Louis F. Storz Public Service Electric and Gas Company Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations FEB 0 6 1996 LR-N96004 LCR S96-0l United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
REQUEST FOR LICENSE AMENDMENT 125V BATTERY CHARGER SURVEILLANCE SALEM GENERATING STATION UNITS 1 AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) hereby submits an application for amendment to Appendix A of Facility Operating Licenses DPR-70 (Unit 1) and DPR-75 (Unit 2).*
This is being filed in accordance with 10CFR50.90.
Pursuant to the requirements of 10CFR50.91(b) (1), PSE&G has provided a copy of this amendment request to the State of New Jersey.
This license amendment proposes to change the Salem Generating Station Units 1 and 2 Technical Specifications (TS) to lower the 125V Battery Charger surveillance amperage from at ieast 200 amps to at least 170 amps.
Salem is in the process of upgrading plant equipment to add greater reliability and resolve spare parts concerns.
As such, the 125V battery chargers are to be replaced during the present unit shutdown.
The proposed change is needed because supply cabling to the replacement battery chargers is calculated to limit charger output to less than the existing TS value.
The cabling does, however, have sufficient capacity to allow the replacement chargers to restore the battery from the design minimum charge to its fully charged state while supplying normal steady-state loads as required by the design basis.
9602130275 960206 PDR ADOCK 05000272 P
- /1>t. Printed on
~
Recycled Paper
Document Control Desk LR-N96004
- FEB 0 6 1996 Battery charger replacement for Salem Unit 1 is scheduled for March 28, 1996.
The replacement battery chargers may not be able to support the existing surveillance requirements.
Battery charger operability is required in all Modes.
It will take 3 days to implement the approved amendment.
In order to implement this license change to assure charger operability, PSE&G requests that this amendment request be approved before March 25, 1996.
PSE&G is also pursuing a hardware modification to the replacement chargers that would mitigate the impact on the AC input cabling.
However, the feasibility and schedule of this potential modification is such that it may not be possible to accomplish the necessary changes in support of the outlined replacement schedule.
A description of the requested amendment, supporting information and analyses for the change and the basis for a no significant hazards consideration determination are provided in Attachment 1.
The Technical Specification pages affected by the proposed change are marked-up in Attachment 2.
Should you have any questions regarding this request, please do not hesitate to contact us.
Attachments (2)
Affidavit Sincerely,
Document Control Desk LR-N96004
- C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. N. Olshan, Licensing Project Manager -
Salem
- u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. c. s. Marschall (X24)
USNRC Senior Resident Inspector Mr. Kent Tosch, Manager, IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 FEB 0 6 1996,
. I REF:
LR-N96004 STATE OF NEW JERSEY SS.
COUNTY OF SALEM L. F. Storz, being duly sworn according to law deposes and says:
I am Senior Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.
Subscribed and swqrn to before m~ this day of o~ ' 1996
~~~
O,.~*A Notary°F&biic of2Jhe~y ELIZABETH J. KIDD NOTARY PUBLIC OF NEW JERSEY My Commission Expires April 25, 2000 My Commission expires on lfk.s-h trn
~~71-+-~7~"--"--'-~~~~~~~
If