Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1996-002, :on 960110,evaluation Determined That Motor Operated Gate Valves Susceptible to Pressure Locking & Thermal Binding.Caused by Inability to Meet GL 95-07 Criteria.Test Procedure Changed + (06:06:52, 6 January 2025)
- TAC:M93960 + (06:06:53, 6 January 2025)
- ML18101B277 + (06:06:55, 6 January 2025)
- TAC:M94418 + (06:06:56, 6 January 2025)
- ML18101B276 + (06:06:57, 6 January 2025)
- ML18101B275 + (06:06:58, 6 January 2025)
- ML18101B274 + (06:06:59, 6 January 2025)
- ML18101B273 + (06:07:00, 6 January 2025)
- ML18101B271 + (06:07:01, 6 January 2025)
- ML18101B269 + (06:07:02, 6 January 2025)
- SCH96-026, Industrial Process Waste Water Sludge Rept for Non-Radiological Liquid Waste Disposal Sys for Dec 1995 + (06:07:03, 6 January 2025)
- ML18101B266 + (06:07:05, 6 January 2025)
- IR 05000272/1996003 + (06:07:07, 6 January 2025)
- ML18101B263 + (06:07:08, 6 January 2025)
- ML18101B260 + (06:07:09, 6 January 2025)
- ML18101B258 + (06:07:10, 6 January 2025)
- ML18101B257 + (06:07:11, 6 January 2025)
- ML18101B252 + (06:07:12, 6 January 2025)
- ML18101B250 + (06:07:13, 6 January 2025)
- ML18101B249 + (06:07:13, 6 January 2025)
- ML18101B247 + (06:07:14, 6 January 2025)
- ML18101B246 + (06:07:16, 6 January 2025)
- ML18101B244 + (06:07:17, 6 January 2025)
- ML18101B243 + (06:07:19, 6 January 2025)
- IR 05000272/1996004 + (06:07:20, 6 January 2025)
- ML18101B239 + (06:07:22, 6 January 2025)
- ML18101B237 + (06:07:24, 6 January 2025)
- ML18101B235 + (06:07:24, 6 January 2025)
- ML18101B234 + (06:07:25, 6 January 2025)
- PNO-I-96-010, on 960223,util Announced Restart of Unit 1 Will Be Delayed for Indefinite Period to Assess Condition of Four Sgs.Restart of Unit 2 Remains Scheduled for Third Quarter of 1996 + (06:07:27, 6 January 2025)
- ML18101B232 + (06:07:28, 6 January 2025)
- 05000272/LER-1995-029, :on 951219,all 4 Kv Vital Busses Declared Inoperable.Caused by Inadequate Initial Design of GE Type SBM Switches by Mfg.Replaced All Suspect Switches in 4 Kv Switchgear + (06:07:30, 6 January 2025)
- ML18101B230 + (06:07:31, 6 January 2025)
- ML18101B228 + (06:07:32, 6 January 2025)
- ML18101B227 + (06:07:34, 6 January 2025)
- ML18101B226 + (06:07:35, 6 January 2025)
- ML18101B225 + (06:07:36, 6 January 2025)
- ML18101B224 + (06:07:39, 6 January 2025)
- ML18101B222 + (06:07:40, 6 January 2025)
- ML18101B221 + (06:07:41, 6 January 2025)
- ML18101B220 + (06:07:42, 6 January 2025)
- ML18101B218 + (06:07:43, 6 January 2025)
- ML18101B216 + (06:07:43, 6 January 2025)
- ML18101B214 + (06:07:45, 6 January 2025)
- 05000311/LER-1996-001-01, :on 960109,TS Violation Occurred Re Failure to Perform Chemistry Sampling within Required Timeframe.Caused by Personnel Error.Personnel Counseled & Chemistry Dept Shift Turnover Process Improved + (06:07:47, 6 January 2025)
- IR 05000272/1995021 + (06:07:54, 6 January 2025)
- ML18101B209 + (06:07:55, 6 January 2025)
- 05000272/LER-1996-001, :on 960103,discovered Insufficent Thermal Overload Relay Heater Margin.Caused by Inadequate Design of TOLs in 1970s.Issued Calculation ES-18.007 for Sizing of Thermal Overload Heaters for SR Rotating Loads + (06:07:57, 6 January 2025)
- ML18101B205 + (06:07:59, 6 January 2025)
- ML18101B204 + (06:08:04, 6 January 2025)
- ML18101B202 + (06:08:05, 6 January 2025)
- ML18101B201 + (06:08:06, 6 January 2025)