Forwards Insp Rept 50-250/88-09 & 50-251/88-09 on 880418-22. No Violations or Deviations Noted
ML17345A189
Person / Time
Site: Turkey Point  
Issue date: 05/23/1988
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17345A190 List:
References
NUDOCS 8806020032
Download: ML17345A189 (6)


See also: IR 05000250/1988009

Text

'<<AC CELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

cj

REGULATORY XNFORMATXON DISTRIBUTION SYSTEM (RIDS)

SION NBR:8806020032

DOC.DATE: 88/05/23

NOTARIZED: NO

~ IL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

50-251 Turkey Point Plant, Unit 4,'Florida Power and Light C

AUTH.NAME

AUTHOR AFFILIATION

CLINE,W.E.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

WOODYiC.O.

Florida Power

& Light Co..

DOCKET

05000250

05000251

DISTRXBUTION CODE:

IE04D

COPIES

RECEIVED:LTR

TITLE: Safeguards

Inspection

Rpt/NOV Response

NOTES

SUBJECT:

Forwards Insp Rept 50-250/88-09

& 50-251/88-09

on 880418-22.

No violations or deviations noted.

ENCL

SIZE:

50

DKT) Publicly Avax a

RECIPIENT

ID CODE/NAME

PD2-2

LA

EDISON,G

INTERNAL: AEOD/DOA

NRR/DRIS/SIB 'A

NUDOCS-ABSTRACT

RGN2

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

1

1

0

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD2-2

PD

NRR/DRIS/SGB

9D

N

S/ILRB12

02

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

0

1

1

1

1

A

e

D

'TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

13

ENCL

10

'

-'">>w'/.ih'Qg

MAY23 1988

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/88-09

AND 50-251/88-09

0

This refers

to the Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by Ms. 0.

Masnyk

on April 18-22,. 1988.

The inspection

included

a review of

activities

authorized

for your Turkey Point facility.

At .the conclusion

of

the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the inspection,

no violations or deviations

were identi-

fied.

In accordance

with 10

CFR 2.790(d)

and

10

CFR 73.21,

safeguards

activities

and

security measures

a'e

exempt from public disclosure.

Therefore,

the enclosure

to this letter with the exception

of the report cover page,

which presents

a

nonexempt

summary, will not be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please'contact

us.

Sincerely,

e

Enclosure:

(See

page

2)

William E. Cline, Chief

Nuclear Material s Safety

and

Safeguards

Branch

Division of Radiation Safety

and Safeguards

',:~,FEGUARDS INFORMATIG"I

SS06020032

SS0523

PDR

ADOCK 05000250

9

DCD

~

SAFE"": ' "'-

i ~ -un,'MATIQM

2

MP,Y 23 )988

Florida Power and Light Company

Enclosure:

NRC Inspection

Report

cc w/encl:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

DRS Technical Assistant

Document Control

Desk

State of Florida

RII

0 asnyk:ser

05/i1 /88

D cGuire

RCrlenjak

.

L

es

05/g5'88

05/g

88

0 /

/88

'."~~oaui>z r

SAFEGUARDS NFORMATIQN,;"""""'s-~i"i~"'