Forwards Insp Repts 50-250/88-12 & 50-251/88-12 on 880606- 10.No Violations or Deviations Noted
ML17345A261
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/01/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A262 List:
References
NUDOCS 8807120147
Download: ML17345A261 (4)


See also: IR 05000250/1988012

Text

JUL 0 i 1988

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

e

Florida Power and Light Company

ATTN:

Mr.

W. F.

Conway

Senior Vice President

- Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/88-12

AND 50-251/88-12

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

J.

L. Kreh on June

6-10,

1988.

The inspection

included

a review of activities

authorized

for your

Turkey

Point facility.

At the

conclusion

of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

Enclosure:

(See

page

2)

Douglas

M. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

8807120147

880701

PDR

ADOCK 05000250

PNU

4

/

Florida Power

and Light Company

Enclosure:

Inspection

Report

cc w/encl:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias,,Jr.,

Regulatory

and Compliance

Supervisor

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

W.

D. Travers,

NRR/EPB

J.

C. Heard, Jr.,

FEMA Region

IV

NRC Resident

Inspector

.

DRS Technical Assistant

State of Florida

Document Control

Desk

RI

RII

R

J

eh

4rTDecker

RCrleeaak

6/~0'88

6/ao/88

6+/88