ML17345A189
| ML17345A189 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/23/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Woody C Florida Power & Light Co |
| Shared Package | |
| ML17345A190 | List: |
| References | |
| NUDOCS 8806020032 | |
| Download: ML17345A189 (6) | |
See also: IR 05000250/1988009
Text
'<<AC CELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
cj
REGULATORY XNFORMATXON DISTRIBUTION SYSTEM (RIDS)
SION NBR:8806020032
DOC.DATE: 88/05/23
NOTARIZED: NO
~ IL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
50-251 Turkey Point Plant, Unit 4,'Florida Power and Light C
AUTH.NAME
AUTHOR AFFILIATION
CLINE,W.E.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
WOODYiC.O.
Florida Power
& Light Co..
DOCKET
05000250
05000251
DISTRXBUTION CODE:
IE04D
COPIES
RECEIVED:LTR
TITLE: Safeguards
Inspection
Rpt/NOV Response
NOTES
SUBJECT:
Forwards Insp Rept 50-250/88-09
& 50-251/88-09
on 880418-22.
No violations or deviations noted.
ENCL
SIZE:
50
DKT) Publicly Avax a
RECIPIENT
ID CODE/NAME
PD2-2
LA
EDISON,G
INTERNAL: AEOD/DOA
NRR/DRIS/SIB 'A
NUDOCS-ABSTRACT
RGN2
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
0
1
1
1
0
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD2-2
NRR/DRIS/SGB
9D
N
S/ILRB12
02
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
0
1
1
1
1
A
e
D
'TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
13
ENCL
10
'
-'">>w'/.ih'Qg
MAY23 1988
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-250/88-09
AND 50-251/88-09
0
This refers
to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by Ms. 0.
Masnyk
on April 18-22,. 1988.
The inspection
included
a review of
activities
authorized
for your Turkey Point facility.
At .the conclusion
of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the inspection,
no violations or deviations
were identi-
fied.
In accordance
with 10
CFR 2.790(d)
and
10
CFR 73.21,
safeguards
activities
and
security measures
a'e
exempt from public disclosure.
Therefore,
the enclosure
to this letter with the exception
of the report cover page,
which presents
a
nonexempt
summary, will not be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please'contact
us.
Sincerely,
e
Enclosure:
(See
page
2)
William E. Cline, Chief
Nuclear Material s Safety
and
Safeguards
Branch
Division of Radiation Safety
and Safeguards
',:~,FEGUARDS INFORMATIG"I
SS06020032
SS0523
ADOCK 05000250
9
~
SAFE"": ' "'-
i ~ -un,'MATIQM
2
MP,Y 23 )988
Florida Power and Light Company
Enclosure:
NRC Inspection
Report
cc w/encl:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
C. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
J. Arias, Jr.,
Regulatory
and Compliance
Supervisor
bcc w/encl:
G.
E. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
State of Florida
RII
0 asnyk:ser
05/i1 /88
D cGuire
RCrlenjak
.
L
es
05/g5'88
05/g
88
0 /
/88
'."~~oaui>z r
SAFEGUARDS NFORMATIQN,;"""""'s-~i"i~"'