L-88-240, Forwards mgt-on-shift Weekly Repts,Per NRC 871019 Order

From kanterella
Jump to navigation Jump to search
Forwards mgt-on-shift Weekly Repts,Per NRC 871019 Order
ML17345A213
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/25/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-88-240, NUDOCS 8806070224
Download: ML17345A213 (4)


Text

~

g

'\\-

ACCELZRATZD Mhi BUTION DEMONSTRATION Sy~EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806070224 DOC.DATE-88/05/25 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant,,Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION.

GRACE,J.N.

Region 2, Ofc of the Director

SUBJECT:

Forwards mgt-on-shift weekly rept.

COPIES LTTR ENCL 1

1 1,

1 RECIPIENT ID CODE/NAME NRR/DRP-1/2 EDISON,G DISTRIBUTION CODE:

D036D COPIES RECEIVED:LTR ENCL TITLE: Turkey Point Management Onshift Program NOTES:5'~~

RECIPIENT ID CODE/NAME DRP/ADR-2 PD2-2 PD SIZE:

COPIES LTTR ENCL 1

1 2

2 INTERNAL: AEOD NRR DEPY NRR MORISSEAU,D NRR/ADT 12-G-18 NRR/DOEA DIR 11 NUDOCS-ABSTRACT OGC 15-B-18 RGN2 FILE EXTERNAL: LPDR NSIC 1

1 1.

1 1'

1 1

1 1

1 1

1 1

1 1

1 1

1 1

DEDRO lt NRR DIR NRR/ADP 12-G-18 NRR/DLPQ/PEB NRR/DRIS DIR 9A

.X~"BE,J REG FILE 01 NRC PDR 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 D

Sj A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL 23

BOX 14000, JUNO BEACH, 1 L. 33408 04

I.25 i988 L-88-240 Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Mana ement-on-Shift Weekl Re ort

Dear Dr. Grace:

Pursuant to the Nuclear Regulatory Commission Order dated October 19,

1987, the attached summary of Management-on-Shift (MOS) reports is submitted.

Should there be any questions on this information, please contact us.

Very truly yours, F.

Conway Senior Vice President Nuclear WFC/SDF/gp Attachment cc:

J.

Lieberman, Director, Office of Enforcement, Dr.

G. E. Edison, Project Manager,

NRR, USNRC Senior Resident Inspector, USNRC, Turkey Point R.

E. Talion, President, FPL USNRC Plant ggNj

/pe gl1

+806070224 880525 I DR ADOCK 05000250.

R DCD an FPL Group company

l