ML17345A265

From kanterella
Jump to navigation Jump to search
Confirms 880713 Enforcement Conference W/Util in Region II Ofc to Discuss Recent Events (Isolation of Emergency Diesel Generator Fuel Oil Sys) at Facility,Per 880620 Telcon.Notice of Meeting Encl
ML17345A265
Person / Time
Site: Turkey Point  
Issue date: 06/28/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A266 List:
References
NUDOCS 8807120243
Download: ML17345A265 (2)


Text

Florida Power and Light Company ATTN:

Mr.

W.

F.

Conway Senior Vice President

- Nuclear P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

ENFORCEMENT CONFERENCE - TURKEY POINT DOCKET NOS. 50-250 AND 50-251 I

This confirms the telephone conversation between Ms. S. Ferrell, FPLL Corporate licensing, and Mr. H. 0. Christensen of my staff on June 20, 1988, concerning an Enforcement Conference to be conducted at the Region II Office on July 13,

1988, at 1:00 p.m.

The purpose, of this meeting is to discuss the recent events (Isolation of the Emergency Diesel Generator Fuel Oil System) at the Turkey Point facility.

Should you have questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant J.

E. Cross, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant QA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor Original signed by M. L. Ernst (for)

J.

Nelson Grace Regional Administrator bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor

Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk State of Florida OlA0 SAR ROQ.

40 OO SlA SO SM AU C4&

OR ACE OK SR SO Cr" RII~

HChristensen 6/Z5/88 RI RC lenjak i son 6+0[88 6/I )/88 "t

6/$t/88 RII RII L eyes rnst 6/b1/

6P-7188

NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Florida Power and Light Company Name of Facility:

Turkey Point Docket No.:

50-250 and 50-251 Date and Time of Meeting:

July 13, 1988, at 1:00 p.m.

Location of Meeting:

Region II Office, Atlanta, Georgia Purpose of Meeting:

Isolation of Emergency Diesel Generator Fuel Oil System NRC Attendees:

M. L. Ernst, Deputy Regional Administrator L. A. Reyes, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor Safety G.

R. Jenkins, Director, Enforcement and Investigation Coordination Staff B. A. Wilson, Chief, Reactor Projects Branch 2, DRP H.

N. Berkow, Director, Directorate II-2, NRR G. Edison, Project Manager, NRR R.

V. Crlenjak, Chief, Projects Section 2B, DRP D.

R. Brewer, Senior Resident Inspector, Turkey Point Licensee Attendees:

W. F.

Conway, Senior Vice President J.

W. Dickey, Vice President, Nuclear Energy J.

S.

Odom, Site Vice President, Turkey Point J.

E. Cross, Plant Manager, Turkey Point J. Arias, Turkey Point Regulatory Compliance L.

W. Pearce, Operations Superintendent NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 2:00 p.m.,

July ll, 1988, via telephone call to H. Christensen FTS:

242-4187.

Approved by.

Original si gned by Richard V. Crlenjak, Chief Reactor Projects Section 2B Distribution:

J. Taylor, Deputy Executive Director for Regional Operations J. Lieberman, Director, Office of Enforcement W. Troskoski, Regional Coordinator, EDO G. Lainas, Assistant Director for Region II Reactors, NRR H

ristensen 6'/88 R

I R rlenjak B bolson 6/yq/88.

6/y7/88 RI I He RII i

RII LR yes MErnst 6/y)/88 6/

/88