Grants Extension for Issuance of Revised Engineering Evaluation for Operation of Component Cooling Water HX to 881231 Per 880509 Request
ML17345A269
Person / Time
Site: Turkey Point  
Issue date: 06/24/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8807130185
Download: ML17345A269 (10)


Text

JUN 2 4 ISIIg 0

Florida Power and Light Company ATTN:

Mr.

W. F.

Conway Senior Vice President

- Nuclear P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

CCW CONTINUOUS TUBE CLEANING SYSTEM PERFORMANCE TESTING In your letter (L-88-127) dated May 9,

1988, you requested an extension for the issuance of the revised engineering evaluation for the operation of the component cooling water (CCW) heat exchangers.

The extension will allow the satisfactory completion of a four-month performance test of the continuous tube cleaning system for Unit 3 and for Unit 4 if installation is completed to allow testing.

You are granted the requested extension, which will require an engineering evaluation to be issued by the end of December 1988.

Should you have any questions concerning this letter, please contact us.

Sincerely, Original signed by Luis'A. Reyes Luis A. Reyes, Director Division, of Reactor Projects cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant J. Cross, Plant Manager J. Arias, Jr., Regulatory and Compliance Supervisor L. W. Bladow, Plant QA Superintendent bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor

Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk State of Florida RI I RI I RII H hristensen Crlehjak bolson 6/)

/88 6() /88 6~/88 8807130185 880624 PDR ADOCK 05000250 P

PNU C, QeoKu

'/~o/es

A<I,zJJ'

<J, LJJ L)lhl~DULlUA Qgg Q4g Jgg'J JQg REGULATO.

INFORMATION DISTRIBUTION "'EM (RIDS)

ACCESSION NBR:8807130185 DOC.DATE: 88/06/24 NOTARIZED:

NO DOCKET 4

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power,and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME 'UTHOR AFFILIATION REYESiL.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.

Florida Power a Light Co.

SUBJECT:

CCW continuous tube cleaning sys performance testing.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR I

ENCL Z)

SIZE:

/

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DEPY EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISONiG DEDRO.

NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE LIE N,J EG FIL 02 0

FILE Ol NRC PDR COPIES LTTR ENCL 8

I S

h TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL

June 20, 1988

+ DISTRIBUTION e/c encl.

Docket File PD 22 Rd g ETouri gny GEdi son DHi 1 1 er DOCKET NO(S) 50-250/251 50-335/389 SEE NEXT PAGE

SUBJECT:

TURKEY POINT UNITS 3 HAD 4, ST.

LUCIE UNITS 1 AND 2 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated

. Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated Lsee page(s) j Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Q Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated Q] Monthly Operating Report for A ril 1988 transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation See next page OFFICE)

SURNAME(

DATEP

~ ~ ~

~ ~

~

6/~ /88

~ ~

~ ~

~ ~ ~

~ ~ ~

~ ~

~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~

NRC FORM 3181IOIBDI NRCM 0240 OFFtCIAL RECORD COPY

1

Turkey Point 3 and 4

cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration U. S.

Department of Commerce Room 6814 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William Cunningham FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

St. Lucie 182 cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U. S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration U. S. Department of Coaeerce-Room 6814 14th 5 Constitution Ave.,

NW Washington, DC 20230 Dr. William Cunningham FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, ND 20899 EIS Review Coordinator EPA Region IV 345 Courtland Street, NE

Atlanta, GA 30365

June 20, 1988 DISTRIBUTION iDocket File n/o enc~l.

PDII-2 Rdg. w/o encl.

GEdison w/encl.

DMiller w/encl.

DOCKET NO(S).

50-250/251 Hr. N. F. Conway Senior Vice President Nuclear Nuclear Energy Depar tment Florida Power and Light Company Juno Beach, Florida 33408%420

SUBJECT:

TURKEY POINT UNITS 3 AND 4 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environment'al Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating Li.cense, dated x Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated 06/15/88

[see page(s)]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated Encl osures:

As stated See next page Division of Reactor Projects I/II Office of Nuclear Reactor Regulation OFFICE)

SURNAME)

PATE)

D rbd "o6r)9'ss-"

~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~

~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

HRC FORM 318 IIO/80I NRCM 0240 0 FF ICIAL R ECOR D CO PY

I

tune 16, 1988 DISTRIBUTION

+Docket File w/a~eccl.

PDII-2,Rdg. w/o encl.

G. Edison w/encl.

D.,Hiller w/encl.

DOCKET NO(S).

50-250/1 Nr. F.

W. Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420 SUBJECT-TURKEY POINT UNITS 3 AND 4 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated 06/01/88

[see page(s) ]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.

, Amendment No.

dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc:

See next page e

OFFICE/

SURNAME)

.i.

OAT/>

LA P

~ ~ ~ ~

~ ~

~ ~ ~ ~ ~

D e :bd

~

0 0

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

/

/88

~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \\

~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~

~ ~ ~ ~

~

~ ~

~

~ ~ ~

~ k ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

taa' 'e~+eee

~ e H >I ~ e ~ ~ i

~ ~ ~ ~ ~ ~ ~ ~i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ e-

~ ~ ~ ~

+ oval ae

~

~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

NRO FORM 3IB IIO/80) NRCM 0240 OFFICIAL RECORD COPY 1

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

1

~

4

~

~ ~ g K