Forwards Proof & Review Version of Revised Tech Specs,For Comment by 880708
ML17345A241
Person / Time
Site: Turkey Point  
Issue date: 06/09/1988
From: Edison G
Office of Nuclear Reactor Regulation
To: Conway W
FLORIDA POWER & LIGHT CO.
References
TAC-65038, TAC-65039, NUDOCS 8806200130
Download: ML17345A241 (4)


Text

gyp REgii Wp

'I 0

A,0 C

O IVl

+

~O

+w*w+

UNITED STATES NUCLEAR REGULATORY COMiVIISSION WASHINGTON, D. C. 20555 June 9,

1988 Docket Nos.

50-250 and 50-251 Mr.

W. F.

Conway Senior Vice President - Nuclear Nuclear Energy Department Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 Dear h1r.

Conway:

SUBJECT:

TURKEY POINT TECHNICAL SPECIFICATIONS IMPROVEMENT PROGRAM -

ISSUANCE OF PROOF AND REVIEW VERSION FOR COMMENT (TAC NOS.

65038 AND 65039)

Set ~

zC~/t'cS~

The purpose of this letter is to transmit for your review and comment the "Proof and Review" version of revised Technical Specifications (TS) for Turkey Point Units 3 and 4.

We request that you provide written comments on the draft by July 8, 1988.

The development of revised TS by Florida Power and Light Company (FP8L) has been underway for severa 1 years.

Many meetings have been held with the NRC staff in this effort to upgrade the Turkey Point TS toward Standard TS.

A major milestone in the program is NRC's issuance of a "Proof and Review" version.

This version is a draft TS which represents the current position of the Technical Specifications Branch in the Office of Nuclear Reactor Regulation.

Please recognize that the NRC staff is still studying some of the TS issues, and we expect to further discuss these

issues, along with your comments, with your staff over the next few months.

We intend to complete this work and issue a license amendment with the new TS before the end of 1988.

After the technical issues have been resolved, FPSL should submit a Final Draft TS for NRC's final approval and for incorporation into the licenses.

We request your certification at that time that the Final Draft TS are consistent with the current design of Turkey Point, with the updated FSAR, and with the as-built plant.

In addition, we request your certification at that time that each speci-fication in the current license TS has been accounted for in the Fina,l Draft by:

(I) direct transfer, except for editorial and format changes, (2) substitution of an appropriate Standard TS, or (3) submittal of justification for other changes.

8806200f30 880609 PDR ADOCK 05000250 P

PD~R '.

June 9, 1988 Hr.

W. F.

Conway If you have any questions concerning the above, please contact the undersigned.

Sincerely,

Enclosure:

As stated Gordon E. Edison, Sr. Projec't ttanager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc w/enclosure:

See next page DISTRIBUTION NRC 5 Local PDRs PD22 Reading S.

Varga w/o encl.

G. Lainas w/o encl.

D. l1iller w/o encl.

G. Edison H. Berkow w/o encl.

OGC-WF E. Jordan w/o encl.

J. Partlow w/o encl.

ACRS (10)

Gray File C.

h1oon (w/o encl,.)

E. Butcher R.

Emch E. Tourigny" Lg II-2 Dti e

6/ g/8 PP.

-2 0:P.

-2 6/g /88 6/ ~/88

Mr.

W. F.

Conway Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Rooni 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. J.

Odom, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Ta l 1ahassee, Florida 32399-0700 Intergovernmental Coordination arid Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Flor ida 32304 Plant Manager Turkey, Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102