L-88-232, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880509
| ML17345A203 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/18/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| L-88-232, NUDOCS 8806060111 | |
| Download: ML17345A203 (4) | |
Text
C XCL,,'LKRATED DISTRIBUTION DEMONST1IION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SUBJECT:
Forwards mgt on shift weekly summary rept for wk starting
,880509.
DISTRIBUTION CODE:
D036D COPIES RECEIVED: LTR / ENCL +
SIZE:
TITLE: Turkey Point Management Onshift Program NOTES:5~c~P RECIPIENT ID CODE/NAME
. DRP/ADR-2 PD2-2 PD COPIES LTTR ENCL 1
1 1
1"'ECIPIENT ID CODE/NAME NRR/DRP-1/2 EDISON,G ACCESSION NBR:8806060111 DOC.DATE: 88/05/18 NOTARIZED: NO DOCKET g
FACIL:50-250 Turkey Point Plant, Unit 3,=-Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION GRACE,J.N.
Region 2, Ofc of the Director R
I A
INTERNAL: AEOD NRR DEPY NRR MORISSEAU,D NRR/ADT 12-G-18 NRR/DOEA DIR 11 NUDOCS-ABSTRACT OGC 15-B-18 RGN2 FILE EXTERNAL: LPDR NSIC 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 DEDRO NRR DIR NRR/ADP 12-G-18 NRR/DLPQ/PEB NRR/DRIS DIR 9A 0 ~XEBERMAN,J G
01 NRC PDR 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 R,
8l TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL 23
,I I y
P. 0 BOX 14000, JUNO BEACH, FL 33408.0420
+qW~
+Ore~~
p I'P Y 93 p>)g MAY. 1 8 1988 L-88-232 Dr. J. Nelson Grace Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Mana ement-on-Shift Weekl Re ort
Dear Dr. Grace:
Pursuant to the Nuclear Regulatory Commission Order dated October 19,
- 1987, the attached summary of Management-on-Shift (MOS) reports is submitted.
The PS-N MOS Reports are also being submitted.
Should there be any questions on this information, please contact us.
Very truly yours'.
F.
Senior way ce President Nuclear WFC/SDF/gp Attachment cc:
J.
Lieberman, Director, Office of Enforcement, USNRC Dr.
G. E. Edison, Project Manager,
- NRR, USNRC Senior Resident. Inspector, USNRC, Turkey Point Plant R. E. Talion, President, FPL 8806060111 880518
'DR ADOCK 05000250 DCD an FPL Group company