| Site: | Turkey Point |
| Issue date: | 05/25/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17345A220 | List: |
| References | |
| NUDOCS 8806070291 | |
| Download: ML17345A219 (3) | |
See also: IR 05000250/1988008
Text
MAY Z 5
1S&8
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr.
W.
F.
Conway
Senior Vice President
- Nuclear
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-250/88-08
and 50-251/88-08
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
D. R. Brewer on March 25,
1988 through April 25,
1988.
The inspection
included
a review of activities
authorized
for your Turkey Point facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selected
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
However,
because
all of the criteria for categorization
of
licensee-identified
violations were met, the violation is not being cited.
The
details
pertaining
to the licensee-identified
violation are described
in the
enclosed
Inspection Report.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Original signed
by
R.
V. Crlenjak (for)
Bruce A. Wilson, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
(See
page
2)
8806070291
880525
ADQCK 05000250
O
Florida Power
and Light Company
MAY 2 5
1988
Enclosure:
NRC Inspection
Report
cc w/encl:
J.
Odom, Vice President
Turkey Point Nuclear Plant
J. Cross,
Plant Manager
Turkey Point Nuclear Plant
L. W. Bladow, Plant equality Assurance
Superintendent
J. Arias, Jr., Regulatory
and Compliance
Supervisor
bcc w/encl:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
~I
CChristensen:lb
05/W/88
J rlenjak
05/z)/88