A219 + (16:47:16, 7 January 2025)
- ML17345A216 + (16:47:18, 7 January 2025)
- ML17345A214 + (16:47:19, 7 January 2025)
- L-88-240, Forwards mgt-on-shift Weekly Repts,Per NRC 871019 Order + (16:47:20, 7 January 2025)
- ML17345A212 + (16:47:23, 7 January 2025)
- ML17345A210 + (16:47:24, 7 January 2025)
- IR 05000250/1988010 + (16:47:25, 7 January 2025)
- ML17345A205 + (16:47:27, 7 January 2025)
- L-88-232, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880509 + (16:47:28, 7 January 2025)
- ML17345A202 + (16:47:30, 7 January 2025)
- ML17345A201 + (16:47:32, 7 January 2025)
- TAC:59153 + (16:47:32, 7 January 2025)
- ML17345A199 + (16:47:34, 7 January 2025)
- ML17345A197 + (16:47:35, 7 January 2025)
- ML17345A196 + (16:47:37, 7 January 2025)
- 05000251/LER-1988-005-01, :on 880425,calibr of Nuclear Instrumentation Sys Power Range Detectors Performed Late.Caused by Personnel Error.Digital Data Processing Sys Repaired & Group Responsible for Performance Discussed Event + (16:47:42, 7 January 2025)
- ML17345A194 + (16:47:43, 7 January 2025)
- ML17345A192 + (16:47:45, 7 January 2025)
- IR 05000250/1988009 + (16:47:46, 7 January 2025)
- ML17345A189 + (16:47:48, 7 January 2025)
- L-88-234, Responds to Violations Noted in Insp Repts 50-250/88-07 & 50-251/88-07.Corrective Actions:Plant Change/Mods Implemented to Provide Seismic Gauges Which Will Remain Valved in at All Times + (16:47:49, 7 January 2025)
- ML17345A186 + (16:47:52, 7 January 2025)
- L-88-237, Responds to Generic Ltr 88-03, Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Procedural Controls Will Be Identified in Plant Procedures as NRC Commitments,To Ensure That Controls Maintained + (16:47:53, 7 January 2025)